S-GRC-4
GUARDRAIL CONNECTION TO BRIDGE RAILING CONCRETE PARAPETLatest Revision Note
07/07/2023 GENERAL NOTE (J) WAS ADDED.
Related Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
D-FLU-2 | BRIDGE END DRAIN FLUME DETAILS | WHEN BRIDGE END DRAIN FLUME IS REQUIRED, USE 12 INCH DEEP BLOCK-OUTS SEE STANDARD DRAWINGS FOR DETAILS |
D-FLU-2A | BRIDGE END DRAIN FLUME DETAILS | WHEN BRIDGE END DRAIN FLUME IS REQUIRED, USE 12 INCH DEEP BLOCK-OUTS SEE STANDARD DRAWINGS FOR DETAILS |
S-GR31-1 | W-BEAM GUARDRAIL | FOR ALL OTHER GUARDRAIL DETAILS AND MATERIAL PROPERTIES NOT SHOWN |
S-GR31-1A | W-BEAM BARRIER FASTENING HARDWARE | FOR BLOCK-OUT DETAILS |
S-GR31-1C | GUARDRAIL GENERAL NOTES AND POST DETAILS | FOR THRIE BEAM POST DETAILS |
S-PL-1 | SAFETY PLAN AT ROADSIDE HAZARDS | VARIABLE LENGTH INCREMENT TO MEET LON |
S-PL-3 | SAFETY PLAN: MINIMUM INSTALLATION AT BRIDGE ENDS | FOR MINIMUM INSTALLATION AT BRIDGE ENDS |
S-SSMB-6F | SINGLE GUARDRAIL ATTACHMENT TO SINGLE SLOPE 51” BARRIER WALL | FOR CONNECTION TO CONCRETE MEDIAN BARRIER WALLS |
STD-1-SERIES | "NEW STRUCTURES" STRUCTURE STANDARD DRAWINGS | FOR BRIDGE RAILING DETAILS |
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
705-06.01 | L.F. | W BEAM GR (TYPE 2) MASH TL3 | |
705-06.20 | EACH | TANGENT ENERGY ABSORBING TERM MASH TL-3 | |
705-06.25 | EACH | THRIE BEAM BRIDGE TRANSITION MASH TL-3 |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
06-28-2019 | 02-28-2020 | 10-16-2020 | 06-15-2021 | 07-07-2023 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 12, 2024 at 11:37 AM