S-GRC-6
GUARDRAIL CONNECTION TO BRIDGE ENDS FOR LOW SPEED ROADWAYSLatest Revision Note
07/07/2023 GENERAL NOTE (I) WAS ADDED.
Related Standard Drawings
| DRAWING | DESCRIPTION | REMARKS |
|---|---|---|
| D-FLU-2 | BRIDGE END DRAIN FLUME DETAILS | WHEN BRIDGE END DRAIN FLUME IS REQUIRED, USE 12 INCH DEEP BLOCK-OUTS SEE STANDARD DRAWINGS FOR DETAILS |
| D-FLU-2A | BRIDGE END DRAIN FLUME DETAILS | WHEN BRIDGE END DRAIN FLUME IS REQUIRED, USE 12 INCH DEEP BLOCK-OUTS SEE STANDARD DRAWINGS FOR DETAILS |
| S-GR31-1 | W-BEAM GUARDRAIL | FOR BRIDGE RAILING DETAILS |
| S-GR31-1C | GUARDRAIL GENERAL NOTES AND POST DETAILS | FOR WOOD BLOCK-OUT DETAIL |
| S-PL-1 | SAFETY PLAN AT ROADSIDE HAZARDS | VARIABLE LENGTH INCREMENT TO MEET LON |
| S-PL-3 | SAFETY PLAN: MINIMUM INSTALLATION AT BRIDGE ENDS | FOR ALL OTHER GUARDRAIL DETAILS AND MATERIAL PROPERTIES NOT SHOWN |
| S-SSMB-6 | GUARDRAIL ATTACHMENT TO SINGLE SLOPE CONCRETE BARRIER WALL | FOR CONNECTION TO CONCRETE BARRIER WALLS |
Related Item Numbers
| ITEM NO. | U/M | DESCRIPTION | REMARKS |
|---|---|---|---|
| 705-06.01 | L.F. | W BEAM GR (TYPE 2) MASH TL3 | |
| 705-06.26 | EACH | THRIE BEAM BRIDGE TRANSITION MASH TL-2 | |
| 706-06.30 | EACH | GR TERMINAL (ENERGY ABSORBING) MASH TL2 |
Archived Standard Drawings
| DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
|---|
| 06-28-2019 | 02-28-2020 | 10-16-2020 | 06-15-2021 | 07-07-2023 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: June 6, 2025 at 1:11 PM
