CHEATHAM COUNTY, Slope Stabilization on US 70 near LM 6.2

·       From now through May 2020, There will be a lane closure on US 70 between LM 6 and 7 (between Shady Grove Lane and Tanglewood Drive) for slope stabilization work. Temporary traffic signals will be used during construction.

 

CHEATHAM COUNTY, Bridge Repair on SR 249 at MM 26

·       From now through July 2020, The roadway will be reduced to one lane, controlled by a temporary signal, for full depth deck repairs.

 

DAVIDSON COUNTY, Interstate 440 Reconstruction

·       Nightly, 9PM-5AM, There will be intermittent ramp closures at Nolensville Pike, Murphy Road, West End Avenue, Hillsboro Pike, and I-65 for phase 2 ramp construction. Detours will be in place.

·       Nightly, 9PM-5AM, There will be a right lane closure on SR-1; West End Ave northbound between Elmington Ave and I-440 for concrete flatwork and detour removals. There will be a right shoulder closure on EB I-440 from Nolensville Pike to I-24, I-24 On and Off Ramps, and I-40 On and Off Ramps for roadway lighting. There will also be rolling roadblocks as needed for sign installation.

·       From now through August 2020, I-440 will be restricted to two travel lanes in each direction from 5AM-9PM and one travel lane in each direction from 9PM-5AM.

·       Friday, April 24 at 9PM through Monday, April 27 at 5AM, There will be a ramp closure from I-440 eastbound to Murphy Road for concrete work.

 

DAVIDSON COUNTY, I-24 Interchange Improvements at Hickory Hollow

·       From now through August 2020 – The entrance ramp to I-24 westbound from Hickory Hollow Parkway (MM 60) will be closed for ramp reconstruction.

·       Tuesday, April 28, 6AM-6PM (Wednesday, April 27 will be the alternate day in case of inclement weather), Hickory Hollow Parkway will be closed in both directions at the bridge for concrete work.

 

DAVIDSON COUNTY, Construction of Pedestrian Facilities on U.S. 70S (SR 1) from SR 251 (Old Hickory Boulevard) (LM 7.85) to Erin Lane (LM 8.30)

·       Daily, 9AM-3PM, There will be a lane closure for construction work.

 

DAVIDSON COUNTY, Widening SR 112  (Clarksville Highway) from SR 155 to SR 12

·       Daily, 9AM-3PM, There will be lane closures for clearing/grubbing and construction activities.

 

DAVIDSON AND RUTHERFORD COUNTY, I-24 SMART Corridor

·       Nightly, 8PM-5AM, There will be intermittent lane closures between MM 55-80 for barrier rail relocation.

 

GILES AND MARSHALL COUNTY, Resurfacing on I-65 from US 64 to US 31A (with bridge repairs)

·       Nightly, 8PM-5AM, There will be intermittent lane closures for construction activities between MM 13-22.

 

MONTGOMERY COUNTY, Sidewalk Construction on SR 13

·       Nightly, 10PM-5AM, There will be a lane closure for construction work.

 

MAURY COUNTY, Widening of Duplex Road from US 31 to Secluded Lane

·       Daily, 9AM-3:30PM, There will be temporary lane closures on SR 247 for road widening.

 

ROBERTSON COUNTY, I-24 Resurfacing in Robertson County

·       Starting Sunday, April 26 and continuing nightly, 9PM-5AM There will be lane closures for resurfacing operations (MM 17-25).

 

RUTHERFORD COUNTY, The construction of a sidewalk on SR 10 from Dejarnette Lane to Fairfax Drive

·       Daily, 8AM-3:30PM, There will be a right lane closure NB to excavate for sidewalk. One to two lanes will remain open at all times.

 

SMITH COUNTY, The emergency slope stabilization on U.S. 70 (S.R. 24) near L.M. 12.95

·       From now through July 2020, U.S. 70 (SR 24) is reduced to one 11' lane. Temporary traffic signal in place for traffic control.

 

STEWART COUNTY, SR 461 Resurfacing from SR 76 (LM 0.00) to the Woodlands Trace National Scenic Byway (LM 3.00)

·       Daily, 6AM-6:30PM, There will be a temporary lane closure on SR 461 to install guardrail at multiple locations.

·       Daily, 8AM-3PM (Intersection Improvements at US 79 and SR 461), There will be temporary lane closures to install guardrail, endwalls, and signal foundations.

 

SUMNER COUNTY, New Interchange at I-65 and SR 109

·       Nightly, 8PM-5AM, I-65 will have intermittent ramp closures on the on and off ramps to SR 109. This is required to profile and seal concrete ramps.

 

WILLIAMSON COUNTY, Construction of Mack Hatcher NW Quadrant

·       Daily, 9AM-3PM, There will be a lane closure on SR 96 between Front Street and Boyd Mill Ave for road widening activities.

 

WILSON COUNTY, I-40 Widening from SR 109 to I-840

·       Daily, 12PM-2PM, There will be rolling roadblocks for blasting operations.

 

WILSON COUNTY, Bridge Repair on SR 26 over Sinking Creek

·       Through May 2020, SR 26 will be down to one 10' lane in each direction on the bridge over Sinking Creek. One lane will be open in each direction.

 

WILSON COUNTY, The repair of the bridges on U.S. 231 (S.R. 10) over Spring Creek (L.M. 19.48).

·       From now through November 2020, US 231 (SR 10) will be down to one 11' lane in each direction for bridge work.

 

 

>>> MAINTENANCE & UTILITIES

 

DAVIDSON COUNTY

·       Thursday, April 23, 9AM-3PM, There will be a lane closure on Hillsboro Road between Abbot Martin and Glen Echo for the construction of a bus lane.

·       Daily, 9AM-3PM, There will be a lane closure on I-40 in both directions between MM 205-199 (between the OHB exit and Charlotte exit) for milling and paving.

 

GILES COUNTY

·       Thursday, April 23, 9AM-1PM, There will be a lane closure on I-65 southbound between MM 8-9 for rock clean up.

 

HUMPRHEYS COUNTY

·       Monday, April 27, 7AM-3:30PM, There will be a lane closure on I-40 at MM 138-139 for pothole patching.

 

SMITH COUNTY

·       Daily, 9AM-3PM, There will be a lane closure on I-40 westbound at MM 262 for survey work.

 

SUMNER COUNTY

·       Thursday, April 23, 8AM-3PM, There will be a lane closure on I-65 southbound between MM 98-100 for bridge deck repair.

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather.

 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

 