TDOT Weekly Construction Report for Middle Tennessee, August 1-7, 2019

Thursday, August 01, 2019 | 04:50pm

DAVIDSON COUNTY, Repair of the bridges on I-24 over US 31 E (SR6) over Woodland Street (LM 14.54) and the Cumberland River (LM 15.23)

·         Friday, August 2 at 9PM through Monday, August 5 at 5AM, I-24 will be closed in both directions between I-40 interchange and I-65 interchange (east loop) for bridge joint repair at the Main Street and Woodland Street bridges. Interstate traffic will be detoured on I-65 around the west side of the downtown loop.

·         The I-24 eastbound on-ramp at Shelby Avenue and the I-24 westbound on-ramp at Spring Street will be open to traffic.

 

DAVIDSON COUNTY, Interstate 440 Reconstruction

·         Daily, 9AM-3PM, There will be a right lane closure on SR 6 (Franklin Pike southbound) at LM 5.5 for bridge work. There will be lane closures on West End Avenue between LM 14.5-15 for electrical work.

·         Daily, 9PM-5AM, There will be lane closures and temporary ramp closures at the I-440 and I-65 interchange Additionally, there will be lane closures between I-40 and I-65 for paving operations and overhead signage. At least one lane will remain open in both directions.

·         From now through August 2020, I-440 will be restricted to two travel lanes in each direction from 5AM-9PM and one travel lane in each direction from 9PM-5AM.

 

 

DAVIDSON COUNTY, Intersection improvements on US 31A at Welshwood Drive (LM 7.24) and resurfacing from Swiss Drive (LM 4.24) at Elysian Fields Rd (LM 7.52)

·         Nightly (excluding Saturday), 8PM-5AM, There will be a nightly lane closure on Nolensville Road in both directions from Swiss Drive to Harding Place for milling operations.

 

DAVIDSON COUNTY, SR 1 Grading, Drainage, Signals, and Paving from Vultee Boulevard to Jupiter Drive

·         Daily, 9AM-3PM, There will be lane closures for paving.

 

DAVIDSON COUNTY, Hillwood Blvd Bridge Replacement

·         Daily, 9AM-3PM, There will be a lane closure as needed from SR 1 to Post Road for bridge replacement work.

 

DAVIDSON COUNTY, Resurfacing on I-24 from near Clay Lick Rd (LM 5) to west of SR 45 Old Hickory Blvd (LM 8.65)

·         Nightly, (excluding Saturday), 8PM-5AM, There will be alternating lane closures for striping and rumble strips between MM 37-40. At least one lane will remain open in each direction.

 

DAVIDSON COUNTY, I-24/Hickory Hollow Interchange Improvements (MM 62) and Safety Improvements at I-24/Old Hickory Blvd (MM 60)

·         Thursday, August 1, 8PM-5AM, There will be temporary closures on the inside I-24 eastbound lanes from Bell Road to Old Hickory Blvd to mobilize equipment. Two lanes will remain open at all times.

 

DAVIDSON  and RUTHERFORD COUNTY, I-24 SMART Corridor

·         Daily, 10AM-12PM, There will be intermittent lane closures on I-24 between MM 55-66 to mobilize equipment.

 

DAVIDSON COUNTY, Resurfacing on SR 12 from  near SR 112 (LM 4.62) to south of Industrial Parkway (LM 6.22)

·         Daily, 9AM-2:30PM, There will be alternating lane closures on SR 12 (Ashland City Highway) for degrassing and prep work between SR 112 and Industrial Parkway.

 

DAVIDSON COUNTY, Resurfacing on SR 100 from Temple Rd (LM 6.00) to Old Hickory Blvd (LM 8.26) and from Old Hickory Blvd (LM 8.26) to Heady Dr (LM 12.08)

·         Nightly, 8PM-6AM and Daily 9AM-3PM, There will a lane closure for curb ramp retrofitting. One lane will remain open.

 

HICKMAN COUNTY, The Bridge replacement on I-40 (MM 152) over SR 230

·         Monday August 5 through Friday, August 9, 7PM-6AM, There will be a temporary lane closure on I-40 in both directions in order to grind and groove the bridge.

 

MACON COUNTY, Resurfacing on SR 10 from south of Ellington Drive (LM 8.88) to KY state line (LM 16.89)

·         Daily, 6AM-6PM, There will be temporary lane closures on SR 10 in both directions for paving activities. One lane will remain open.

 

MACON COUNTY, Safety Improvements on SR 52 from SR 141 (LM 3.06) to Old Highway 52 (LM 3.39)

·         Daily, 6AM-6PM, There will be alternating lanes closures on SR 52 in both directions for paving and pavement marking activities. One lane will remain open.

 

MAURY COUNTY, Geotech Exploration

·         Look Ahead – Thursday, August 8 through Tuesday, August 13, 8PM-5AM, There will be a lane closure on I-65 at SR 99 in order to bore the bridge for geotech exploration.

 

MAURY COUNTY, Intersection Improvements at Port Royal Road

·         Daily, 9AM-3:30PM, Temporary lane closures for the placement of barrier wall on Port Royal Road.

 

MAURY COUNTY, Widening of Beechcroft Rd from Cleburn Rd to McCormick Crossing

·         Daily, 9AM-3:30PM, There will be temporary lane closures on SR 247 at MM 17.12 for widening and utility activities.

 

MAURY COUNTY, SR 396 Signage

·         Daily, 9AM-3:30PM, There will be temporary lane closures on SR 396 (Saturn Parkway) for the construction of overhead signs.

 

MAURY COUNTY, City of Columbia West 7th Multimodal Streetscape

·         Daily, 7AM-5PM, There will be temporary lane closures on SR 99 between MM 16.40-16.80 in the westbound lane to rehab curb, gutter, and sidewalk area.

 

MAURY COUNTY, Widening of Duplex Road from US 31 to Secluded Lane

·         Daily, 9AM-3:30PM, There will be temporary lane closures on SR 247 for road widening.

 

ROBERTSON COUNTY, I-65 Construction of New Interchange at SR 109

·         Nightly, 8PM-5AM, There will be temporary lane closures on I-65 northbound and southbound for barrier rail relocation and paving operations. One lane will remain open in each direction.

 

ROBERTSON and SUMNER COUNTY, S.I.A. Serving Project "Deepdish"

·         Daily, 9AM-3PM, There will be temporary lane closures on SR 52 and US 31W for phase 2 construction activities. One lane will remain open.

 

RUTHERFORD COUNTY, The Resurfacing of I-24 from the Davidson County line to the Rocky Fork Overpass

·         Nightly, 8PM-5AM, There will be alternating lane closures on I-24 in both directions between MM 64-69 for milling and paving.

·         Friday, August 2 at 8PM through Monday, August 5 at 5AM, The I-24 westbound exit ramp to Waldron Road will be closed for concrete work. Once this work is complete, crews will move to the I-24 westbound on-ramp at Sam Ridley Parkway.

 

RUTHERFORD COUNTY, The Resurfacing of SR 10 (US 231) from Tiger Hill to North of Rutherford Blvd

·         Nightly, 8PM-5AM, There will be alternating lane closures on SR 10 between MM 8.67-12.08 in both directions for construction activities. One lane will remain open at all times.

 

RUTHERFORD COUNTY, The resurfacing on SR 102 from north of Mercedes Drive to the bridge over Olive Branch

·         Daily, 8:30AM-2:30PM, There will be alternating lane closures on SR 102 for guardrail, milling and paving operations. There will be a combination of lane closures and flagging operations.

 

SMITH COUNTY, The repair of the I-40 WB bridge over Caney Fork River at M.M. 263.1 (L.M. 12.99)

·         Friday, August 2 at 7PM through Monday, August 5 at 5AM, I-40 westbound will be reduced to one lane for bridge repair operations at MM 263. Drivers should expect delays.

 

SMITH COUNTY, Resurfacing on SR 53 from SR 141/SR 264 (LM 11.04) to US 70N (SR 24) (LM 15.66)

·         Nightly, 6PM-5:30AM, There will be temporary lane closures on SR 53 in both directions for paving activities. One lane will remain open.

 

WILLIAMSON COUNTY, Resurfacing on I-65 from near Liberty Pike (LM 13.37) to south of Concord Road (LM 17.50)

·         Nightly (excluding Saturdays) 8PM-5AM, There will be alternating lane closures in both directions on I-65 between MM 67-71 for striping work.

 

WILLIAMSON COUNTY, Grading, drainage, and paving on SR 11 at the intersection of SR 96 in Triune

·         Daily, 8AM-4PM, There will be a lane closure on SR11 northbound and SR 96 westbound (MM 23.40-23.76) for construction activities.

 

WILLIAMSON COUNTY, Resurfacing on I-840 near Campbell Road (LM 26) to west of the bridge over the Harpeth River (LM 33.05)

·         Nightly (excluding Saturday), 8PM-5AM, There will be a nightly lane closure in both directions for milling and paving. One lane will remain open.

·         Friday, August 2 at 8PM through Monday, August 5 at 5AM, There will be a lane closure in both directions from MM 31-39 for bridge repairs.

 

WILSON COUNTY, I-840 Resurfacing from north of the Rutherford County line to east of Stewarts Ferry Pike

·         Nightly (excluding Saturday), 8PM-5AM, There will be alternating lane closures on I-840 (MM 65-71) in both directions for paving operations. One lane will remain open at all times.

 

WILSON COUNTY, Widening on SR 141 from South of Spring Creek to North of Lovers Lane

·         Daily, 6AM-6PM, There will be a temporary lane closure on SR 141 for construction activities. One lane will remain open in each direction.

 

WILSON COUNTY, Bridge Repair on SR 26 over Sinking Creek

·         Through December 2019, SR 26 will be down to one 10' lane in each direction on the bridge over Sinking Creek. One lane will be open in each direction.

 

WILSON COUNTY, Resurfacing from US 70 (SR 24) (LM 18) to the Smith County Line (LM 27.73)

·         Weekdays, 9AM-3:30PM, Weekends, 6:30AM-6:30PM There will be temporary lane closures on SR 24 in both directions for paving activities. One lane will remain open.

 

WILSON COUNTY, Resurfacing SR 141 from East of Stokes Street (LM 10.54) to Sugar Flat Road (LM 14.59)

·         Weekdays, 9AM-3:30PM, Weekends 6:30AM-6:30PM, There will be temporary lane closures on SR 141 in both directions for striping activities. One lane will remain open.

 

WILSON COUNTY, Resurfacing on SR 171 from North of SR 265 (LM 3.9) to Belinda City Parkway (LM 4.56)

·         Nightly, 8PM-6AM, There will be temporary lane closures on SR 171 in both directions for milling and paving activities. One lane will remain open.

 

WILSON COUNTY, The repair of the bridge on I-40 EB over US 70 (SR 26) (LM 16.82)

·         From now through Thursday, August 8, SR 26 will be reduced to one lane under the I-40 bridges.

 

>>> MAINTENANCE & UTILITIES

 

CHEATHAM COUNTY

·         Saturday, August 3, 6:30AM-8:30AM, There will be a lane closure on I-40 westbound at MM 186 for spill containment removal.

 

DAVIDSON COUNTY

·         Sunday, August 11, 6AM-12PM, NES will have rolling roadblocks on I-65 at Garfield bridge, south of Rosa L Parks Blvd, to remove and replace conductor cables.

·         Daily, 9AM-3PM, There will be rolling roadblocks on I-65 northbound between MM 92 and MM 95 for blasting.

·         Monday, August 5, 9AM-3PM, There will be a lane closure on Briley Parkway in both directions from Brick Church ramp to Dickerson Rd ramp for cutting tree from sound wall.

 

WILSON COUNTY

·         Thursday, August 1, 7PM-1AM, There will be a lane closure and rolling roadblocks on I-40 eastbound at MM 222 for median wall cleaning.

 

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather. 

 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.