Note: Participation in this review is voluntary, non-compensable, and will not prevent you from submitting a bid for the project.  Anything you choose to share will remain in confidence.  Any Contractor that is prequalified with TDOT's Construction Division may request participation by completing and submitting a Letter of Interest to Jonathan Vest at Jonathan.Vest@tn.gov.


1-24 Interchange SR-15 Exit 134 photo

Project Description

Reconstructing SR-15 through the I-24 interchange, including bridge replacement and ramp reconstruction.


Scope

Proposed improvements include the following to improve operations, safety, and modernization of the interchange:  

  • Remove the two SR-15 bridges and replace with a single 3-span concrete bridge with walled abutments;
  • Remove the railroad bridge;
  • Reconfigure 3,200-ft of SR-15 to a 3-lane curbed roadway, with bicycle and pedestrian facilities including extension        of the Mountain Goat Trail between Indigo Lane and SR-2 (US-41);
  • Reconstruct the ramps between I-24 and the roundabouts;
  • Replace interchange lighting with high mast and offset.


Challenges

The project location and existing interchange configuration are contributing factors in anticipated challenges. The interchange is a partial cloverleaf with all ramps being on the east side, such that overhead bridge work that cannot be completed above live traffic is not easily detoured.

  • All work overhead of I-24 without a viable detour;
  • Phased demolition of existing bridges, including crane placement;
  • Constructing and maintaining traffic through the proposed roundabouts;
  • Utility relocation along and under I-24.