S-GRC-4

GUARDRAIL CONNECTION TO BRIDGE RAILING CONCRETE PARAPET
S-GRC-4

(Click image to open PDF)

Latest Revision Note

07/07/2023    GENERAL NOTE (J) WAS ADDED.

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
D-FLU-2 BRIDGE END DRAIN FLUME DETAILS WHEN BRIDGE END DRAIN FLUME IS REQUIRED, USE 12 INCH DEEP BLOCK-OUTS SEE STANDARD DRAWINGS FOR DETAILS
D-FLU-2A BRIDGE END DRAIN FLUME DETAILS WHEN BRIDGE END DRAIN FLUME IS REQUIRED, USE 12 INCH DEEP BLOCK-OUTS SEE STANDARD DRAWINGS FOR DETAILS
S-GR31-1 W-BEAM GUARDRAIL FOR ALL OTHER GUARDRAIL DETAILS AND MATERIAL PROPERTIES NOT SHOWN
S-GR31-1A W-BEAM BARRIER FASTENING HARDWARE FOR BLOCK-OUT DETAILS
S-GR31-1C GUARDRAIL GENERAL NOTES AND POST DETAILS FOR THRIE BEAM POST DETAILS
S-PL-1 SAFETY PLAN AT ROADSIDE HAZARDS VARIABLE LENGTH INCREMENT TO MEET LON
S-PL-3 SAFETY PLAN: MINIMUM INSTALLATION AT BRIDGE ENDS FOR MINIMUM INSTALLATION AT BRIDGE ENDS
S-SSMB-6F SINGLE GUARDRAIL ATTACHMENT TO SINGLE SLOPE 51” BARRIER WALL FOR CONNECTION TO CONCRETE MEDIAN BARRIER WALLS
STD-1-SERIES "NEW STRUCTURES" STRUCTURE STANDARD DRAWINGS FOR BRIDGE RAILING DETAILS

Related Item Numbers

ITEM NO. U/M DESCRIPTION REMARKS
705-06.01 L.F. W BEAM GR (TYPE 2) MASH TL3  
705-06.20 EACH TANGENT ENERGY ABSORBING TERM MASH TL-3  
705-06.25 EACH THRIE BEAM BRIDGE TRANSITION MASH TL-3  

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
06-28-2019 | 02-28-2020 | 10-16-2020 | 06-15-2021 | 07-07-2023
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM