S-GRS-1

SPECIAL CASE LONG SPAN GUARDRAIL 1 POST, 2 OR 3 POSTS OMITTED
S-GRS-1

(Click image to open PDF)

Latest Revision Note

06/15/2021    REVISED THE DESCRIPTION OF THE STANDARD DRAWING. ONE OMITTED POST DRAWING AND THE SECTION. ADDED DRAWINGS FOR 2 OR 3 OMITTED POSTS. REVISED GENERAL NOTES (C), (D), (E), (F) AND (H). ADDED GENERAL NOTES (I) AND (J).

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
RD11-TS-SERIES RD11 TYPICAL SECTIONS AND DESIGN CRITERIA FOR SLOPE CRITERIA
S-GRS-3 SPECIAL CASE: GUARDRAIL FOOTING GUARDRAIL WITH FOOTING OPTION. IF ANY OF THE CONDITIONS NOTED IN GENERAL NOTES A, C, OR D CANNOT BE MET, THAN USE THE GUARDRAIL WITH FOOTING OPTION AS SHOWN ON STANDARD DRAWINGS
S-GRS-5 SPECIAL CASE WEAK-POST GUARDRAIL ATTACHMENT TO CULVERT IF ANY OF THE CONDITIONS NOTED IN GENERAL NOTES A, C, OR D CANNOT BE MET, THAN USE THE GUARDRAIL WITH FOOTING OPTION AS SHOWN ON STANDARD DRAWINGS
S-GR31-1 GUARDRAIL DETAILS FOR W-BEAM AND POST DETAILS
S-GR31-1C GUARDRAIL GENERAL NOTES AND POST DETAILS FOR W-BEAM AND POST DETAILS
S-PL-6 SAFETY PLAN SAFETY HARDWARE PLACEMENT ON OUTSIDE EDGE FOR GUARDRAIL PLACEMENT DETAILS

Related Item Numbers

ITEM NO. U/M DESCRIPTION
705-06.01 LF W BEAM GR (TYPE 2) MASH TL3
     
     

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
07-11-2013 | 01-29-2016 | 03-28-2017 | 06-28-2019 | 06-15-2021
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM