Natural Stream Design

Revised: Noverber 9, 2021

NOTE - This page an all of its child pages on the menu to the left have been transitioned to the  Engineering Production Support web site. These pages will remain temporarily but will no longer be updated. Please update your links.

DEFLECTORS, VANES & ENERGY DISSIPATORS
DRAWING RELATED IB REVISION DATE DESCRIPTION
 
05/01/2020
LONGITUDINAL STONE TOE
  05/01/2020
BOULDER CLUSTERS
  05/01/2020
BOULDER CROSS VANE
  05/01/2020
BOULDER CROSS VANE WITH STEP
  05/01/2020
BOULDER W-WEIR
  05/01/2020
BOULDER VANES AND J-HOOK
  11/30/2020
LOG VANES, ROOT WADS, AND BOULDER J-HOOK
  11/30/2020 LOG AND BOULDER STEP POOLS
  05/01/2020
BOULDER RIFFLES
  11/30/2020
LOG RIFFLES
  05/01/2020
CONSTRUCTED ALLUVIAL RIFFLE
  05/01/2020
SUBSTRATE RESTORATION
  05/01/2020
CLAY CHANNEL PLUG
D-NSD-32     05/01/2020 WOOD TOE WITH GEO-LIFTS
D-NSD-32A     05/01/2020 BOULDER TOE WITH GEO-LIFTS
D-NSD-33     05/01/2020 COIR FIBER EROSION CONTROL BLANKET AND COIR FIBER ROLLS
D-NSD-34     05/01/2020 LIVE STAKES AND LIVE SILTATION
D-NSD-35     05/01/2020 LIVE FASCINES
D-NSD-36     05/01/2020 BRUSH MATTRESS
D-NSD-37     05/01/2020 SPECIAL NOTES FOR NATURAL STREAM DESIGN
       

If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 26, 2024 at 12:18 PM