Quality Control

Quality Control (QC) refers to the daily processes, practices, and checks implemented to control the quality of the project development by checking the accuracy of design, plans, drawings, documents, analyses, and quantities as they are being developed. QC is expected to be completed at each Milestone deliverable by each discipline in the Preconstruction Division. It is tied to the Project Delivery Network (PDN) as indicated in Section 3.0 of the Quality Manual.

Note: Email TDOT.EPSDesignQuality@tn.gov if you find anything confusing or wrong or something that should be added into any of the Quality Checklist and the HQ Design Quality team will work with you to resolve your issue.

Quality Control Documents

  Revised:  
QC Cover Sheet Form 07/31/2025  
Adobe PDF Quick Guide 04/30/2025  
PlanGrid Quick Guide 04/30/2025  

Quality Control Checklist

     
1AT1 07/31/2025  
       
1EN1   07/31/2025  
1EN2   07/31/2025  
2EN1   07/31/2025  
2EN2   07/31/2025  
2EN3   07/31/2025  
2EN4   07/31/2025  
3EN1   07/31/2025  
3EN2   07/31/2025  
4EN1   07/31/2025  
     
1SY1 07/31/2025  
  Revised:  
1GT2 07/31/2025  
2GT1 07/31/2025  
2GT2 07/31/2025  
4GT1 07/31/2025  
  Revised:  
2PV1 07/31/2025  
  Revised:  
1PM1 07/31/2025  
1PM2 07/31/2025  
1PM3 07/31/2025  
1PM4 07/31/2025  
1PM5 07/31/2025  
2PM1 3PM1 4PM1 07/31/2025  
2PM2 07/31/2025  
2PM3 07/31/2025  
2PM4 07/31/2025  
2PM5 07/31/2025  
3PM2 07/31/2025  
4PM2 07/31/2025  
  Revised:   
2RW1 07/31/2025  
2RW2 07/31/2025  
3RW1 07/31/2025  
3RW2 07/31/2025  
  Revised:  
1RD2 07/31/2025  
2RD1 07/31/2025  
3RD1 07/31/2025  
4RD1 07/31/2025  
  Revised:  
1ST2 07/31/2025  
2ST1 07/31/2025  
2ST2 07/31/2025  
3ST1 07/31/2025  
4ST1 07/31/2025  
  Revised:  
1TD1 (Coming Soon)    
1TD2 (Coming Soon)    
2TD1 07/31/2025  
3TD1 07/31/2025  
4TD1 07/31/2025  
  Revised:  
1UT2 07/31/2025  
2UT1 07/31/2025  
3UT1 07/31/2025  
3UT2 07/31/2025  

This Page Last Updated: July 31, 2025 at 1:06 PM