NPDES Stormwater Multi Sector General Permit for Industrial Activities TNR050000

*** Important Update 12/16/2019***

The current Tennessee Stormwater Multi-Sector General Permit (TMSP) will expire in 2020.

Please check this webpage periodically in the spring of 2020 for updates regarding the new TMSP and when TDEC will be ready to receive updated NOIs for coverage:

If you DO NOT have coverage under the current TMSP:

Review the information on this page to confirm that you need coverage and submit the required documents as soon as possible. Point source stormwater discharges associated with industrial activity are not allowed without coverage under an NPDES Stormwater Permit from the Tennessee Division of Water Resources.

If you have coverage under the current TMSP (Expiration Date: April 14, 2020) and plan to maintain it in the next permit cycle:

Do not submit a Notice of Intent (NOI) for coverage under the new permit until the new permit is issued. We will reach out to all existing permittees with relevant information regarding the draft permit, public hearing(s), final permit issuance, and new NOI submittal. When necessary, permit modifications should be submitted as usual.

If you have coverage under the current TMSP but no longer need it:

Submit the appropriate documentation (e.g. No Exposure, Termination) immediately. 

This is a general NPDES permit required for facilities that have significant industrial materials exposed to rainfall and resulting stormwater.

This permit was issued on: April 14, 2015 and expires on April 14, 2020

TMSP Section 11 Sector Descriptions (Storm Water Discharges Associated With Industrial Activity From....) Summary Permit
A. Timber Products Facilities
A Summary 
B.  Paper And Allied Products Manufacturing Facilities
B Summary
B
C. Chemical and Allied Products Manufacturing Facilities
C Summary
C
D. Asphalt Paving and Roofing Materials and Lubricant Manufacturers
D Summary
D
E. Glass, Clay, Cement, Concrete, and Gypsum Product Manufacturing Facilities 
E Summary
E
F. Primary Metals Facilities
F Summary
F
G. Metal Mining (Ore Mining and Dressing) Facilities
  G
H. Inactive Coal Mines Not Under SMCRA Bond and Inactive Coal Mining-Related Facilities
H Summary
H
I. Oil and Gas Extraction Facilities I Summary
I
J. Construction Sand and Gravel Mining and Processing and Dimension Stone Mining and Quarrying Facilities
J Summary
J
K. Hazardous Waste Treatment, Storage, or Disposal Facilities
K Summary
K
L. Landfills and Land Application Sites
L Summary
L
M. Automobile Salvage Yards
M Summary
M
N. Scrap Recycling and Waste Recycling Facilities
N Summary
N
O. Steam Electric Power Generating Facilities, Including Coal Handling Areas 
O Summary
O
P. Motor Freight Transportation Facilities (TF), Passenger TF, Petroleum Bulk Oil Stations and Terminals, Rail TF, and United States Postal Service TF
P Summary
P
Q. Water Transportation Facilities That Have Vehicle Maintenance Shops and/or Equipment Cleaning Operations
Q Summary
Q
R. Ship and Boat Building or Repairing Yards
R Summary
R
S. Vehicle Maintenance Areas, Equipment Cleaning Areas, or Deicing Areas Located at Air Transportation Facilities
S Sampling
S Non-Sampling S
T. Treatment Works
T Summary
T
U. Food and Kindred Products Facilities
U Summary
U
V. Textile Mills, Apparel, and Other Fabric Product Manufacturing Facilities
V Summary
V
W. Wood and Metal Furniture and Fixture Manufacturing Facilities
W Summary
W
X. Printing and Platemaking Facilities X Summary X
Y.  Rubber, Miscellaneous Plastic Products, and Miscellaneous Manufacturing Industries
Y Summary
Y
Z. Leather Tanning and Finishing Facilities
Z Summary
Z
AA. Fabricated Metal Products Industry
AA Summary
AA
AB. Facilities That Manufacture Transportation Equipment, Industrial, or Commercial Machinery
AB Summary
AB
AC. Facilities That Manufacture Electronic and Electrical Equipment and Components, Photographic and Optical Goods
AC Summary
AC
AD. Facilities That Are Not Covered Under Sectors A Thru AC
AD Summary
AD
AE. Facilities That Are Not Covered Under Sectors A Thru AC (no monitoring)
AE Summary
AE
AF. Borrow Pits, Soil Harvesting Sites and Spoil Piles
AF Summary
 AF