RP-J-23

CONCRETE PAVEMENT REPAIR DETAILS
RP-J-23

(Click image to open PDF)

Latest Revision Note

01/28/2022    REMOVED PCC (PLAIN) AND FAST TRACK ITEM NUMBERS 501-01 SERIES FROM GENERAL NOTES (G) AND (M). REVISED GENERAL NOTE (J) . REVISED GENERAL NOTES (L) AND (M) , AND ADDED NEW ITEM NUMBERS.

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
RP-J-9 CONTRACTION AND CONSTRUCTION JOINTS FOR CONCRETE PAVEMENT FOR DOWEL PLACEMENT DETAILS. SPACING IS AT 12" CENTER-TO-CENTER BETWEEN DOWELS
RP-J-15 LONGITUDINAL CONTRACTION AND CONSTRUCTION JOINTS SHALL BE OMITTED BETWEEN THE NEW REPLACEMENT SLAB AND THE EXISTING SLAB
RP-J-24 CONCRETE PAVEMENT SPALL AND RANDOM CRACK REPAIR DETAILS CROSS-REFERENCE DRAWING
RP-J-25 CONCRETE PAVEMENT JOINT REPAIR DETAILS CROSS-REFERENCE DRAWING

Related Item Numbers

ITEM NO. U/M DESCRIPTION
502-03.20 C.Y. FULL DEPTH PCC PAVEMENT REPAIR
502-03.21 S.Y. PARTIAL DEPTH PCC PAVEMENT REPAIR
502-03.25 C.Y. FULL DEPTH PCC PAVEMENT REPAIR HIGH EARLY
502-03.26 S.Y. PARTIAL DEPTH PCC PAVEMENT REPAIR HIGH EARLY
502-04.01 L.F. SAWING CONCRETE PAVEMENT (FULL DEPTH)
502-04.02 EACH LOAD TRANSFER DOWELS
502-04.03 EACH TRANSVERSE DOWEL BARS

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
07-17-1984 | 04-02-1990 | 12-18-1994 | 05-27-1996 | 07-29-1996 | 05-27-2001 | 01-19-2002 | 10-26-2004 | 01-24-2012 | 07-25-2012 | 05-01-2020 | 01-28-2022
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: January 31, 2022 at 2:46 PM