Skip to Main Content

Natural Stream Design

Updated: November 16, 2017
DEFLECTORS, VANES & ENERGY DISSIPATORS
DRAWING REVISION DATE DESCRIPTION
11/01/2016
LONGITUDINAL STONE TOE
09/15/2017
BOULDER CLUSTERS
09/15/2017
BOULDER CROSS VANE
09/15/2017
BOULDER CROSS VANE WITH STEP
09/15/2017
BOULDER W-WEIR
09/15/2017
BOULDER VANES AND J-HOOK
09/15/2017
LOG VANES, ROOT WADS, AND BOULDER J-HOOK
09/15/2017 LOG AND BOULDER STEP POOLS
09/15/2017
BOULDER RIFFLES
09/15/2017
LOG RIFFLES
09/15/2017
CONSTRUCTED ALLUVIAL RIFFLE
 
SUBSTRATE RESTORATION
09/15/2017
CLAY CHANNEL PLUG
D-NSD-32 09/15/2017 WOOD TOE WITH GEO-LIFTS
D-NSD-32A 09/15/2017 BOULDER TOE WITH GEO-LIFTS
D-NSD-33 09/15/2017 COIR FIBER EROSION CONTROL BLANKET AND COIR FIBER ROLLS
D-NSD-34 09/15/2017 LIVE STAKES AND LIVE SILTATION
D-NSD-35 09/15/2017 LIVE FASCINES
D-NSD-36 09/15/2017 BRUSH MATTRESS
D-NSD-37   SPECIAL NOTES FOR NATURAL STREAM DESIGN
     

If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: November 4, 2019 at 1:39 PM