EC-STR-21
PERMANENT RIPRAP BASIN ENERGY DISSIPATORSLatest Revision Note
05/04/2022 NOTE TO DESIGNER NOTE WAS ADDED. THE RIPRAP BASIN LOCATIONS DIMENSIONS AND QUANTITIES TABLE WERE UPDATED AND NOTE ADDED. REDREW SHEET.
Related Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
203-01 | C.Y. | ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) | |
709-05.06 | TON | MACHINED RIP-RAP (CLASS A-1) | |
709-05.08 | TON | MACHINED RIP-RAP (CLASS B) | |
709-05.09 | TON | MACHINED RIP-RAP (CLASS C) | |
740-10.03 | S.Y. | GEOTEXTILE (TYPE III)(EROSION CONTROL) |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
10-26-1992 | 12-18-1995 | 05-27-2001 | 04-01-2008 | 08-01-2012 | 05-04-2022 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 14, 2022 at 1:27 PM