West Tennessee Weekly Construction August 22-29, 2018

Wednesday, August 22, 2018 | 08:44pm

District 47 - West TN - Northern
CARROLL COUNTY, SR-104:
The grading, drainage, paving and construction of a bridge on SR 104 over Grassy Hollow Creek. Roadway is CLOSED for duration of project.

CARROLL COUNTY, SR-423: The grading, drainage, construction of a concrete I-beam bridge on SR 423 over Clear Creek. Motorists should watch for trucks entering and exiting the roadway.

Restrictions: Monday, February 12, a traffic signal system is being utilized. Traffic is reduced to one lane in with a 10’ lane restriction.

DYER COUNTY, SR-3/US-51: Repair of bridges over South Fork Forked Deer River. Motorists should watch for trucks entering and exiting the roadway in a construction zone. Traffic is reduced to one lane on US 51 (SR 3) in both north and southbound directions, from LM 24.73 to LM 25.00 in Lauderdale County and LM 0.00 to LM 0.40 in Dyer County. SR-3/US-51 northbound traffic is then shifted to the southbound lanes in the crossover areas. *Speed limit is reduced to 45 MPH through the US 51 portion of the project.

Restrictions: There is a 12’ 10” lane restriction.

DYER COUNTY, SR-20 (US-412): Repair of bridges over North Fork Forked Deer River. *Speed limit has been reduced to 55 MPH.

Restrictions: Traffic is reduced to one lane in each direction with a 12’ lane restriction.

DYER COUNTY, SR-20 (US-412): Repair of bridges over Lewis Creek. Motorists should watch for trucks entering and exiting the roadway.

On Monday, May 7, SR 20 was shifted into the westbound direction from LM 2.16 to LM 2.74 for bridge repair. Construction signs and message boards are in use.

Restrictions: Traffic is reduced to one lane in each direction with a 12’ lane restriction.

HENRY COUNTY, SR-54: The grading, drainage, construction of bridges, retaining wall and paving on SR 54 from near Rison Street to near Smith Road. Motorists should watch for trucks entering and exiting the roadway. *Speed limit has been reduced to 35MPH.

HENRY COUNTY, SR-76: A resurfacing project on US 79 (SR 76) from West Antioch Road to near the Tennessee River will cause possible lane closures throughout the project.

LAKE COUNTY, SR-78: Construction of a concrete Bulb-Tee bridge on SR 78 over drainage ditch including grading, drainage, and paving will cause possible lane closures throughout the project.

LAKE COUNTY, SR-21: The construction of a spillway on Reelfoot Lake, including grading, drainage and paving. Temporary lane closures daily for both West/East bound traffic. Construction signs and Flaggers are in use.

OBION COUNTY, Future I-69: Grading, drainage, construction of eight bridges on future I-69 from south of US 51 (SR 3) to south of US 45W (SR 5) will cause possible lane closures throughout the project. *Speed limit is reduced to 45 MPH through the US 51 (SR 3) portion of the project. The inside southbound lane on SR 3 is closed to all traffic for installation of barrier rail.

Restrictions: Tuesday, June 13, 2017 SR 3 has a lane shift in the north and southbound directions. Traffic is reduced to one lane in each direction with an 11’ 6” lane restriction.

OBION COUNTY, SR-5: A resurfacing project on SR 5 from US 51 (SR 3) to the Kentucky State line will cause possible lane closures throughout the project.

OBION COUNTY, SR-21: A resurfacing project on SR 21 from SR 183 to US 51 (SR 3) will cause possible lane closures throughout the project.

OBION COUNTY, SR-184: A resurfacing project on SR 184 from SR 21 to Church Street will cause possible lane closures throughout the project.

TDOT Region IV Random Retracing Contract: A retracing project in Shelby County on various interstate routes will cause possible lane closures for the duration of project.

District 48 - West TN – Middle/Southern

CHESTER/MCNAIRY COUNTIES, SR-22A; A resurfacing project on SR 22A in McNairy County through Chester County to the Henderson County line will cause possible lane closures throughout the project.

CROCKETT COUNTY, SR-76: The grading, drainage, paving and construction of bridges on

SR 76 over Cypress Creek and overflow. On February 7, 2018, a traffic signal system is being utilized.

Restriction: There is an 11’ width restriction in place. Traffic reduced to one lane.

DECATUR COUNTY, SR 69:  Bridge repair over Lick Creek (LM 36.56) will cause possible lane closures throughout the project.

FAYETTE COUNTY, I-40: The grading, drainage, construction of a concrete bulb-tee bridge and paving on I-40 at the SR 196 (Hickory Withe Road) interchange. Motorists should watch for trucks entering and exiting the roadway.

Wednesday, August 15, through Wednesday, August 22: There are no scheduled closures.

HARDEMAN COUNTY, SR-100: Intersection improvements, including the grading, drainage and paving SR 100 at the intersection of SR 138 (LM 11.74) in Toone will cause possible lane closures throughout the project.

HARDIN COUNTY, SR-15 (US-64): A resurfacing project on SR 15 from Main Street to neat Bell Lane will cause possible lane closures throughout the project.

HAYWOOD COUNTY-I-40:  Sunday, August 26, through Thursday, August 30, 7:00 p.m.-6:00 a.m.: There will be temporary inside and outside lane closures on I-40 east and westbound near Koko Rd to the SR 19 (Mercer Rd) ramp for milling and paving operations.

HAYWOOD COUNTY–SR-76: Construction of a concrete bulb tee beam bridge over the Hatchie River – Wednesday, May 3, 2017 SR 76 CLOSED approx. 1 mile south of the I-40/Exit 56 interchange for removal of the truss bridge. *Local traffic will have access up to the bridge. An interstate detour is posted at Exit 56 and Exit 52 (Stanton/KoKo Road).

HENDERSON COUNTY, SR-22: The resurfacing on SR-22 from near Bud Crockett Drive (LM 16.25) to I-40 will have intermittent lane closures daily.

HENDERSON COUNTY, SR-22: The resurfacing on SR-22 from Jane Lane (LM 12.62) to near Bud Crockett Drive (LM 16.25) will have intermittent lane closures daily.

MADISON COUNTY, SR-197: Resurfacing from US 45 (SR 5) (LM 0.00) mile marker 87 to Henderson County Line mile marker 95.to the Chester County Line (LM 10.29)

MADISON COUNTY, I-40: Resurfacing from near US 70 (SR 1) mile marker 87 to Henderson County Line mile marker 95.

MADISON COUNTY, SR-186 (US 45 Bypass) and I-40: Interchange improvements on SR 186 (US 45) north and southbound from the I-40 ramps to Old Hickory Blvd for paving and construction of retaining walls.  Widening of I-40 from just east of Exit 79 to just east of Exit 82.

Saturday, August 25, and Sunday, August 26, 4:00 a.m.-7:00 p.m.: Close and detour I-40 east and westbound onto existing ramps at Exit 80 (Hwy 45 Bypass). Close and detour Hwy 45 Bypass south and northbound at interchange. To allow for demolition of existing pier footings.

 

MADISON COUNTY, SR-5: The resurfacing on US 45 (SR5) from SR43 (LM 23.11) to the Gibson County line (LM 26.32) will have intermittent lane closures daily for resurfacing work.

MCNAIRY COUNTY, SR-15 (US 64): A resurfacing project on US 64 (SR 15) from US 45 (SR 5) to Baker Road will cause possible lane closures throughout the project.

TDOT MAINTENANCE:

Wednesday, August 22, through Wednesday, August 29, 9:00 a.m.-3:00 p.m.: There will be possible lane closures at various locations in Region IV in order to repair pavement on an as needed basis.

Sunday, August 26, through Thursday, August 30, 8:00 p.m.-6:00 a.m.: There will be intermittent lane closure on I-40 both east and westbound from MM 87 to MM 82, for milling and paving operations.  There will also be intermittent ramp closures at Exit 83 and Exit 85.

District 49 - West TN – Southwest

FAYETTE COUNTY, US 70 (US 79, SR-1): A bridge repair project on SR 1 over branch will result in lane closures in both directions daily.

FAYETTE COUNTY, SR-59 over I-40: A bridge repair project on US 70 (SR 79, SR 1) over branch and on SR 59 over I-40.

Wednesday, August 22 until Late Summer: I-40 east and westbound at Exit 35 will have inside and outside shoulder closures *Speed limit on I-40 has been reduced to 60 MPH.

Wednesday, August 22 through Tuesday, August 28, 7:00 p.m.-6:00 a.m.: There will be lane closures on I-40 west and eastbound directions at Exit 35 (SR 59) for median work. One lane will remain open in both directions. *Speed limit is reduced to 50 MPH on I-40 during closure. Weather Permitting.

FAYETTE COUNTY, SR-194: A resurfacing project on SR 194 from SR 57 to Whispering Meadows Drive will cause possible lane closures throughout the project.

SHELBY COUNTY, I-40 – Pothole Repair:

Friday, August 24, 9:00 a.m.-3:00 p.m.: INTERMITTENT lane closures on I-40 eastbound between MM 0.00 (MS River Bridge) to MM 7.00 (Austin Peay Hwy) to allow for pot hole repairs. Weather Permitting.

SHELBY COUNTY, I-40 – Joint Seal  Repair:

Monday, August 27 through Thursday, August 30, 8:00 p.m.-6:00 a.m.: INTERMITTENT lane closures on I-40 east and westbound between MM 19 (Davies Plantation) and MM 27.00 (Fayette County Line) to allow for joint seal repairs. Weather Permitting.

SHELBY COUNTY, I-40 – Light Installation:

Thursday, August 23, 7:00 p.m.–6:00 a.m.: INTERMITTENT lane closures on I-40 eastbound on the Mississippi River Bridge. There will be two (2) lanes CLOSED with one lane open to allow for light installation.

SHELBY COUNTY, I-240 MemFix 4: Replacement of Norfolk Southern, SR 57 east and westbound bridges, and repair of Park Avenue bridge over I-240.

I-240: There are shoulder closures in the westbound direction of I-240 east/west between Quince and Walnut Grove. The lane closures along I-240 east and westbound between Quince and Walnut Grove will stay in place throughout the project.

NIGHTLY CLOSURES are as follows:

Thursday, August 23, 9:00 p.m. until Friday, August 24, 6:00 a.m. – There will be one lane closed on eastbound Poplar Avenue.

FULL CLOSURES are as follows:

·       Friday, August 24, 9:00 p.m. until Monday, August 27, 6:00 a.m.FULL CLOSURE of I-240 east and westbound and Poplar Avenue east and westbound.

·       Friday, September 7, 9:00 p.m. until Monday, September 10, 6:00 a.m.FULL CLOSURE of  I-240 east and westbound and Poplar Avenue east and westbound.

SHELBY COUNTY, SR-1: Construction of a welded steel plate girder bridge on SR 1 over the Loosahatchie River will cause possible lane closures throughout the project.

SHELBY COUNTY, SR-14 (Austin Peay Hwy): Construction on SR 14 for a widening project from

SR 204 (Singleton Parkway) to east of Old Covington Pike. Shoulders are closed north and southbound. There will be possible temporary lane closures throughout the project.

On April 21, 2017, Old Covington Pike East access to/from SR 14 was permanently CLOSED.

*Speed limit has been reduced to 45 MPH.

SHELBY COUNTY, SR-14: The grading, drainage, construction of concrete Bulb-Tee and I-beam bridges, signals and paving on SR 14 from east of Old Covington Pike to SR 385 will cause possible lane closures throughout the project. *Speed limit has been reduced to 45 MPH.

SHELBY COUNTY, SR-14:  A bridge repair at Raleigh-Millington Exit:

Wednesday, August 22, 2018, through Thursday, January, 31, 2019: Ramp D Bridge (Raleigh-Millington Exit) from northbound SR14 to Raleigh-Millington will be closed for repairs until January 2019.  Weather Permitting.

SHELBY COUNTY, SR-57: Resurfacing on SR 57 from near I-240 to Val Verde.

Sunday, August 26, through Thursday, August 30, 7:00 p.m.-6:00 a.m.: There will be INTERMITTENT closures with one lane to remain open on SR 57 east and westbound to allow for resurfacing and safety improvements. Weather Permitting.

SHELBY COUNTY, SR-177: Resurfacing on SR 177 from near Raleigh LaGrange to Woodchase.

Sunday, August 26, through Thursday, August 30, 8:00 p.m.-6:00 a.m.: There will be INTERMITTENT closures with one lane to remain open on SR 177 (Germantown Rd.) north and southbound to allow for resurfacing and safety improvements. Weather Permitting. 

SHELBY COUNTY, SR-385 – Resurfacing: The resurfacing on SR-385 from Ridgeway Road to near Hacks Cross Road will cause lane closures through the project.

Monday, August 27 through Thursday, August 30, 8:00 p.m.-6:00 a.m.: INTERMITTENT lane closures on SR 385 east and westbound from Ridgeway Road (L.M. 1.26) to near Hacks Cross Road (L.M. 6.13) to perform the resurfacing work. One lane will be open in each direction.

SHELBY COUNTY, US-385 – Pothole  Repair:

Monday, August 27, and Tuesday August 28, 9:00 a.m.-3:00 p.m.: INTERMITTENT lane closures on I-240 eastbound between MM 7.00 (Winchester) and MM 12.00 (Byhalia Rd) to allow for pothole repairs. Weather Permitting

TDOT District 49  MAINTENANCE:

Wednesday, August 22, through Wednesday, August 29, 9:00 a.m.-3:00 p.m.: There will be possible lane closures on all state routes and interstates for routine maintenance activities on an as needed basis.

TDOT District 49 On-Call Guardrail/Concrete Barrier Rail Repair:

Wednesday, August 22 through Tuesday, August 28, 8:00 p.m.-6:00 a.m.:  There will be night time lane closures on I-55, I-240, I-40 (Fayette and Shelby Counties), SR 385 (Shelby County), and SR 3 (Shelby and Tipton Counties). One lane will be CLOSED to repair damaged guardrail. THP will assist with traffic control Weather Permitting.

  • I-55 eastbound and westbound, MM 0.0 – MM 12.0, various locations; One lane will be CLOSED.
  • I-240 east and westbound, MM 12.0 – 30.0, various locations; One lane will be CLOSED.
  • Shelby Co., I-40 east and westbound, MM 1.0 – MM 27.0, various locations; One lane will be CLOSED.
  • Fayette Co., I-40 east and westbound, MM 33.0 – 42.8, various locations; One lane will be CLOSED.
  • Shelby Co., SR 3 north and southbound, MM 0.00 –  MM 21.0, various locations; One lane will be CLOSED.
  • Shelby Co., SR 385, east and westbound, MM 0.00 – MM 14.0, various locations; One lane will be CLOSED.
  • Shelby Co. SR 14, north and southbound, MM 7.0 – MM 30.2, various locations; One lane will be CLOSED.
  • Tipton Co., SR 3 north and southbound, MM 0.0 – MM 25.0, various locations; One lane will be CLOSED.

Thursday, August 23, through Wednesday, August 29, 9:00 a.m.-3:00 p.m.: There will be day time lane closures at the following various locations to repair damaged guardrail. If weather prohibits, the repairs will be performed on the next available day. Flagmen will be used where necessary. Weather Permitting.

  • Lauderdale Co., SR 209 east and westbound, MM 0.0 – MM 19.0, various locations; One lane will be CLOSED. Flagmen will be used.
  • Lauderdale Co., SR 19 east and westbound, MM 0.0 – MM 26.0, various locations; One lane will be CLOSED. Flagmen will be used.
  • Lauderdale Co., SR 371 north and southbound, MM 1.4; One lane will be CLOSED. Flagmen will be used.
  • Tipton Co., SR 3 north and southbound, MM 0.0 – MM 25.0, various locations; Shoulder closure ONLY. Flagmen will be used.

TIPTON COUNTY, SR-3 (US 51): A safety project on US 51 (SR 3) at Charles Place

Wednesday, August 22 through Tuesday, August 28: SR 3 northbound will have the left lane CLOSED and southbound will have the right lane CLOSED to complete turn lanes at Charles Place.

TIPTON COUNTY, SR-14: Resurfacing SR 14 from SR 59 to near SR 179 will cause possible lane closures throughout the project.

LOOKAHEAD:

TIPTON COUNTY– SR 178 Culvert Replacement (Maintenance)

Saturday, September 8, 7:00 a.m.–6:00 p.m.: SR 178 north and southbound will be CLOSED to replace culverts between SR 59 and Sturdivant. Traffic is advised to use alternate routes. Weather permitting.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or for West Tennessee follow https://twitter.com/NicLawrenceTDOT.

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.

In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don’t want to lose another member of our TDOT family. We’re asking you to WORK WITH US. Click on the WORK WITH US logo to learn more.