Erosion Prevention & Sediment Control Handbook

October 31, 2025

Chapters 5-7 of the Erosion Prevention and Sediment Control Handbook are now available for review and comment. 

  • Chapters 5-7
    • 5.0 Equivalency and Treatment Trains
    • 6.0 Case Studies and Problem Solving
    • 7.0 Conversion of Temporary Controls to Permanent Stormwater Treatment

Comments and/or questions can be sent to dwr.engineering@tn.gov through December 4th, 2025.

October 20, 2025

Chapter 4 of the Erosion Prevention and Sediment Control Handbook is now available for review and comment. 

Comments and/or questions can be sent to dwr.engineering@tn.gov through December 4th, 2025.

Handbook Chapter Revision Date Archived Version

Guidance Signature Sheet and Revision History

2025  
Table of Contents 2025 2012
Chapter 1 - Introduction 2024 2012
Chapter 2 - Stormwater Management 2025 2012
Chapter 3 - Erosion Prevention and Sediment Control Plans 2025 2012
Chapter 4 - Overview of Management Practices (fact sheet) in process  2012
Chapter 5 - Preparing the Stormwater Pollution Prevention Plan (SWPPP) in process  2012
Chapter 6 - Integrating Post-Construction Requirements During Construction in process  2012
Chapter 7 - Management Practices in process  2012
Chapter 8 - Problem Solving in process  2012
Chapter 9 - Inspections in process  2012

*The appendices from the 2012 version of the EPSC Handbook have been archived.

The current General NPDES Permit for Storm Water Discharges Associated with Construction Activity documents and forms can be found in the Division's Data Viewer
 

This Page Last Updated: November 14, 2025 at 4:16 PM