Middle Tennessee Construction Lane Closures, April 12-18, 2018

Thursday, April 12, 2018 | 04:54pm

 

DAVIDSON COUNTY, Resurfacing On I-24 From SR 6 To The I-40 Westbound Ramps & Bridge Rehab On I-24 Over Spring St. & Oldham St.

·        Nightly, 8PM-5AM, There will be alternating lane closures on Spring Street for texture coating of the bridge and replacement of curbs. One lane will remain open.        

·        Nightly, 8PM-5AM, There will alternating lane closures on I-24 in both directions for milling, paving, and cleaning parapets.  One lane will remain open in each direction.

·        Nightly, 8PM-5AM, There will an outside lane closure on I-40 WB (MM211.0), for steel repairs of damaged bolts. One lane will remain open.

·        Look Ahead – Friday, April 20, 8PM through Monday, April 23, 6AM - I-24 will be closed from the I-24/I-40 split to the I-65 split. https://www.tn.gov/tdot/projects/region-3/interstate-24-bridge-rehabilitation.html. The closure scheduled for the weekend of April 13 has been cancelled due to weather.

 

DAVIDSON and WILLIAMSON COUNTY, On-Call Signing

·        Nightly, 8PM-6AM, There will be inside lane closures in both directions on I-65 as needed, to replace and modify the existing HOV signs.  The lane closures will be placed for 2-mile sections at a time.

 

DAVIDSON and RUTHERFORD COUNTY, On-Call Signing

·        Nightly, 8PM-6AM, There will be inside lane closures in both directions on I-24 as needed, to replace and modify the existing HOV signs.  The lane closures will be placed for 2-mile sections at a time.

 

DAVIDSON COUNTY, The Improvement Of The Intersection On SR 1 (US 70S) At McCrory Lane & The CSX Railroad (L.M. 0.99)

·        Daily (excluding weekends), 9AM-3:30PM, There will be alternating lane closures on US 70 for paving, signals, and miscellaneous work.

 

DAVIDSON COUNTY, Grading, Drainage, Signals, & Paving on US 41 From Vultee Blvd. To Jupiter Drive (L.M. 22.50-22.96)

·        Daily, 7AM-3PM (excluding weekends), There will be a lane closure for installation of 8' main gas line. At least one lane will remain open.

 

DAVIDSON COUNTY, ITS Maintenance on SR-155 (Briley Parkway)

·        Nightly, 9PM-6AM, There will be a left lane closure on SR155 westbound at MM 17.3 to remove poles and basins. There will be a shoulder closure on SR155 eastbound at the MM 15B off ramp to Dickerson Pike.

 

DAVIDSON COUNTY, The resurfacing on SR 254 (Old Hickory Blvd.) from SR 106 to Granny White Pike (L.M. 2.77-5.44)

·        Starting Monday, April 16 and continuing daily, 9AM-3PM, There will be a lane closure on Old Hickory Blvd. from Hillsboro Rd. (SR 106) to Granny White Pk. for milling operations.

 

DAVIDSON COUNTY, The repair of the slope located west of the roundabout on Two Rivers Parkway at SR 155, including replacement of storm drainage structures (L.M. 9.89)

·        Through May 2018, The exit lane of Gaylord Drive to the Two Rivers roundabout will be closed. Also, the westbound entrance to Gaylord Drive will be closed to repair the slope and to replace storm drainage structures on Two Rivers Drive.   

·        Daily, 9AM-3PM, There will be alternating lane closures on Two Rivers for  and placing rip rap on slope and removing barrier wall.


DAVIDSON COUNTY, Intersection Improvements on SR 6 (Franklin Road) at SR 255 (Harding Place/Battery Lane)

·        Nightly, 8PM-5AM, There will be lane closures on SR 6 for boring and to install the traffic lights. One lane will remain open in each direction.

 

DAVIDSON and SUMNER COUNTY, ITS Maintenance on SR-386 (Vietnam Veterans Parkway)

·        Nightly, 9PM-6AM, There will be a lane closure on Vietnam Veterans SR 386 from MM 1.5 to MM 2.4 at the beginning of the off ramp to Center Point Rd. to remove poles and bases that are no longer in use.

 

MAURY COUNTY, The construction of a new interchange including a concrete bulb-tee beam bridge and paving with Portland Cement Concrete on SR 166 at US 43 (SR 6) in Mount Pleasant.

·        Daily (excluding weekends), There will be lane closures on Hwy. 31 for asphalt paving and milling operations.

 

MAURY COUNTY, The repair of bridges on S.R.246 over Craters Creek and Mayhorn Branch

·        Tuesday, April 3 and Wednesday April 4, 8AM-3PM, There will be temporary lane closures on SR 246 for shoulder widening - removal, installation of hot-mix for extra width and striping operations.

 

MAURY COUNTY, Construction of a new interchange including a concrete bulb-tee beam bridge and paving on SR-166 at US 43 (SR 6) in Mount Pleasant

·        Daily (excluding weekends), 7AM-3PM, There will be lane closures in both directions on US-43 for blasting operations.

 

ROBERTSON COUNTY, Construction of new interchange on I-65 at SR 109

·        From now through April 2018, The inside lane on I-65 northbound at MM 121 will be closed for removal of existing median wall and construction of new overhead signs. Two lanes will remain open in each direction.

 

RUTHERFORD COUNTY, The resurfacing on I-24 from near  Rocky Fork Road (LM 5.20) to near Baker Road (LM 7.75)

·        LOOK AHEAD, Thursday, April 19-Monday April 23, The ramps will be closed at exit 70 westbound for concrete and asphalt repairs.  There will a double right lane closure on I-24 westbound for bridge repair.                                                                                                                          There will also be a right lane closure on SR 102 (Almaville Rd) in both directions for bridge repairs.

 

RUTHERFORD COUNTY, The resurfacing on SR 1 from the Davidson County line (LM 0.00) to Ken Pilkerton Drive (LM 6.42)

·        Nightly, 8PM-5AM, There will be alternating lane closures on SR 1 for milling, loop wires, casting adjustments and guardrail. One lane will remain open in each direction.

 

RUTHERFORD COUNTY, The resurfacing on SR 266 from I-24 Interchange (LM 0.00) to Threet Industrial Blvd (LM 3.33)

·        Nightly, 8PM-5AM, There will be alternating lane closures on SR 266 for milling operations. One lane will remain open in each direction.

 

RUTHERFORD, WILLIAMSON COUNTY, The on-call cable barrier repair on various Interstate and State Routes

·        Daily, 8AM-4PM, There will be a temporary lane closures on I-840 in both directions between MM 14 and 66 to install cable barrier.

 

RUTHERFORD, WILSON COUNTY, The Resurfacing of I-840 with OGFC from East Fork Stones River Bridge in Rutherford County to just North of the Wilson County line

·        Nightly, 8PM-5AM, There will be ramp closures at exit 65 to replace the deteriorated concrete. Only one ramp will be affected at a time. A detour will be in place.

·        Friday, April 13 at 8PM through Sunday, April 15 at 5AM, There will be a nightly ramp closures on I-840 in both directions at Exit 61 and 65 for ramp repair.

 

SMITH COUNTY, Rockfall Mitigation on SR 25 (L.M. 8.5)

·        Daily, 9AM-2PM, There will be a temporary road closure on SR 25 for blasting operations. This operation should take no more than 30 minutes.

 

WILLIAMSON COUNTY, Grading, Drainage, and Paving Work on SR 6 (Franklin Road) from south of Moores Lane (L.M. 15.93) to Concord Road (18.53)

·        Daily, 9AM-3PM, There will be alternating temporary lane closures and/or intermittent stoppages of traffic (one direction at a time) northbound between Wikle Road and Long Road for placing barrier rail.

·        Daily, 9AM-3PM, There will be temporary lane closures north and south of Moore's Lane for utility work. One lane will remain open in each direction.

 

Maintenance & Utilities

 

DAVIDSON COUNTY

Nightly, 8PM-5AM, As weather permits, there will be two lanes closed on I-24 westbound between Hickory Hollow Pkwy and the Silliman Evans bridge (MM 52-60) for milling and paving work. Two lanes will remain open.

 

Monday, April 16-Friday, April 20, 8PM-5AM, There will be lane closures on I-440 in both directions for removal of snowplowable markers, pothole repair, and milling. At least one lane will remain open.

 

Daily, 9AM-3PM, The ramp from I-65 southbound to Long Hollow Pike (MM 97) will be closed for milling and paving work.

 

Nightly, 8PM-5AM, There will be a lane closures on SR 24 (Lebanon Road) between the Stones River Bridge and the YMCA for paving work. One lane will remain open in each direction.

 

Daily (excluding weekends) 9AM-3PM, There will be alternating lane closures on SR 100 at Pasquo Road for replacing storm drainage and installation of conduit for traffic signals, along with paving work. Traffic control will be utilized. One lane will remain open.

 

HUMPHREYS COUNTY

Thursday, April 12, 7PM-3AM, There will be lane closures on I-40 between MM 136 and 137 for bridge joint repairs.

 

RUTHERFORD COUNTY

Daily, 9AM-3PM, There will be a lane closure on SR 10 in both directions at LM 7.4 for miscellaneous operations.

 

Daily, 9AM-3PM, There will be a lane closure on SR 2 southbound at LM 3.4 for miscellaneous operations.

 

Thursday, April 12, 9PM-6AM, There will be a lane closure of two lanes on I-24 westbound for bridge repair at MM 67 and MM 69.

 

SUMNER COUNTY

Thursday, April 12 through Saturday, April 14, 9AM-3PM, There will be a right lane closure on SR 174 eastbound intersection to SR 386 for installation of a turning lane. One lane will remain open. There will be a right lane closure on SR 386 eastbound for installation of a right-in, right out. The left lane eastbound will also be closed for installation of concrete median in existing lane. The lane closure will alternate between the left and right lanes. Traffic cones will be utilized. One lane will remain open.

 

WILLIAMSON COUNTY

From now through Friday, April 20, SR 46 is closed near Puckett’s in Leipers Fork for emergency road repairs. A detour is in place.

 

Daily, 9AM-3PM, On SR 106 (Lewisburg Pike) at South Margin Street there will be lane closures for island and stop condition installation.

 

Tuesday, April 17 and Wednesday, April 18, 9:30AM-3PM, There will be alternating lane closures in both directions on I-840 at the Peytonsville/Trinity Rd., Arno Rd., McClory's Branch, and McDaniel Rd. bridges for bridge deck survey work and chain drag.  One lane will remain in each direction.

 

WILSON COUNTY

Daily, 9AM-2:30PM, There will be rolling roadblocks on SR 109 between Callis Road and I-40 for rock blasting/excavation for THE VENUE Project.

 

Friday, April 13, 9AM-3PM, There will be a lane closure in both directions on I-840 for taking core samples of bridge decks at MM 69. One lane will remain open in each direction.

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather. 

 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.