Roadway, Pavement Appurtenances, and Fences
Revised: April 1, 2024NOTE - This page an all of its child pages on the menu to the left have been transitioned to the Engineering Production Support web site. These pages will remain temporarily but will no longer be updated. Please update your links.
DRAWING | RELATED IB | REVISION DATE | DESCRIPTION |
05/01/2020
|
CONCRETE SHOULDER RUMBLE STRIP DETAIL (FOR 4-LANE DIVIDED HIGHWAY)
|
||
05/01/2020 | CONCRETE SHOULDER RUMBLE STRIP DETAIL (FOR 6-LANE OR WIDER DIVIDED HIGHWAY)
|
||
RP-CS-3 | IB 23-11 | CONCRETE SHOULDER MILLED RUMBLE STRIP DETAILS | |
05/01/2020
|
PORTLAND CEMENT CONCRETE PAVEMENT JOINT TYPES AND SPACING
|
||
05/01/2020 | PORTLAND CEMENT CONCRETE PAVEMENT JOINT TYPES AND SPACING
|
||
05/01/2020
|
TYPICAL ACCELERATION AND DECELERATION LANE JOINT TYPES AND SPACING FOR CONCRETE RAMPS
|
||
05/01/2020
|
CONCRETE RAMP JOINT TYPES AND SPACING
|
||
05/01/2020
|
CONTRACTION AND CONSTRUCTION JOINTS FOR CONCRETE PAVEMENT
|
||
05/01/2020
|
3/4" AND 1 3/4" EXPANSION AND EDGE PAVEMENT JOINTS
|
||
05/01/2020
|
3/4" AND 1 3/4" ELASTOMERIC COMPRESSION JOINT SEALS
|
||
05/01/2020
|
LONGITUDINAL CONTRACTION AND CONSTRUCTION JOINTS
|
||
05/01/2020
|
DOWEL ASSEMBLY DEVICES | ||
01/28/2022
|
DOWEL ASSEMBLY DEVICES | ||
05/01/2020 | DOWEL ASSEMBLY DEVICES | ||
01/28/2022
|
CONCRETE PAVEMENT REPAIR DETAILS
|
||
05/01/2020 | CONCRETE PAVEMENT SPALL AND RANDOM CRACK REPAIR DETAILS
|
||
05/01/2020
|
CONCRETE PAVEMENT JOINT REPAIR DETAILS
|
||
RP-J-26 | STANDARD CONSTRUCTION DETAILS FOR ROUNDABOUTS | ||
RP-EPO-1 | IB 24-03 | EMERGANCY PULL OVER AREA |
DRAWING | RELATED IB | REVISION DATE | DESCRIPTION | |
06/15/2021
|
DETAILS OF STANDARD CONCRETE DRIVEWAYS
|
|||
10/29/2021
|
DETAILS OF LOWERED STANDARD CONCRETE DRIVEWAYS
|
|||
05/01/2020
|
MEDIAN OPENINGS ON 4-LANE DIVIDED HIGHWAY
|
|||
RP-DHO-2 | IB 24-03 | 01/09/2024 | MEDIAN OPENING DETAILS FOR RESTRICTED CROSSING & J-TURN INTERSECTIONS | |
05/01/2020
|
EXAMPLES OF STREET & ALLEY INTERSECTIONS
|
|||
RP-PMR-1 |
05/01/2020 | STANDARD DETAILS FOR PROPOSED PERMANENT MAINTENANCE RAMP
|
||
10/16/2020
|
STANDARD RAMP DETAILS FOR ROADWAYS AND DRIVEWAYS
|
|||
FENCES AND RIGHT-OF-WAY MARKERS | |||
---|---|---|---|
DRAWING | RELATED IB | REVISION DATE | DESCRIPTION |
S-F-1 |
IB 23-04 | 03/01/2023 | HIGH VISIBILITY FENCE |
S-F-10 | 07/17/2020 | STANDARD RIGHT-OF-WAY STOCK FENCE | |
S-F-10A |
06/28/2019 | STANDARD RIGHT-OF-WAY STOCK FENCE WITH TIMBER POSTS | |
S-F-10B |
06/28/2019 | STANDARD RIGHT-OF-WAY CHAIN LINK FENCE | |
S-F-10C |
06/28/2019 | RIGHT-OF-WAY FENCE AT BRIDGE AND BOX CULVERTS | |
S-F-10D |
06/28/2019 | RIGHT-OF-WAY FENCE LOCATIONS AT INTERCHANGES | |
S-FG-11 |
06/28/2019 | STANDARD STOCK FENCE GATE | |
S-FG-20 |
06/28/2019 | EXAMPLES OF WATER GATES AND WATER CROSSINGS | |
S-RP-2 |
06/28/2019 | STANDARD CONCRETE RIGHT-OF-WAY MARKERS | |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 26, 2024 at 12:19 PM