Weekly Roadway Activity Report for TDOT Region 2 (Nov. 7 - 13, 2019)

Thursday, November 07, 2019 | 01:36pm

DISTRICT 27

CUMBERLAND COUNTY I-40 Construction of a truck climbing lane EB near MM 339, including grading, drainage, and paving: Construction signs, guardrail (westbound), and portable barrier rail (eastbound) have been installed. The contractor has begun grade work in the median behind portable barrier rail. Motorists are encouraged to slow down, use caution, and be aware of construction personnel in the work zone and equipment that will entering/exiting the roadway. Estimated project completion date is June 2020.

[Charles Blalock and Sons, Inc./Bradley/CNS298]

CUMBERLAND COUNTY TDOT Maintenance on SR-1 (US-70 E.) in both directions from LM 23.9 to LM 24: TDOT Maintenance will be conducting lane closures with flagging operations in one lane of both directions on SR-101 at 23.9 MM to perform core testing of asphalt. TDOT will perform 8-10 core tests during the lane closures. Motorists are advised to use caution and be alert to all signage while traveling through the work zone. Work will begin at 9:30 AM on 11/07/2019. Estimated project completion is November 2019.

CUMBERLAND COUNTY SR-1 (US-70) Emergency slope stabilization near LM 26.6: Construction signs, portable barrier rail, and temporary traffic signals have been installed. SR-1 (US-70) will be reduced to one lane traffic between Godsey Road and Renegade Mountain Parkway while slope stabilization is in process. Motorists should exercise caution and pay attention to temporary traffic signals as they travel through the work zone.  Estimated project completion date is November 2019.

[Twin K Construction/Bradley/CNT234]

CUMBERLAND COUNTY SR-101 (Peavine Road) Grading, drainage, and paving from Firetower Road to Westchester/Catoosa Boulevard: As grade work progresses, motorists should be alert for shifts in traffic patterns to allow for construction activities. Traffic has been shifted from Lakeview Drive to past Woodgate Circle with the existing Peavine Road serving as a frontage road to access businesses in that area. The posted speed limit has been reduced from 45 MPH to 35 MPH within the work zone. Temporary lane closures may be needed to support paving and other activities. Motorists should reduce speeds on Peavine Road and be alert for construction personnel/equipment entering and exiting the roadway.  Estimated project completion date is November 2020.

[Rogers Group, Inc./Bradley/CNQ921]

DEKALB COUNTY TDOT Bridge Inspection on SR-26 (SPARTA HWY.) in both directions from LM 24.58 to LM 24.58: Bridge inspection will be performing its 2-year inspection on the SR-26 Bridge over the Caney Fork River at LM 24.58 on Tuesday, 11/12/2019 from 8 am till 2 pm. Traffic control will be in place for this inspection.

DEKALB COUNTY SR-96 USACE dam restoration project from LM 12.5 to LM 13.5: One lane is closed and traffic is being controlled by a temporary signal due to the U.S. Army Corps of Engineers dam restoration work. Motorists should exercise caution as they travel through the work zone. Estimated project completion date is June 2020.

[USACE/Utility Permit/MAINT]

DEKALB AND WARREN COUNTY SR-56 Construction of bridges and paving from south of Warren-DeKalb County (LM 24.5) line to East Bryant St (LM 2.9): Clearing and grubbing activities are on-going. Flaggers may be present while equipment is off-loaded or crossing the roadway. Motorists are encouraged to use caution in the work zone.  Estimated project completion date is May 2022.

[Jones Bros. Contractors, LLC/Parnham/CNT011]

FENTRESS COUNTY Rotten Fork Road over the Wolf River Bridge Replacement: The contractor is currently working on the new bridge at Rotten Fork Road at LM 0.135. Rotten Fork Road remains open to traffic while the new bridge is being constructed. The contractor is performing grade work at the beginning of Rotten Fork Road to construct the new roadway alignment so an alternate traffic pattern is in place. Motorists are advised to use caution and watch for construction equipment adjacent to roadway. Estimated project completion date is November 2019.

[Twin K Construction/Moore/CNT901]

FENTRESS COUNTY Vines Ridge Road over Big Laurel Creek Bridge Replacement: Vines Ridge Road remains closed at LM 1.06 and will remain closed until the new bridge is constructed and in place. Approximate date for the length of closure is 11/30/19. Motorists should seek alternate route around Vines Ridge Road near the location of construction. Estimated project completion date is November 2019.

[Twin K Construction/Moore/CNT901]

FENTRESS AND OVERTON COUNTY SR-85 Emergency slide repairs at various locations: The roadway is closed from LM 18.4 to LM 22.4 in Overton county. SR-85 is opened to one lane of traffic in Fentress County between LM 3.50 to 8.00. The contractor is continuing work on this contract in the two areas listed above. The contractor has placed temporary traffic signals and will use portable barrier rail where the roadway will be shut down to one lane to allow traffic to flow through the work zone. Motorists are encouraged to use caution and seek alternate routes. RESTRICTIONS: Loads wider than 10' should seek alternate route. Estimated project completion date is January 2020.

[Wright Brothers Construction Company, Inc./Moore/CNT154]

OVERTON COUNTY Utility Work on SR-85 (HILHAM HWY.) in both directions from LM 10.23 to LM 11.12: Flaggers will be present as workers perform overhead utility work along Hilham Hwy between Windle Community Rd to near the intersection with West Main St. One lane will remain open at all times. Motorists should be prepared for short delays. Beginning 10/31/19 through 11/29/19 between 9 am and 2 pm.

OVERTON COUNTY SR-111 Miscellaneous safety improvements at the intersections of SR-293 (LM 3.1 and LM 3.2): The contractor currently has SR-111 from the LM 2.25 to the 3.75 reduced to one lane in each direction. This lane closure will remain until approximately 11/22/19. In addition to the lane closure, the speed limit through the work zone has been decreased to 55 MPH for the safety of the motoring public and the contractor's personnel. SR-293 is affected at the intersection of SR-111 with the median crossings being closed for the duration of the project. Motorists are encouraged to obey 55 MPH speed limit and watch for construction operations adjacent to the roadway. RESTRICTIONS: Loads wider than 14' should seek alternate route. Estimated project completion date is December 2019.

[Rogers Group, Inc./Moore/CNT184]

OVERTON COUNTY SR-294 Bridge repair over Big Eagle Creek (LM 1.39): The contractor has placed barrier rail and has the roadway reduced to one lane. The roadway will remain reduced to one lane until contract completion scheduled for 06/15/20. During this time, a temporary traffic signal will be in operation to allow traffic to flow through the work zone. Motorists should use caution through the work zone, obey posted speed limit, and be prepared to stop at the traffic signal. RESTRICTIONS: No loads wider than 10 feet. Estimated project completion date is June 2020.

[W and O Construction Company, Inc./Moore/CNT243]

PUTNAM COUNTY I-40 near MM 296 bridge repair on Rocky Point Road over I-40: The Rocky Point Road bridge at LM 9.31 over I-40 is closed due to bridge repairs and is scheduled to re-open November 2019. A detour is in place to guide motorists around the bridge closure. The contractor will be performing lane closures on I-40 11/4/19 through 11/08/19 from 8 PM to 6 AM. Lane closures will be from MM 295 to MM 297 in both the eastbound and westbound directions. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.  Estimated project completion date is November 2019.

[Mid-State Construction Company, Inc./Jolley/CNS355]

PUTNAM COUNTY Utility Work on SR-135 (S. WILLOW AVE.) in both directions from LM 8.6 to LM 9.4: Signage and flaggers will be present for overhead utility work along South Willow Ave between State St and Orchard St and between Humble Road and Interstate Dr. The speed limit will be reduced and motorists should use caution and be aware of personnel and equipment. Work will occur from 11/12/19 - 11/15/19 between 9 am and 2 pm.

PUTNAM COUNTY Utility Work on SR-136 (N. WASHINGTON AVE.) in both directions from LM 4.3 to LM 4.5: Signage and flaggers will be present for overhead utility work along North Washington Ave between East 1st St and East 4th St. The speed limit will be reduced and motorists should use caution and be aware of personnel and equipment. Work will occur from 11/14/19 - 11/15/19 between 9 am and 2 pm.

PUTNAM COUNTY SR-136 Resurfacing from US-70N (SR-24) (LM 4.15) to north of Whiteaker Springs Road (LM 7): Work will be performed on existing sidewalks and concrete curb ramps, as well as placing new pavement on the roadway. This will result in lane closures each night on SR-136 between the hours of 7 PM and 6 AM. Motorists should use caution and be prepared for slowed traffic when traveling through the workzone. Estimated project completion date is June 2020.

[Rogers Group, Inc./Jolley/CNT920]

WHITE COUNTY Utility Work on SR-136 (HAMPTONS CROSSROADS) southbound from LM 19.4 to LM 19.8: THP will assist with a rolling road block for overhead utility work along SR-136 between Robert Matthew Hwy and Airport Road. Signage will be present; motorists should reduce speed and expect short delays. Work will occur on 11/7/19 between 9:30 am and 10:30 am.

WHITE COUNTY SR-1 (US-70) Repair of the bridge over the Calfkiller River (LM 9.35) in Sparta: The Calfkiller Bridge in Sparta is in the third of the three phases of lane closures. These phases will affect between Wilson Street and Church Street. This third phase will restrict traffic to one lane in each direction. Workers will be working on the eastbound side of the bridge. Motorists are advised to use extreme caution and be alert to all construction signage while traveling through the work zone.  Estimated project completion date is November 2019.

[Southern Constructors, Inc./Jolley/CNT110]

 

DISTRICT 28

BLEDSOE COUNTY SR-28 Slope stabilization in Bledsoe County near LM 28.8: The contractor is working on SR-28 north from mile marker 28.7 to 28.9. The roadway will be reduced to one lane controlled by a traffic signal. Large trucks heading South on SR-28 down the mountain are encouraged to use extreme caution.  Estimated project completion date is April 2020.

[Twin K Construction/Voiles/CNT924]

BLEDSOE AND SEQUATCHIE COUNTY SR-8 (US-127) from SR-28 (LM 14.9) to SR-111 then SR-28 (US-127) to south of Old York Hwy North (LM 7.9), SR-8 (US-127) from SR-28 (US-127)(LM 14.9) to SR-111 (LM 17.6), and SR-30 from SR-28 (US-127)(LM 10.3) to near Cherokee Ridge Road (LM 13.3) resurfacing: The contractor has begun work. During construction, motorists are encouraged to use caution and watch for construction equipment and personnel in the roadway. The contractor will be working on the sidewalks through the downtown area. Pedestrians are encouraged to use caution when walking in the area and avoid the areas of construction if at all possible.  Estimated project completion date is June 2020.

[Rogers Group, Inc./Voiles/CNT918]

COFFEE COUNTY Utility Work on I-24 in both directions from MM 14.5 to MM 14.5: THP will assist with a rolling road block and will slow traffic to 15 mph both Northbound and Southbound between Veneer St and Ragsdale Rd. Motorists should be prepared to stop and expect a delay. 11/12/19, 9 am - 10 am.

COFFEE COUNTY SR-2 (US-41) resurfacing from SR-127 (LM 22.3) to the Grundy County line (LM 29.7): This project is substantially complete. The contractor will be working on final punch list items at this time. Estimated project completion date is November 2019.

[Rogers Group, Inc./Hussein/CNT084]

COFFEE COUNTY SR-2 (US-41) Resurfacing from the Rutherford County Line (LM 0.0) to east of Country Club Drive (LM 12.6): Paving installation is underway and will continue 7 days a week from 6AM - 6PM. Motorists are encouraged to slow down, use caution, and be aware of construction personnel in the work zone and equipment that will be entering/exiting the roadway.  Estimated project completion date is November 2019.

[Rogers Group, Inc./Hussein/CNT140]

FRANKLIN COUNTY TDOT Bridge Maintenance on SR-15 (DAVID CROCKETT HWY.) in both directions from LM 13.74 to LM 13.74: Region 2 bridge maintenance will be repairing the bridge rail at the bridge on SR-15 over Dry Creek at LM 13.74. The work will take place on Tuesday, 11/12/2019 from 9 AM till 3 PM. One lane will be closed with traffic control in place.

FRANKLIN COUNTY TDOT Bridge Maintenance on SR-16 (ROWE GAP RD.) in both directions from LM 16.86 to LM 16.86: Region 2 bridge maintenance will be repairing the bridge rail at the bridge on SR-16 at LM 16.86. The work will take place on Wednesday, 11/13/2019 from 9 AM till 3 PM. One lane will be closed with traffic control in place.

FRANKLIN COUNTY Utility Work on SR-130 (OLD TULLAHOMA RD.) northbound from LM 12.87 to LM 13.19: A single lane closure will occur along Phillip Fulmer Parkway between North High St. and Old Estill Springs Rd. Motorists should reduce speed and be aware of mobile work zone as crews transition along the route. Work hours will be between 9 am - 3 pm with an estimated completion date of 11/13/19.

FRANKLIN COUNTY SR-16 (US-41A) Resurfacing from the Coffee County line (LM 0.0) to north of UTSI Road (LM 4.4): The contractor will finish the paving process and begin working on installation of thermo pavement marking and guardrail installation. Work will take place Mondays thru Saturdays from 7AM - 6PM. The road will be at times reduced to one lane in each direction, while keeping one travel lane open at all times in both directions. Motorists are encouraged to slow down, use caution, and be aware of construction personnel in the work zone and equipment that will be entering/exiting the roadway.  Estimated project completion date is November 2019.

[Tinsley Asphalt, LLC /Hussein/CNT254]

GRUNDY COUNTY I-24 (MM 127) Repair of the SR-50 bridge over I-24: This project is substantially complete. During this reporting period, the contractor will be working on punch list items and de-mobilization. There will be no lane closures at this time and all travel lanes open. Motorists are encouraged to use caution and be alert to construction personnel and equipment.  Estimated project completion date is November 2019.

[Jamison Construction/Hussein/CNT256]

GRUNDY COUNTY Utility Work on SR-108 (HWY. 108) in both directions from LM 4.3 to LM 5.8: Intermittent lane closures will occur as crews transition the work zone between Fish Branch Rd. and Mt Olive Rd. Signage and flaggers will be present. Motorists should use caution. Work hours will be between 9 am - 3 pm with an estimated completion date of 11/15/19.

GRUNDY COUNTY Utility Work on SR-56 (US-41) in both directions from LM 4.7 to LM 5.08: Intermittent lane closures will occur as crews transition the work zone between 3rd St. and Oak St. Motorists should use caution as flaggers and signage will be present between 9 am and 3 pm, estimated completion date is 11/15/19.

MARION COUNTY SR-2 (US-64, US-72, US-41) Emergency slope stabilization between LM 25.20 and LM 26.40: Work continues on this project. The contractor will continue to maintain one lane open to traffic with the restrictions of all wide loads. At this time, traffic signals are installed and will remain in place until the project is complete. Motorists are encouraged to use caution and be alert to construction personnel and equipment. RESTRICTIONS: Restriction of all wide loads will remain in place until project is complete.

[Dement Construction Company, LLC/Hussein/CNT229]

WARREN COUNTY SR-288 Construction of a concrete bulb-tee beam bridge over Collins River (LM 4.97), including grading, drainage and paving: The bridge is currently reduced to one 10.5-foot lane to allow the contractor to construct the new bridge. While the bridge is down to one lane, traffic will be maintained and controlled by a temporary signal. Motorists should expect periodic delays and use caution in the work zone. RESTRICTIONS: 10.5 foot lane. Estimated project completion date is December 2019.

[Palmertree Construction Company, LLC/Parnham/CNQ270]

 

DISTRICT 29

BRADLEY COUNTY TDOT Bridge Maintenance on SR-60 (APD-40) both directions from LM 11.29 to LM 12.63: Region 2 bridge maintenance will be repairing the approach joints on two bridges on SR-60 at LM 11.29 and LM 12.63, over SR-40 and over Spring Place Road. The work will take place on Tuesday, 11/12/2019 through Wednesday, 11/13/19, from 9 AM till 3 PM. One lane will be closed with traffic control in place.

BRADLEY COUNTY Utility Work on SR-2 (N. LEE HWY.) in both directions at LM 14.91: A single northbound lane closure will occur between Anatole Ln NW and 56th St NW with signage and cones. Motorists should reduce speed, and use caution through work zone. Work will take place between 9 AM and 3 PM from 11/07/19 to 11/13/19.

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 1 traffic shifts have been implemented. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursdays night between 9 PM and 6 AM at the following locations: I-75 NB at state line, I-75 NB MM 2, I-75 SB MM 3, I-75 SB MM 1, I-24 EB MM 185. Additionally, shoulders may be closed at various locations between 9 AM and 3 PM for access to the median and roadside areas. The speed limit has been reduced to 45 MPH throughout the interchange.

[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]

HAMILTON COUNTY US-27 (I-124) Widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring on the west side of southbound US-27. Motorists should be alert for construction vehicles entering and exiting the area along the access ramps for eastbound and westbound M. L. King Boulevard. The speed limit for the access ramp is 35 MPH. In addition, the southbound ramp from W. Main St.to southbound US-27 has been temporarily closed and will remain so until further notice. Detours are posted. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting; the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. RESTRICTIONS: I-124 (US-27)Northbound Exit 1C 4th St Off Ramp: No oversize/over dimensional loads; I-124 (US-27)Southbound Exit 1C 4th St Of Ramp: On oversize/over dimensional loads; I-124 (US-27) Southbound Exit 1A-B Martin Luther King Blvd. Off Ramp: No oversized/over dimensional loads; I-124 (US-27) Southbound On Ramps from Martin Luther King Blvd.: No oversized/over dimensional loads

[Dement Construction Company, LLC/Micka/CNP230]

HAMILTON COUNTY Utility Work on SR-153 (STATE HWY. 153) in both directions from LM 8 to LM 12.4: Intermittent lane closures will occur as crews transition from near Boy Scout Rd to Dupont Pkwy for overhead utility work. Signage and flaggers will be present. Motorists should reduce speed and be aware of equipment and personnel. Short delays may occur between 9 am - 2 pm, estimated completion date is 11/13/19.

HAMILTON COUNTY Utility Work on SR-319 (DUPONT PKWY.) southbound from LM 1.98 to LM 2.47: A night time southbound lane closure will take place along Dupont Parkway and CB Robinson Bridge. Arrow boards, signage and barrels will be present. Motorists should reduce speed and use caution through the area. Work will occur between 10:00 pm and 4:30 am from 11/11/19 through 11/24/19.

HAMILTON COUNTY Utility Work on SR-8 (CHEROKEE BLVD.) in both directions from LM 10.4 to LM 10.6: Single lane closures of north and south bound lanes will occur between Minor St. and Spring St. Arrow boards, barrels and signage will be present. Motorists should seek alternate route for West Manning St/Harper St. Work will take place between 9 am and 2 pm with an estimated completion date of 11/13/19.

HAMILTON COUNTY SR-111 Repair of bridge over SR-29 (US-27): During this report period, the contractor will have one lane closed in each direction of SR-111 while performing bridge repairs. The contractor will also be closing one lane in each direction on SR-29 as it passes under SR-111. One lane in each direction shall remain open at all times. The Tennessee Highway Patrol will be present to assist with traffic control.  Estimated project completion date is November 2019.

[Mid-State Construction Company, Inc./Osbonlighter/CNT096]

HAMILTON COUNTY SR-153 Resurfacing from north of Shallowford Road (LM 2.6) to north of SR-58 (LM 4.8), including bridge deck repair: Construction operations will continue Sunday through Thursday during this reporting period. All work will happen between 8 PM and 6 AM and could involve double lane closures in either the NB or SB direction. At least one lane will remain open in each direction during the construction activity.  Estimated project completion date is November 2019.

[Wright Brothers Construction Company, Inc./Micka/CNT087]

MCMINN COUNTY SR-30, Grading, drainage and paving on SR-30 from Jackson Street to east of Knight Road in Athens: Traffic along SR-30 is in its phase two configuration with all traffic on the former eastbound side, providing one lane in each direction plus turning lanes at critical intersections and businesses. The intersection of SR-39/SR-30 has changed to a different configuration. The traveling public should be alert.  Estimated project completion date is April 2020.

[Talley Construction Company, Inc./Micka/CNR078]

MCMINN COUNTY SR-39 Resurfacing from South Jackson Street (LM 9.4) to east of Old Athens Englewood Road (LM 12.3): During this reporting period the contractor will have intermittent lane closures on SR-39 in both directions from LM 9.4 to LM 12.3 between the hours of 8 AM and 4 PM for the installation of permanent pavement markings. Motorists are advised to use caution and reduce speed in the work zone. Estimated project completion date is November 2019.

[Rogers Group, Inc./Wagner/CNT147]

MEIGS COUNTY SR-58 Repair of bridge over Hiwassee River (LM 5.22): During this report period, the contractor will have the roadway reduced to one lane controlled by temporary traffic signals. Additional flaggers will be on site as needed. Estimated project completion date is December 2019.

[Mid-State Construction Company, Inc./Osbonlighter/CNT103]

POLK COUNTY SR-40 (US-64) Repair of bridges over North Potato Creek (LM 26.93): During this reporting period, the contractor will be working on bridge rail repairs on the eastbound bridge and expansion joint repairs on the westbound bridge. Traffic on US-64 will be reduced to one lane in each direction for the duration of this work. Motorists are advised to reduce speed and use caution in the work zone. RESTRICTIONS: No loads wider than 12 ft. are allowed at LM 26.93 eastbound and westbound. Estimated project completion date is April 2020.

[Jones Bros. Contractors, LLC/Wagner/CNT062]

RHEA COUNTY TDOT Slope Stabilization on SR-68 (WASSOM MEMORIAL HIGHWAY) in both directions at LM 5.5:   The roadway is reduced to one lane and signalized 24/7 due to a roadway settlement. The slope repair contractor has begun work on permanent repairs.

[TDOT Maintenance/Maintenance/MAINT]

RHEA COUNTY SR-29 (US-27) Resurfacing from north of SR-60 (4.9) to Landes Way (6.5) including bridge repair: There will be night time lane closures supporting paving operations along SR-29. Work will take place Sunday through Thursday (7 PM to 6 AM) during this reporting period. Estimated project completion date is November 2019.

[Rogers Group, Inc./Micka/CNT915]

RHEA COUNTY SR-30 Grading, drainage and paving from west of New Union Road/White Oak Road (LM 12.6) to Sky Drive (LM 12.9): During this report period, the contractor will be performing grading and drainage operations along SR-30 and New Union Rd. During the initial phase traffic will be maintained on SR-30, White Oak Dr. and New Union Rd. in its current pattern. Flaggers will be on-site to assist with heavy equipment entering & exiting existing roadways.  Estimated project completion date is December 2020.

[Twin K Construction/Osbonlighter/CNT073]

REGION WIDE

REGION 2 TDOT Maintenance drainage work: There will be possible short-term lane and shoulder closures at various locations in Region 2 in order to clean rock and debris from ditches on an as-needed basis. One lane will be maintained at all times.

[TDOT Operations/Maintenance/R2MAINT]

REGION 2 TDOT Maintenance pothole repair and pavement patching: There will be possible short-term emergency lane closures at various locations in Region 2 in order to repair potholes and patch pavement on an as-needed basis. Depending on location and severity these repairs may be done during the day or at night. In addition to performing the work, regional Operations crews will also provide traffic control.

[TDOT Operations/Maintenance/R2MAINT]

REGION 2 Preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short term shoulder and/or lane closures in order to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. Work hours are 9 AM to 3:30 PM. At least one travel lane will remain open to traffic at all times. Flaggers will assist with traffic control as needed. Estimated project completion date is February 2020.

[NABCO Electric Company, Inc./Osbonlighter/CNQ287]

REGION 2 On-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor may have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly from 7 PM to 6 AM Sundays through Thursdays and daily on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed.  Estimated project completion date is June 2020.

[Cumberland Guardrail, Inc./Parnham/CNT114]

REGION 2 On-call cable barrier repair on various interstate and state routes: The contractor may have short term shoulder closures in order to perform cable rail repair. Both travel lanes will remain open to traffic at all times on the interstate during any work that is performed. Estimated project completion date is December 2019.

[R.D. Construction, LLC/Parnham/CNS282]

REGION 2 Sweeping and drain cleaning on various interstate and state routes: There will be a sweeping activity (Sunday through Thursday, 8 PM to 6 AM) on regional interstates and selected state routes. This will be supported by a mobile lane closure operation. Estimated project completion date is February 2020.

[Blevins Enterprises, Inc./Micka/CNS320]

REGION 2 Crack sealing at various locations on various State Routes: The contractor will continue the crack sealing process on various state routes in the following Counties: Bledsoe, Franklin, Grundy, Hamilton, Polk, Sequatchie, Van Buren, and Warren. The contractor will be working 7 days a week from 6AM – 7PM. The progress work will be supported by mobile lane closure operations as crews transition the work zones along state routes for sealant work. Signage and flaggers will be present during this work. Motorists are encouraged to use caution and be alert to construction personnel and equipment. In the event of any inclement weather the contractor will be idle. Work will continue in Hamilton County, SR-58 LM17.27-LM25.98, followed by Polk County, SR-315 LM0.26-LM7.16  Estimated project completion date is December 2019.

[Scodeller Construction, Inc./Hussein/CNT921]

 

RESTRICTIONS

FENTRESS AND OVERTON COUNTY - CNT154: Loads wider than 10' should seek alternate route.

OVERTON COUNTY - CNT184: Loads wider than 14' should seek alternate route.

OVERTON COUNTY - CNT243: No loads wider than 10 feet.

MARION COUNTY - CNT229: Restriction of all Wide Loads will remain in place until project is complete.

WARREN COUNTY - CNQ270: 10.5 foot lane.

HAMILTON COUNTY - CNP230: I-124 (US-27)Northbound Exit 1C 4th St Off Ramp: No oversize/over dimensional loads; I-124 (US-27)Southbound Exit 1C 4th St Of Ramp: On oversize/over dimensional loads; I-124 (US-27) Southbound Exit 1A-B Martin Luther King Blvd. Off Ramp: No oversized/over dimensional loads; I-124 (US-27) Southbound On Ramps from Martin Luther King Blvd.: No oversized/over dimensional loads.

POLK COUNTY - CNT062: No loads wider than 12 ft. are allowed at LM 26.93 eastbound and westbound.

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.

Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. All times are local.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or Chattanooga area alerts @Chattanooga511 or any of TDOT's other Twitter pages. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel.

In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don't want to lose another member of our TDOT family. We're asking you to WORK WITH US. To learn more, go to the website at https://www.tn.gov/tdot/work-with-us/.

###