West Tennessee Weekly Construction June 7-14, 2017

Thursday, June 08, 2017 | 10:02am

BENTON COUNTY, I-40 Truck Climbing Lane

Wednesday, June 7 through Wednesday, June 14: There are no scheduled closures. Motorists should watch for trucks entering and exiting the roadway in a construction zone.

*Speed limit is reduced to 45 MPH.

 

BENTON COUNTY, SR-69 (US-641): Resurfacing work will cause possible temporary lane closures in both directions daily, from the Decatur County line to near James Walker Road.

 

CARROLL COUNTY, SR-1 (US-70): Bridge repair project on SR 1 over overflow LM 31.17.

Tuesday, April 25 through Tuesday, October 31, 2017, a signal system is being utilized. Motorists should watch for trucks entering and exiting the roadway. Watch for flagmen.

Restrictions: On Tuesday, April 25, 2017, a signal system was put into place. Traffic is reduced to one lane in each direction with an 11’ lane restriction.

 

CARROLL COUNTY, SR-424: Construction of a concrete bulb-tee beam bridge on SR 424 over Roan Creek will cause possible lane closures throughout the project. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways. Restrictions: Beginning Thursday, January 19, 2017, a signal system was put into place. Traffic will be reduced to one lane in each direction with a 10’ lane restriction.

 

CARROLL COUNTY, SR-436: Resurfacing work will cause possible temporary lane closures in both directions daily, from near the north end of the Old Obion River bed bridge to SR 76.

 

FAYETTE COUNTY, I-40: The grading, drainage, construction of a concrete bulb-tee bridge and paving on I-40 at the SR 196 (Hickory Withe Road) interchange. Motorists should watch for trucks entering and exiting the roadway.

Wednesday, June 7 through Wednesday, June 14:  There are no scheduled closures.

 

FAYETTE COUNTY, SR-59

Tuesday, June 6 through Saturday, June 8: The railroad plans to close the roadway to work on a railroad crossing near Mason.

 

HARDEMAN COUNTY, SR-100: Bridge Repair project on SR 100 over overflow

A signal system is being utilized. Motorists should watch for trucks entering and exiting the roadway. Watch for flagmen.

 

 

HARDIN COUNTY, SR-15 (US-64): A widening project on SR 15 from Firetower Road to west of Bigbee Branch. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

 

HARDIN COUNTY, SR-128: A widening project on SR 128 from South of Opel Loop to US-64 (SR 15) in Savannah will cause possible lane closures throughout the project. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

 

HAYWOOD COUNTY-I-40 from Mile Marker 46 (LM 2.86) to near Koko Road (LM 8.36):

Sunday, June 11 through Thursday, June 15, 7:00 p. m.-6:00 a. m.: There will be lane closures on I-40 east and westbound from MM 46 to Koko Rd for removal of snowplowable markers, milling, and paving. Speed limit is reduced to 60 MPH. Weather Permitting.

 

HAYWOOD COUNTY-SR-19 (Brownsville Bypass): A widening project on SR 19 from west of Windrow Road to SR 76 south of Brownsville will cause possible lane closures throughout the project. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

 

HAYWOOD COUNTY–SR-76: Construction of a concrete bulb tee beam bridge over the Hatchie River–Wednesday, May 3, 2017 SR 76 will CLOSE at log mile 8.98 (approx. 1 mile south of the

I-40/Exit 56 interchange) for removal of the truss bridge.

*Local traffic will have access up to the bridge. An interstate detour will be posted at Exit 56 and Exit 52 (Stanton/KoKo Road).

 

HENDERSON COUNTY–I-40:

Sunday, June 11 through Thursday, June 15, 7:00 p. m.-6:00 a. m.: There will be lane closures on I-40 east and westbound from Madison County Line to East of SR-104 for removal of snowplowable markers, milling, and paving. Speed limit is reduced to 60 MPH. Weather Permitting

 

LAKE COUNTY, SR-21:  The construction of a concrete I-Beam bridge on SR 21 over Branch Creek, including grading, drainage, and paving.  Beginning Monday, September 12, 2016, SR 21 was closed to thru traffic until approximately September 30, 2017. Detour route posted.

 

LAKE COUNTY, SR-78: The construction of a concrete Bulb-Tee bridge on SR 78 over drainage ditch LM 16.51 including grading, drainage, and paving will cause possible lane closures throughout the project.

 

LAUDERDALE, SR-3: Resurfacing will cause possible lane closures from SR 19 (Lake Drive) to near New Wilson Road.

 

 

 

 

MADISON COUNTY, SR-138: Construction of 2 concrete box bridges on SR 138 over Muddy Creek will cause possible lane closures throughout the project.

Restrictions: Beginning possibly Monday, June 5 through Thursday, August 31 a signal system will be utilized. Traffic will be reduced to one lane in each direction with an 11’ lane restriction. Sanderson Road will be closed to through traffic.

 

OBION COUNTY, Future I-69: Grading, drainage, construction of eight bridges on future I-69 from south of US 51 (SR 3) to south of US 45W (SR 5) will cause possible lane closures throughout the project.

*Speed limit is reduced to 45 MPH through the US 51 (SR 3) portion of the project.

Restrictions: Beginning Tuesday, May 30, SR-3 will have a lane shift in the north and southbound directions. Traffic will be reduced to one lane in each direction with a 12’ 8” lane restriction.

 

SHELBY COUNTY, I-40 at Canada Road

Wednesday, June 7 through Wednesday, June 14: I-40 speed limit has been reduced to 55 MPH.  There are lane shifts on I-40 east and westbound. Beginning December 5, 2014, there are transitions south and northbound on Canada Road.

 

Wednesday, June 7 through mid summer: The I-40 westbound exit ramp to Canada Rd. (MM 20.0) will be CLOSED for permanent ramp reconstruction. Detour route to be posted. 

 

Wednesday, June 7 through Friday, June 9, 9:00 p. m.-5:00 a. m: I-40 eastbound traffic will have alternating lane closures for removing and shifting barrier rails.

 

LOOK AHEAD:

 

Wednesday, June 14 through Friday, June 16, 9:00 p. m.-5:00 a. m: I-40 westbound traffic will have alternating lane closures for removing and shifting barrier rails.

 

SHELBY COUNTY, I-40 Bridge Over the Wolf River (LM 9.42)

 

LOOK AHEAD:

 

Friday, June 16, 8:00 p. m. through Monday, June 19, 6:00 a. m.: There will be lanes closures with two lanes to remain open on I-40 westbound (MM 9.42) to allow for repairs to the expansion joint. Speed limit is reduced to 55 MPH. THP will assist with traffic control.*Friday, June 23, 8:00 p.m. through Monday, June 26, 6:00 a. m. will serve as a backup date. Weather Permitting.

*On SR 14 the Ramp from southbound Old Austin Peay Highway to southbound SR 14 Ramp will be closed. A detour will be provided.

 

 

 

 

 

SHELBY COUNTYMilling

Saturday, June 10, 9:00 a. m.-3:00 p. m.: CLOSE the Jackson Avenue Exit ramp on I-40 westbound going to SR-14 northbound for paving. *Sunday, June 11, 9:00 a. m.-3:00 p. m. will serve as a backup date. Weather Permitting.

 

Sunday, June 11, 9:00 a. m.-3:00 p. m.: CLOSE the “On” ramp from SR-14 southbound going to I-40 westbound for paving. *Monday, June 12, 9:00 a. m.-3:00 p. m. will serve as a backup date. Weather Permitting.

 

SHELBY COUNTY, I-55 from near Horn Lake Road (LM 8.00 L&R) to McLemore Road (LM 11.00 L&R)

Sunday, June 11 through Thursday, June 15, 8:00 p. m.-5:00 a. m: There will be INTERMITTENT closures with one lane to remain open on I-55 north and southbound (MM 8.00 to MM 11.00) to allow for resurfacing. Speed limit is reduced to 45 MPH. THP will assist with traffic control. Weather Permitting.

 

LOOK AHEAD:

 

Sunday, June 18 through Thursday, June 22, 8:00 p. m.-5:00 a. m: There will be INTERMITTENT closures with one lane to remain open on I-55 north and southbound (MM 8.00 to MM 11.00) to allow for resurfacing. Speed limit is reduced to 45 MPH. THP will assist with traffic control. Weather Permitting.

 

SHELBY COUNTY, SR-1: Construction of a welded steel plate girder bridge on SR 1 over the Loosahatchie River will cause possible lane closures throughout the project.

 

SHELBY COUNTY, SR-3:

Monday, June 12, 7:00 a. m. through Friday, June 16, 5:00 p.m.: There will be lane closures on US-51 (SR-3) north and/or southbound one lane in each direction will remain open. Bridge improvements on Fite Road from SR-3 (US-51) to Woodstock Blvd.

 

SHELBY COUNTY, SR-14 (Austin Peay Hwy): Construction on SR 14 for a widening project from

SR 204 (Singleton Parkway) to east of Old Covington Pike. Shoulders are closed north and southbound. There will be possible temporary lane closures throughout the project.

On April 21, 2017, Old Covington Pike East access to/from SR 14 was permanently CLOSED.

*Speed limit has been reduced to 45 MPH.

 

SHELBY COUNTY, SR-384

Monday, June 5, through Wednesday, June 7: There will be a temporary lane closures between Hasting Way and Whaley for culvert repair.

 

SHELBY COUNTY, SR-385 over I-240: Bridge Repair project will cause possible lane closures throughout the project.

Wednesday, June 7 through Wednesday, June 14: There are no scheduled closures.

SHELBY COUNTYSR-385

Thursday, June 8, 8:00 a. m.-6:00 p.m.: There will be INTERMITTENT closures with one lane to remain open on SR 385 between (MM 12.10 to MM 35.9) for infrared repair at multiple locations. The locations for the closures will be switched as repairs are completed.

 

TDOT MAINTENANCE:

Wednesday, June 7 through Wednesday, June 14, 9:00 a. m.-3:00 p. m.: There will be possible lane closures at various locations in Region IV in order to repair pavement on an as needed basis.

 

TDOT REGION 4: On-Call Guardrail Repair/Concrete Barrier Rail Repair (Nighttime):

Wednesday, June 7 through Tuesday, June 13: There are no scheduled closures.

 

TDOT REGION 4: On-Call Guardrail Repair/Concrete Barrier Rail Repair (Daytime):

Wednesday, June 7 through Tuesday, June 13: There are no scheduled closures.

 

TDOT REGION 4: On-Call pavement markings

Wednesday, June 7 through Saturday, June 10, 8:00 p. m.-6:00 a.m.: There will be lane closures at the following locations in Shelby Co. for the replacement of snowplowable pavement markers and restriping. There will be a “rolling lane closure” in effect. THP will assist with traffic control. Weather Permitting.

 

  • SR-177, Shelby County, north and southbound from LM 4.83 (end Wolf River Bridge) to LM 13.11 (SR 1/US 70)

 

TDOT Region 4: Random On-Call Signing

Friday, June 9 through Tuesday, June 13: There are no scheduled closures.

 

TDOT REGION 4: Relensing of Snowplowable Markers:

Tuesday, June 6, through Wednesday, June 14 (excluding Friday & Saturday), 8:00 p.m.-6:00 a. m.: There will be night time lane closures at the following various locations for relensing of snowplowable pavement markers. THP will assist with traffic control. Weather Permitting.

 

  • I-40, Haywood County, east & westbound, (MM 52.00 to MM 67.00), one lane will remain open.
  • I-40, Madison County, east & westbound, (MM 67.00 to MM 95.0) one lane will remain open.
  • I-40 Henderson County, east & westbound, (MM 101.00 to MM 119.78) one lane will remain open.

 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or for West Tennessee follow https://twitter.com/NicLawrenceTDOT. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.