CARROLL COUNTY, SR-22A: Bridge repair in Huntingdon over Brier Creek at LM 0.34 and over CSX Railroad at LM 3.10.

Restrictions: Monday, March 9, 2020: SR 22A will be reduced to one lane traffic with a traffic signal system.

 

CARROLL COUNTY, SR 1 (US 70): The resurfacing on US 70 (SR 1) from SR 22 at Court Square

(LM 19.68) to Rosser Circle (LM 22.94) cause temporary lane closures throughout the project.

 

DYER COUNTY, I-155 and US 412 interchange (Region 4 Concrete Repair):

Wednesday, June 17 through Wednesday, June 24, 6:00 a.m.-8:00 p.m.: There will be full and partial closures for concrete pavement repairs at the interchange of I-155 and US 412 in Dyer County.  Work will be taking place on the westbound I-155 off ramp to US 412 eastbound.  A Detour will be posted.

 

LOOK AHEAD:

Wednesday, June 24 through Wednesday, July 1, 6:00 a.m.-8:00 p.m.: There will be full and partial closures for concrete pavement repairs at the interchange of I-155 and US 412 in Dyer County.  Work will be taking place on the westbound I-155 off ramp to US 412 eastbound.  A Detour will be posted.

 

DYER COUNTY, SR-3 (US-51):  The repair of bridges on US 51 (SR 3) over SR 211 (LM 11.99) in Dyersburg will cause temporary lane closures throughout the project.

 

DYER COUNTY, SR-20 (US-412): The resurfacing on SR 20 from US 51 (SR 3) to the Crockett County Line will cause temporary lane closures throughout the project.

 

HENDERSON COUNTY (New Lexington By-Pass): The grading, drainage, construction of bridges and retaining walls, signals and paving on US 412 (SR 459) from US 412 (SR 20) west of Lexington to near SR 22 south of Lexington.  Motorists should watch for trucks entering and exiting the roadway.

 

HENRY COUNTY, SR-54: The grading, drainage, construction of bridges, retaining wall and paving on SR 54 from near Rison Street to near Smith Road. Motorists should watch for trucks entering and exiting the roadway. *Speed limit has been reduced to 35MPH.

Restrictions: Monday, November 25, 2019: Bridge work on SR 54 at LM 12.02 (Bridge nearest Guthrie) is causing a 10’ lane restriction. *Traffic has been shifted to Phase 3 of traffic control.

 

 

OBION COUNTY, Future I-69 (Phase 2): Grading, drainage, construction of eight bridges on future I-69 from south of US 51 (SR 3) to south of US 45W (SR 5) will cause possible lane closures throughout the project. *Speed limit is reduced to 45 MPH through the US 51 (SR 3) portion of the project. The southbound traffic has been switched to the northbound side on SR 3 throughout the work zone, for phase 2 construction.

Restrictions: Wednesday, November 6, 2019: SR 3 will have traffic in the outside lanes in both directions. Inside lanes will be closed for construction. Traffic is reduced to one lane in each direction with an 11’ 6” lane restriction.

 

OBION COUNTY, Future I-69 (Phase 3): Grading, drainage, construction of bridges and paving on future I-69 from west of SR 21 to US 51 (SR 3) will cause possible lane closures throughout the project.

Monday, July 29, 2019: SR 21 North from Clifford Rives Road to Lindenwood Road. The closure is expected for approximately 1 year to allow the construction of the overhead Bridge on the new portion of SR 21 along with the Road & Drainage of the I-69 mainline. Northbound traffic will detour from SR 21 East onto Clifford Rives Road, then North on Bethlehem Road, West onto Lindenwood Road before proceeding North on SR 21. Southbound traffic will be in reverse order. Detour routes are posted.

 

OBION COUNTY, SR-43 (US 45E): Repair of the bridges (right & left) on SR 43 over overflow will cause possible lane closures throughout the project.

Restrictions: Beginning on Friday, January 24, 2020: SR 43 traffic will be reduced to one lane in each direction at the bridges over overflow with a 12’ lane restriction and a 5’ 6” shoulder restriction.

 

WEAKLEY COUNTY, SR-89: The resurfacing on SR 89 from SR 54 to north of SR 190 will cause temporary lane closures throughout the project.

WEAKLEY COUNTY, SR-22 (US 45E): The repair of the ramp bridge on US 45E (SR 22) over SR 431 (LM 19.09) will cause the ramp to be closed. A detour to SR 431 is provided.

District 48 - West TN – Middle/Southern

HAYWOOD COUNTY, SR-19 (Brownsville Bypass): The construction of an I-Beam bridge along with grading, drainage, and paving may cause temporary lane closures on SR 19 (Brownsville Bypass) from east of SR 87 LM 11.12 to west of Windrow Rd. LM 14.73. One lane will remain. Motorists should watch for trucks entering and exiting the roadway. Speed limit is reduced to 45 MPH within the project limits. On February 17, 2019 Shaw Chapel Rd was closed, and a detour put in place.

 

HENDERSON COUNTY, SR-20: The resurfacing with hot in-place recycling on US 412 (SR 20) from Crucifer Road (LM 4.23) to near Sea Horse Drive (LM 10.99) will cause temporary lane closures daily.

 

HENDERSON COUNTY, SR-20: The resurfacing with hot in-place recycling on US 412 (SR 20) from east of SR 22 (LM 12.85) to near the Chesterfield By-Pass (LM 20.03), including bridge expansion joint repair and thin epoxy overlay will cause temporary lane closures daily.

MADISON COUNTY, I-40: Resurfacing from the Madison/Haywood County line to just west of Lower Brownsville Rd.

Wednesday, June 17 through Wednesday, June 24, 6:00 a.m.- 10:00 p.m.: There will be daytime temporary inside and outside lane closures on I-40 eastbound from LM 0.00 (MM 67.1) to LM 7.30 (MM 74.4) for paving operations.

 

LOOK AHEAD:

Wednesday, June 24 through Wednesday, July 1, 6:00 a.m.- 10:00 p.m.: There will be daytime temporary inside and outside lane closures on I-40 eastbound from LM 0.00 (MM 67.1) to LM 7.30 (MM 74.4) for paving operations.

 

MADISON COUNTY, SR-186 (US 45 Bypass) and I-40: Interchange improvements on SR 186 (US 45) north and southbound from the I-40 ramps to Old Hickory Blvd for paving and construction of retaining walls. Widening of I-40 from just east of Exit 79 to just east of Exit 82.

Thursday, June 18 through Saturday, June 20, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities.

Monday, June 22 through Wednesday, June 24, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities.

 

LOOK AHEAD:

Thursday, June 25 through Saturday, June 27, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities.

Monday, June 29 through Wednesday, July 1, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities.

Friday, July 10, 8:00 p.m. through Monday, July 13, 6:00 a.m.: Close and detour Hwy 45 (Highland Avenue) north and south bound from Vann Drive to Carriage House to allow for phase 2 beam installation at Bridge 4.

 

MADISON COUNTY, SR-1: The repair of a bridge on SR 1 near Spring Creek, TN (LM 28.99) along with grading, drainage, and paving will cause temporary lane closures.

Restrictions: On April 13, 2020 there was an 11’ width restriction and a temporary signal put in place. Motorists should watch for crews and equipment in the roadways.

 

MADISON COUNTY, SR-198:  The construction of a concrete box bridge on SR 198 over Bear Creek (LM 8.65) along with grading, drainage, and paving will cause temporary lane closures.

Restrictions: On April 29, 2019 there was an 11’ width restriction and a temporary signal put in place. Motorists should watch for crews and equipment in the roadways.

 

MCNAIRY, SR-15 (US 64):  The resurfacing with hot in-place recycling on SR 15 (US 64) from the Selmer city limits (LM 14.39) to near North SR 224 (LM 22.79, including bridge repair will cause intermittent lane closures daily.

 

TDOT District 48 MAINTENANCE:

Wednesday, June 17 through Wednesday, June 24, 9:00 a.m.-3:00 p.m.: There will be possible lane closures at various locations in Region IV in order to repair pavement on an as needed basis.

 

TDOT District 47 and 48 On-Call Guardrail/Concrete Barrier Rail Repair:

Wednesday, June 17 through Wednesday, June 24: There are no scheduled closures.

 

District 49 - West TN – Southwest

FAYETTE COUNTY, I-40: Resurfacing of I-40 from MM 35.0 to MM 43.0; Bridge Repair on I-40E over Wilder Creek at MM 34.5.
Wednesday, June 17 through Tuesday, June 23, 7:00 p.m.-9:00 a.m.: I-40 will have intermittent lane closures east and westbound from MM 35.0 to MM 43.0 for resurfacing activities. Speed limit will be reduced to 60 MPH during active closures. WEATHER PERMITTING.

FAYETTE COUNTY, SR-196: The repair of bridge over Shaw Creek will cause a lane closure with temporary traffic signal near MM 7.0.

LAUDERDALE COUNTY, SR-371: The repair of bridge over Cane Creek will cause a lane closure with temporary traffic signal near Pipkin Rd.

SHELBY COUNTY, I-40: The concrete repair using hot applied fiber reinforced polymer patching material on I-40 from MM 2.2 to MM 5.0.
Wednesday, June 17 through Tuesday, June 23, 8:00 p.m.-6:00 a.m.: There will be intermittent lane closures on I-40 east and westbound from Levee Road to Hollywood Street to perform full and partial depth concrete pavement work. WEATHER PERMITTING.

SHELBY COUNTY, I-40: Mississippi River Bridge lighting repair
Monday, June 22 and Tuesday, June 23, 7:00 p.m.-6:00a.m.: INTERMITTENT lane closures on I-40 east and westbound at MM 0.00 on the Hernando Desoto Bridge to allow for bridge lighting repairs. Weather Permitting.

 

LOOK AHEAD:

Wednesday, June 24, 7:00 p.m.-6:00a.m.: INTERMITTENT lane closures on I-40 east and westbound at MM 0.00 on the Hernando Desoto Bridge to allow for bridge lighting repairs. Weather Permitting

 

SHELBY COUNTY, I-240: ITS maintenance on I-240 at Person Ave
Thursday, June 18 and Friday, June 19, 9:00 a.m.-3:00 p.m.: The outside lane on I-240 from MM 27.8 to 27.4 will be closed to allow for repair to ITS equipment. WEATHER PERMITTING.

SHELBY COUNTY, SR-3: Resurfacing on SR 3 (Union Ave) from Bellevue Blvd to BB King Blvd.
Wednesday, June 17 through Tuesday, June 23, 6:00 p.m.-6:00 a.m.: There will be intermittent lane closures on SR 3 east and westbound between Bellevue Blvd and B.B. King Blvd for the construction of ADA ramps and asphalt paving operations. One lane in each direction will remain open. Weather Permitting.

LOOK AHEAD
Wednesday, June 24 through Tuesday, June 30, 6:00 p.m.-6:00 a.m.
: There will be intermittent lane closures on SR 3 east and westbound between Bellevue Blvd and B.B. King Blvd for the construction of ADA ramps and asphalt paving operations. One lane in each direction will remain open. Weather Permitting.
Monday, July 6 and Tuesday, July 7, 6:00 p.m.-6:00 a.m.
: There will be full ramp closures on I-240 north and southbound at Exit 30 (Union Ave - On and off Ramps) for the construction of ADA ramps. Ramps to be reopened by 6am each day. Weather Permitting.

 

SHELBY COUNTY, SR-14: Resurfacing on SR 14 from the Mississippi State Line to SR-175
Thursday, June 18 through Wednesday, June 24, 5:30 a.m.-7:30 p.m.: There will be temporary lane closures on SR-14 (Third Street) north and southbound for resurfacing and curb ramp activities. One lane will remain open in each direction.

SHELBY COUNTY, SR-14: The grading, drainage, construction of concrete Bulb-Tee and I-beam bridges, signals and paving on SR 14 from east of Old Covington Pike to SR 385 will cause possible lane closures throughout the project. *Speed limit has been reduced to 45 MPH.

SHELBY COUNTY, SR-14: Construction on SR 14 for a widening project from SR 385 to east of Kerrville Rosemark Rd. There will be possible temporary lane closures throughout the project. *Speed limit has been reduced to45 MPH.

TIPTON COUNTY, SR-3 (US-51): Resurfacing on SR 3 (US 51) from Winn Avenue to Hope Street
Thursday, June 18 through Wednesday, June 24, 6:00 a.m.-6:00 p.m.: There will be intermittent lane closures on north and southbound SR 3 (US 51) from Winn Avenue to Hope Street for resurfacing. Time contingent on lower ADT and minimal queueing. If traffic starts to increase, 8:00 p.m.-6:00 a.m.) WEATHER PERMITTING.

TDOT District 49 MAINTENANCE:
Thursday, June 18 through Wednesday, June 24, 9:00 a.m.-3:00 p.m.:
There will be possible lane closures on all interstates and state routes in District 49 for routine maintenance activities on an as needed basis.

 

 

TDOT District 49 On-Call Guardrail/Concrete Barrier Rail Repair:
Wednesday, June 17 through Tuesday, June 23, 8:00 p.m.-6:00 a.m.: There will be night time lane closures at various locations on SR 3 (Shelby County), SR-385 (Shelby County), I-40 (Fayette and Shelby Counties), I-269 (Shelby and Fayette Counties), I-55 and I-240. One lane will be CLOSED to repair damaged guardrail. THP will assist with traffic control. Weather Permitting.

Wednesday, June 17 through Tuesday, June 23, 8:00 p.m.-6:00 a.m.: The following ramps will be closed to repair damaged guardrail: Weather Permitting.

  • I-240 westbound EXIT 29 on ramp from Lamar
  • I-240 eastbound EXIT 23 on ramp from southbound Airways Blvd

Thursday, June 18 through Wednesday, June 24, 9:00 a.m.-3:00 p.m.: There will be day time lane closures at various locations in Fayette County on SR 196 to repair damaged guardrail. One lane will be CLOSED in each direction to repair damaged guardrail. Flagmen will be used where necessary. Weather Permitting.

LOOK AHEAD
Wednesday, June 24 through Tuesday, June 30, 8:00 p.m.-6:00 a.m.: 
The following ramps will be closed to repair damaged guardrail: Weather Permitting.

  • I-55 southbound EXIT 2A to Shelby Dr. (SR-175) eastbound
  • I-55 northbound EXIT 12C on ramp from Metal Museum Dr
  • I-240 westbound EXIT 29 on ramp from Lamar
  • I-240 eastbound EXIT 23 on ramp from southbound Airways Blvd
  • SR-57 westbound ramp to Ridgeway Ctr Parkway/Sweetbriar Rd

 

TDOT Region IV On-Call Retrace:
Wednesday, June 17 through Wednesday, June 24:
There will be moving lane closures for the retrace of lines in Shelby County on various State Routes.

NON-TDOT/City of Memphis work
SHELBY COUNTY, I-40: Memphis Cook Convention Center

Monday, October 7, 2019, 6:00 a.m. through Tuesday, June 30, 2020: On October 7, 2019 the exit ramp from I-40 eastbound (Exit 1, Front Street) was fully closed for upgrades to the Memphis Cook Convention Center. The ramp split to Riverside Dr. will remain open. Traffic will be controlled by signage and traffic barrels. Drivers should exercise caution when approaching and traveling through work zones.

 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or for West Tennessee follow https://twitter.com/NicLawrenceTDOT.

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.

In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don’t want to lose another member of our TDOT family. We’re asking you to WORK WITH US. Click on the WORK WITH US logo to learn more.