Producer List
6601 Centennial Boulevard
Nashville, TN 37243 0360
Phone: 615.350.4100
Fax: 615.350.4128
The TDOT Producer List is prepared and provided by both HQ Materials & Tests Field Operations and by Regional Materials & Tests.
The producers providing materials from the following categories must successfully fulfill the requirements as described in the Approval Procedure Documents shown below as well as any related SOPs or Specifications in order to be included on TDOT’s Producer List.
Producers who require a name change will need to submit a letter on the company letter head as well as an updated Quality Control Plan stating the new producer name to Headquarters Materials and Tests at: hq.materialsandtests@tn.gov
Only those facilities included on the Producer’s List for the categories listed below are approved for use on a TDOT project.
For more information on the Producer Report, contact the appropriate Regional Materials Supervisor:
Region 1 (Knoxville) Region 2 (Chattanooga)
Brad Baskette Tony Renfro
Phone: 865.594.4552 Phone: 423.510.1190
Email: Brad.Baskette@tn.gov Email: Tony.Renfro@tn.gov
Region 3 (Nashville) Region 4 (Jackson)
Kevin Isenberg Lindsey Skaggs
Phone: 615.350.4312 Phone: 731.935.0216
Email: Kevin.Isenberg@tn.gov Email: Lindsey.Skaggs@tn.gov
PRODUCT CATEGORY | APPROVAL PROCEDURE DOCUMENTS | Revision Date |
|
Aggregate | Aggregate Producer Procedures | September 2024 |
|
Asphalt: | |||
Asphalt Cement | Asphalt Cement Producer Procedures | September 2024 | |
Asphalt Mix | Asphalt Mix Producer Procedures | August 2018 | |
Emulsion | Asphalt Emulsion Producer Procedures | August 2017 | |
Bridge Bearing Pads - Plain & Elastomeric | Bridge Bearing Pad Producer Procedures | September 2024 | |
Cement | Cement Producer Procedures | November 2023 | |
Type IL | Type IL Materials Minute | July 2022 | |
Concrete: |
|||
Ready Mix | Ready Mix Producer Procedures | September 2024 | |
Precast | Precast Producer Procedures | September 2024 | |
Prestressed | Prestress Producer Procedures | September 2024 | |
Fly Ash | Fly Ash Producer Procedures | December 2021 | |
Grass Seed | Grass Seed Producer Procedures |
September 2024 | |
Pipe: | |||
Concrete Pipe | Concrete Pipe Producer Procedures | September 2024 | |
Corrugated Metal Pipe (CMP) | CMP Producer Procedures | September 2024 | |
Polypropylene Pipe (HDPE) | HDPE Producer Procedures |
September 2024 | |
PVC Pipe | PVC Producer Procedures | September 2024 | |
Propylene Pipe (PPP) | PPP Producer Procedures | September 2024 | |
Slag Cement: | Slag Producer Procedures | July 2024 | |
Steel: | |||
Reinforcing Steel and Wire | Reinforcing Steel and Wire Procedures | September 2024 | |
Producer List Report ←
Please allow time for the report to load dropdown lists once selections are chosen.
Regional Asphalt Terminals Updated June 14, 2024
Asterisks (*) next to a Producer name means that the producer at that location has changed names. For previous name affiliations please contact the
Regional Materials Supervisor for that plant location.