EC-STR-25

TEMPORARY CULVERT CROSSING, CONSTRUCTION EXIT, CONSTRUCTION FORD
EC-STR-25

(Click image to open PDF)

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
EC-STR-32 TEMPORARY DIVERSION CULVERTS SEE STANDARD DRAWING FOR ADDITIONAL DETAILS
     
     

Related Item Numbers

ITEM NO. U/M DESCRIPTION REMARKS
203-01 C.Y. ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)  
621-03.02 L.F. 18" TEMPORARY DRAINAGE PIPE  
621-03.03 L.F. 24" TEMPORARY DRAINAGE PIPE  
621-03.04 L.F. 30" TEMPORARY DRAINAGE PIPE  
621-03.05 L.F. 36" TEMPORARY DRAINAGE PIPE  
621-03.06 L.F. 42" TEMPORARY DRAINAGE PIPE  
621-03.07 L.F. 48" TEMPORARY DRAINAGE PIPE  
621-03.08 L.F. 54" TEMPORARY DRAINAGE PIPE  
621-03.09 L.F. 60" TEMPORARY DRAINAGE PIPE  
621-03.10 L.F. 66" TEMPORARY DRAINAGE PIPE  
621-03.11 L.F. 72" TEMPORARY DRAINAGE PIPE  
709-05.05 TON MACHINED RIP-RAP (CLASS A-3)  
709-05.06 TON MACHINED RIP-RAP (CLASS A-1)  
740-10.03 S.Y. GEOTEXTILE (TYPE III)(EROSION CONTROL)  

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 05-27-2001 | 12-18-2002 | 01-22-2003 | 07-29-2003 | 04-15-2006 | 04-01-2008 | 08-01-2012
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: January 17, 2019 at 10:50 AM