RP-J-23
CONCRETE PAVEMENT REPAIR DETAILSLatest Revision Note
01/28/2022 REMOVED PCC (PLAIN) AND FAST TRACK ITEM NUMBERS 501-01 SERIES FROM GENERAL NOTES (G) AND (M). REVISED GENERAL NOTE (J) . REVISED GENERAL NOTES (L) AND (M) , AND ADDED NEW ITEM NUMBERS.
Related Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
RP-J-9 | CONTRACTION AND CONSTRUCTION JOINTS FOR CONCRETE PAVEMENT | FOR DOWEL PLACEMENT DETAILS. SPACING IS AT 12" CENTER-TO-CENTER BETWEEN DOWELS |
RP-J-15 | LONGITUDINAL CONTRACTION AND CONSTRUCTION JOINTS | SHALL BE OMITTED BETWEEN THE NEW REPLACEMENT SLAB AND THE EXISTING SLAB |
RP-J-24 | CONCRETE PAVEMENT SPALL AND RANDOM CRACK REPAIR DETAILS | CROSS-REFERENCE DRAWING |
RP-J-25 | CONCRETE PAVEMENT JOINT REPAIR DETAILS | CROSS-REFERENCE DRAWING |
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION |
---|---|---|
502-03.20 | C.Y. | FULL DEPTH PCC PAVEMENT REPAIR |
502-03.21 | S.Y. | PARTIAL DEPTH PCC PAVEMENT REPAIR |
502-03.25 | C.Y. | FULL DEPTH PCC PAVEMENT REPAIR HIGH EARLY |
502-03.26 | S.Y. | PARTIAL DEPTH PCC PAVEMENT REPAIR HIGH EARLY |
502-04.01 | L.F. | SAWING CONCRETE PAVEMENT (FULL DEPTH) |
502-04.02 | EACH | LOAD TRANSFER DOWELS |
502-04.03 | EACH | TRANSVERSE DOWEL BARS |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
07-17-1984 | 04-02-1990 | 12-18-1994 | 05-27-1996 | 07-29-1996 | 05-27-2001 | 01-19-2002 | 10-26-2004 | 01-24-2012 | 07-25-2012 | 05-01-2020 | 01-28-2022 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 12, 2024 at 11:37 AM