EC-STR-30A
INSTREAM DIVERSION (WITH TRAFFIC)Related Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
EC-STR-1 | DEWATERING STRUCTURE | FOR INSTALLATION DETAILS AND ITEM NUMBERS FOR DEWATERING STRUCTURE. |
EC-STR-2 | SEDIMENT FILTER BAGS | FOR INSTALLATION DETAILS AND ITEM NUMBERS FOR SEDIMENT FILTER BAG. |
EC-STR-3B | SILT FENCE | FOR INSTALLATION DETAILS AND ITEM NUMBERS FOR SILT FENCE |
EC-STR-3C | SILT FENCE WITH WIRE BACKING | FOR INSTALLATION DETAILS AND ITEM NUMBERS FOR SILT FENCE WITH WIRE BACKING |
EC-STR-30 | INSTREAM DIVERSION (WITHOUT TRAFFIC) | WHEN THE ROADWAY IS CLOSED TO TRAFFIC, OR A RUNAROUND IS USED, DURING CONSTRUCTION. FOR TYPICAL CROSS-SECTION. |
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
209-65.04 | L.F. | TEMPORARY IN STREAM DIVERSION | |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
01-01-2010 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: January 17, 2019 at 10:51 AM