EPSC Handbook Chapter 3 3.0 Erosion Prevention and Sediment Control Plans Stream Stabilization 3.3.2.1 Bank Protection 3.3.2.2 Bioengineered Soil Bank Stabilization 3.3.2.3 Temporary Instream Diversion 3.3.2.4 Temporary Stream Diversion 3.3.2.5 Temporary Construction Ford 3.3.2.6 Temporary Culvert Crossing 3.3.2.7 Utility Stream Crossing Protected Areas 3.3.3.1 High Visibility Fencing 3.3.3.2 Riparian Buffer Zones 3.3.3.3 Sensitive Areas 3.3.3.4 Tree Preservation Construction Exit 3.3.4 Construction Exit Pollution Prevention 3.4.1 Chemical Storage 3.4.2 Concrete Washout 3.4.3 Tire Washing 3.4.4 Trash and Debris 3.4.5 Vehicle Maintenance This Page Last Updated: October 7, 2025 at 11:03 AM