Roadway Activity Report for the Lower East and Upper Cumberland (September 10-16, 2026)

Thursday, September 10, 2026 | 02:06pm

BRADLEY COUNTY SR-40 (WATERLEVEL HWY.) Utility Work both directions from LM 2.69 to LM 3.32: Flagger‑assisted lane closures on SR‑40 (Water Level HWY) between Rose Lane and HWY 40 on‑ramp. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 09/30/2026 from 9 am to 2 pm [2026‑089]

BRADLEY COUNTY SR-74 (OCOEE ST. N.E.) Utility Work both directions from LM 16.84 to LM 16.: Flagger‑assisted lane closures on SR‑74 (N.E. Ocoee St.) between Gale Drive Northeast and Mouse Creek Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/10/2026 through 09/23/2026 from 9 pm to 6 am (2026‑188)

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTIES – The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes: No Region 2 lane closures this week on CNX913.
 [Davis H. Elliot Construction Company, Inc./Maint - R2/CNX913]

CANNON COUNTY SR-53 [18.21-24.08] from near Pleasant Ridge Road to Dekalb County line resurfacing: The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing‑related operations.
 [Tinsley Asphalt, LLC/McMinnville/CN26202]

CANNON COUNTY SR-64 [0-9.12] from the Coffee County Line to SR-1 (US-70S) resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing‑related operations.
 [Asphalt Paving Systems, Inc./McMinnville/CN26201]

CANNON COUNTY SR-99 [0-1.37] from the Rutherford County Line to SR-64 resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing‑related operations.
 [Asphalt Paving Systems, Inc./McMinnville/CN26201]

COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road: Nightly entrance and exit ramp closures at MM 117 interchange on I‑24 at Wattendorf/AEDC Highway starting Sunday 09/13 through Friday 09/18. One ramp will be closed at a time from 7 PM to 6 AM to swap traffic to new ramps. Short‑term flagging operations expected for trucks entering and exiting the work zone. Use caution.
 [Jones Bros. Contractors, LLC/Tullahoma/CNZ029]

COFFEE COUNTY SR-16 (S. JACKSON ST.) Utility Work both directions at LM 4.80: Flagger‑assisted lane closures on SR‑16 (S. Jackson St.) between New Rock Creek Rd. and W. Monroe St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones present 08/31/2026 through 09/30/2026 from 9 am - 2 pm [2025‑609]

COFFEE COUNTY SR-2 (HILLSBORO HWY.) Utility Work both directions at LM 15.53: Flagger‑assisted lane closures on SR‑02 (Hillsboro Blvd.) between Walls St. and Shelton Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/31/2026 through 09/28/2026 from 9 am to 2 pm [2026‑158]

COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St., LM 2.6) in Tullahoma: Phase 2 roadway widening and bridge replacement continues. Lanes reduced from 3 to 2 with one lane in each direction. Intermittent flagging operations expected.
 [Dement Construction Company, LLC/Tullahoma/CNX912]

COFFEE COUNTY SR-55 [14.4-15.1] from Old Bushy Branch Road to Interstate Drive bridge replacement: SR‑55 reduced to one lane in each direction from LM 14.4 to LM 15.1 for bridge replacement at LM 14.77. Left lane in each direction is closed. Short‑term flagging expected for construction vehicles entering/exiting the work zone.
 [Dement Construction Company, LLC/Maint - R2/PD2501]

COFFEE COUNTY SR-55 [2.8-7.35] resurfacing: Nightly lane closures 7 PM–6 AM for pavement marking installation. One lane maintained in each direction.
 [Volunteer Highway Supply Co., Inc./Tullahoma/CN26203]

CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: Construction continues within the I‑40 median. Traffic shifted along project route. Motorists should use caution.
 [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY I-40 [306.2-311] from MM 306.2 to MM 311 resurfacing: Contractor began resurfacing 09/08/2026 at 7 PM. Work occurs nightly from Sunday night through Friday 7 PM–6 AM. Motorists should use caution.
 [Rogers Group, Inc./Crossville/CNZ327]

CUMBERLAND COUNTY SR-24 [0-0.16] bridge repair: Contractor continues bridge repair on I‑40 at MM 304.6 or SR‑24 at LM 0.24. SR‑24 reduced to one lane with temporary signals. Use caution.
 [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR‑24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR‑462 and SR‑1. The contractor is performing general clearing activities and utility work; once completed, they will proceed with replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.
 [Mid-State Construction Company, Inc./Crossville/CNZ206]

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Lawson Road remains closed with a detour in place to utilize Tabor Road. Temporary lane closures and periodic traffic stoppages may be necessary for construction activities. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution as traffic patterns change.
 [Jones Bros. Contractors, LLC/Crossville/CNV009]

CUMBERLAND COUNTY SR-28 [12.61-14.96] from near SR-392 to near US-70 resurfacing: The contractor continues final project activities on SR‑28 (Main Street) between SR‑392 (Miller Ave.) and near SR‑24 (Elmore Rd.). Work may be scheduled nightly Sunday night through Friday morning from 7 PM to 6 AM. Temporary lane closures and flaggers will be utilized as needed. Motorists should be aware of the work zone and seek alternate routes.
 [Rogers Group, Inc./Crossville/CNZ291]

CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): Traffic has been shifted to the new alignment from LM 29.2 in Cumberland County near N. Lowe Rd. to LM 1.87 in Fentress County near Little Rd. Intermittent lane closures and flaggers will be used as needed. Motorists should use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel.
 [Jones Bros. Contractors, LLC/Cookeville/CNV300]

DEKALB COUNTY SR-26 (US-70) grading, drainage, and retaining wall/paving work from near SR-53 (LM 2) to near SR-96 (LM 6.1): Work continues near the intersection of SR‑26 and SR‑53. Lane closures may be used, with flaggers present to assist traffic. Motorists should use caution and watch for construction equipment adjacent to the roadway.
 [Twin K Construction/Cookeville/CNV012]

FENTRESS COUNTY SR-62 (W. DEER LODGE HWY.) Utility Work both directions from LM 0.00 to LM 10.40: Flagger‑assisted lane closures on SR‑62 (Clarkrange–Monterey Hwy) between Short Dr. and SR‑262. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 09/14/2026 through 10/16/2026 from 9 am to 2 pm [2026‑382]

FENTRESS COUNTY SR-62 [0-5.83] from Putnam County Line to SR-28 resurfacing: Intermittent lane closures will occur for the duration of resurfacing work. Flaggers will be used as needed. Motorists should use caution, follow signs, and watch for construction equipment and personnel.
 [Rogers Group, Inc./Livingston/CN26203]

FRANKLIN COUNTY SR-15 (COWAN RD.) Utility Work both directions from LM 17.10 to LM 17.11: Flagger‑assisted lane closures on SR‑015 (Bypass Rd.) at Bypass Rd. and Old Mill Ave. Motorists should reduce speed and prepare to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 09/30/2026 from 9 am - 2 pm [2026‑276]

FRANKLIN COUNTY SR-476 (MANSFORD RD.) Utility Work both directions from LM 1.26 to LM 1.88: Flagger‑assisted lane closures on SR‑476 (Mansford Rd.) between Wildwood Race and Old Mansford Rd. Motorists should reduce speed and prepare to stop. Trucks, signage, flaggers, and barrels/cones will be present 08/24/2026 through 09/24/2026 from 9 am - 2 pm (2026‑595)

GRUNDY COUNTY SR-2 (US-41) Utility Work both directions from LM 5.29 to LM 5.69: Flagger‑assisted lane closures on SR‑02 (US‑41 Hwy) between Bells Cove and West Main St. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 09/15/2026 through 11/17/2026 from 9 am - 2 pm [2026‑520]

HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange:
 • SR‑153 SB ramp to I‑75 NB reduced to one lane
 • Traffic shifts active throughout interchange
 • Hamilton Loop Road closed for retaining wall and drainage installation
 • On 09/16/2026, 10 PM–6 AM, contractor will close the I‑75 SB entrance ramp from Hamilton Place Blvd to shift traffic onto the new bridge
 • Speed limit reduced throughout project limits
 • Nightly lane closures permitted 8 PM–6 AM
 Motorists should use caution and remain alert for workers and equipment.
 [Summers‑Taylor, Inc./Chattanooga West/CNX358]

HAMILTON COUNTY SR-17 [5.63-8.75] from Campbell Street to SR-153 resurfacing: From 07/09/2026 through 09/31/2026, the contractor will perform flagging operations at Wilder, Stuart, Wilhoit, and Frost Streets from 9 AM to 5 PM for concrete curb ramp construction. Beginning 09/08/2026 through 10/31/2026, asphalt milling and paving operations will occur nightly 8 PM–6 AM.
 [Wright Brothers Construction Company, Inc./Chattanooga West/CN26202]

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 14.75: THIS IS NIGHTTIME WORK. Flagger‑assisted lane closures on SR‑2 (Brainerd Rd.) between Hunt Ave. and Aiken Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/10/2026 through 09/09/2026 from 9 am - 2 pm [2026‑373]

HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 23.71 to LM 28.83: Flagger‑assisted lane closures on SR‑2 (S. Lee Hwy.) between White Oak Valley Circle and Gilchrist Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/10/2026 through 09/11/2026 from 9 am - 2 pm [2026‑619]

HAMILTON COUNTY SR-2 (US-41, Broad St.) [5.94-7.1] from SR-17 (Tennessee Avenue) to 21st Street resurfacing: Utility contractors outside this contract will be adjusting manholes.
 [APAC - Atlantic, Inc./Chattanooga East/CN26202]

HAMILTON COUNTY SR-2 [11.86-11.63] Missionary Ridge tunnel cleaning: The McCallie Tunnels will be cleaned on 09/16/2026 from 8 PM to 6 AM, weather permitting. The contractor will clean one side at a time and flag traffic. Motorists should expect delays.
 [Diamond Specialized, Inc./Chattanooga West/CN26203]

HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 8.88: THIS IS NIGHTTIME WORK. Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Eagle Dr. and Jackson Mill Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/10/2026 through 09/16/2026 from 9 pm - 6 am [2025‑1000 and 2026‑025]

HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 9.604: Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Thrasher Pike and Hideaway Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/10/2026 through 09/11/2026 from 9 am - 2 pm [2026‑554]

HAMILTON COUNTY SR-320 [0-3.87] from SR-2 (Brainerd Road) to Graysville Road: Contractor will begin construction on Tuesday 09/08/2026. This work will require flagging operations on SR‑320 from LM 0 to LM 3.87 in both directions. Construction will occur during daytime hours.
 [Wright Brothers Construction Company, Inc./Chattanooga East/CN26204]

HAMILTON COUNTY SR-320 [0.86-1.11] replacement of bridge over CSX railroad: Contractor performing utility pole and overhead line relocation on SR‑320 from LM 0.86 to LM 1.11. Daily flagging operations from 7 AM to 5 PM. Use caution.
 [Dement Construction Company, LLC/Chattanooga West/CNZ267]

HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 0.70: Flagger‑assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between East Brainerd Rd. and Sedgefield Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones present 09/10/2026 through 09/16/2026 from 9 am - 2 pm [2026‑456]

HAMILTON COUNTY SR-58 [2.17-4.55] from SR-17 to near 21st Street West resurfacing: Beginning 08/16/2026 through 09/31/2026, contractor performing asphalt milling and resurfacing operations. Expect nightly flagging 7 PM–6 AM. Motorists should use caution and watch for personnel.
 [Wright Brothers Construction Company, Inc./Chattanooga West/CN26201]

HAMILTON COUNTY SR-8 (BROAD ST.) Utility Work both directions at LM 8.49: Flagger‑assisted lane closures on SR‑08 (Broad St.) between Cowart St. and Chestnut St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/08/2026 through 09/25/2026 from 9 am - 2 pm [2026‑581]

HAMILTON COUNTY SR-8 (BROAD ST.) Utility Work both directions at LM 8.56: Flagger‑assisted lane closures on SR‑08 (Broad St.) between Cowart St. and Chestnut St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/08/2026 through 09/25/2026 from 9 am - 2 pm [2026‑431]

HAMILTON COUNTY SR-8 (MARKET ST.) TDOT Bridge Inspection both directions at LM 9.68: Required quarterly inspection, maintenance, and testing of mechanical/electrical systems on Market Street Bridge will require bridge closure on Sunday, September 13 from 8 AM until no later than 5 PM. Use Veterans Bridge or Olgiatti Bridge as alternate routes.

HAMILTON COUNTY SR-8 (SIGNAL MOUNTAIN BLVD.) Utility Work both directions from LM 15.75 to LM 16.95: Flagger‑assisted lane closures on SR‑008 (Signal Mountain Blvd.) between Sunset Dr. and Laurel St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones present 08/27/2026 through 09/03/2026 from 9 pm to 6 am (EPB Maintenance work)

HAMILTON COUNTY SR-8 (US-41, Main Street) [5.7-8.33] from SR-2 (Dodds Avenue) to SR-17 (Broad Street) resurfacing: Contractor working Sunday 07/30/2026 at 8 PM. Resurfacing requires flagging or lane closures. Work occurs nightly 8 PM–6 AM Sunday evening through Friday morning. No overnight parking allowed during work hours. Vehicles left unattended will be towed. Parking notices posted.
 [APAC - Atlantic, Inc./Chattanooga East/CN26202]

HAMILTON COUNTY SR-8 [11.67-11.75] Stringer's Ridge tunnel cleaning: Tunnel will be closed 09/16/2026 from 8 PM to 6 AM for cleaning. Detour in effect. Work is weather permitting.
 [Diamond Specialized, Inc./Maint - Chattanooga/CN26203]

HAMILTON COUNTY SR-8 [5.04-5.27] Bachmann Tubes tunnel cleaning: Bachman Tunnel will be closed 09/17/2026 from 8 PM to 6 AM for cleaning. Detour in effect. Work is weather permitting.
 [Diamond Specialized, Inc./Chattanooga West/CN26203]

MCMINN COUNTY I-75 [39-43.2] from MM 39 to MM 43.2 resurfacing: During this reporting period, the contractor will continue punch list work on I‑75 in McMinn County between MM 39 and MM 43.2. This work will require nightly lane closures from 7 PM to 6 AM Sunday night through Saturday morning. Motorists should use caution and be aware of workers and equipment.
 [Wright Brothers Construction Company, Inc./Cleveland/CNZ328]

MCMINN COUNTY SR-30 [19.69-22.88] from SR-33 Tennessee Ave to CR-890 resurfacing: During this reporting period, the contractor will continue resurfacing work on SR‑30 (US‑411). Lane closures will be necessary when workers are present. Motorists should use caution and reduce speed.
 [Rogers Group, Inc./Cleveland/CN26205]

MEIGS COUNTY SR-58 [18.21-26.82] from SR-304 (River Road) to SR-68 resurfacing: The contractor will begin performing flagging operations during this reporting period. Motorists should be cautious of equipment entering and leaving the work zone. Work will occur Monday through Thursday during daytime hours on SR‑58 between LM 18.21 and LM 26.82.
 [Rogers Group, Inc./Chattanooga East/CN26203]

OVERTON COUNTY SR-111 (W. MAIN ST.) Utility Work both directions from LM 10.12 to LM 11.14: Flagger‑assisted lane closures on SR‑111 (West Main St.) between Rickman Rd. and Evans St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones present 06/18/2026 through 09/18/2026 from 9 am - 2 pm [2026‑577]

OVERTON COUNTY SR-52 (JAMESTOWN HWY.) Utility Work both directions from LM 20.36 to LM 24.62: Flagger‑assisted lane closures on SR‑52 (Jamestown Hwy) between Red Rose Lane and Bolestown Cemetery Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones present 09/14/2026 through 10/02/2026 from 9 am - 2 pm [2025‑742]

POLK COUNTY SR-315 [0-7.16] from SR-30 to SR-315 resurfacing: Contractor will complete punch list work on SR‑315. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers. Motorists should use caution and reduce speed.
 [Talley Construction Company, Inc./Cleveland/CN26203]

POLK COUNTY SR-68 over SR-40 the construction of bridges: Contractor will continue punch list work on SR‑68 and SR‑40. Traffic is in final alignment and all ramps are open. Temporary lane closures may still be necessary for finishing work. Motorists should be aware of changing traffic patterns.
 [Wright Brothers Construction Company, Inc./Cleveland/CNZ042]

POLK COUNTY SR-68 [13.92-21.88] from Stansbury Road to Tennessee-Georgia State Line resurfacing: Contractor will continue resurfacing work on SR‑68. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers at times. Motorists should use caution and reduce speed.
 [Talley Construction Company, Inc./Cleveland/CN26203]

PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing: Construction continues within the median of I‑40. Traffic has been shifted. Motorists should use caution and be aware of construction vehicles entering/exiting the work zone.
 [Rogers Group, Inc./Crossville/CNZ290]

PUTNAM COUNTY SR-135 (N. WILLOW AVE.) Utility Work both directions from LM 11.71 to LM 12.67: Flagger‑assisted lane closures on SR‑135 (N. Willow Ave.) between E. 12th St. and Shiplet Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones present 08/24/2026 through 09/30/2026 from 9 am - 2 pm [2026‑256]

PUTNAM COUNTY SR-136 (N. WASHINGTON AVE.) Utility Work both directions from LM 5.33 to LM 7.07: Flagger‑assisted lane closures on SR‑136 (W. Main St.) between E. 11th St. and Dale Ln. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones present 08/24/2026 through 09/30/2026 from 9 am - 2 pm [2026‑255]

PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor will continue normal activities throughout the project. Temporary lane closures are possible, and flaggers will be present. Motorists should use caution and watch for construction equipment.
 [Rogers Group, Inc./Cookeville/CNV284]

PUTNAM COUNTY SR-136 [2.27-4.15] from I-40 Eastbound Ramps to SR-24 resurfacing: Nightly lane closures will continue from 7 PM until 6 AM. One lane in each direction will be closed, and flaggers will be present at side roads. Motorists should be prepared to stop.
 [Vulcan Construction Materials, LLC/Cookeville/CNZ293]

PUTNAM COUNTY SR-290 [0-1.57] from Jackson County Line to near Shipley School Road resurfacing and bridge repair: Contractor on site intermittently performing punch list work. Lane closures may be used with flaggers and temporary traffic control devices. Motorists should use caution and be prepared to stop.
 [Rogers Group, Inc./Cookeville/262029]

PUTNAM COUNTY SR-96 (MARTIN CREEK RD.) Utility Work both directions from LM 3.24 to LM 4.94: Flagger‑assisted lane closures on SR‑96 (Martin Springs Rd.) between Bartlett Cemetery and Martin Creek. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones present 09/08/2026 from 9 am - 2 pm [2026‑316]

REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: No lane closures this week. Periodic shoulder closures will occur at various locations on I‑24, I‑75, SR‑29, and SR‑153 between 8 PM and 5 AM.
 [Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]

REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: Short‑term shoulder or lane closures may occur. At least one travel lane will remain open. Daytime outside shoulder closures will occur on Bradley I‑75 between MM 25 and MM 33.
 [Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]

REGION 2 crack sealing at various locations on various State Routes: Lane closures with flagging operations will occur in Polk County SR‑40 LM 6.00–23.04, then Bradley County SR‑60 LM 0.0–8.2, then Meigs County SR‑60 LM 0–3.1.
 [Reynolds Sealing and Striping, Inc./McMinnville/CN26203]

REGION 2 the on-call cable barrier repair on various Interstate and State Routes.: Shoulder closures will occur in medians of interstates and major divided routes Monday–Friday during daylight hours.
 [LU, Inc./McMinnville/CNZ205]

REGION 2 the on-call guardrail repair and new guardrail installation on various Interstate and State Routes: Short‑term shoulder/lane closures nightly Sunday–Thursday 7 PM–6 AM on interstates; daily Monday–Friday on state routes with flaggers present. At least one travel lane remains open.
 [Reynolds Fence and Guardrail, Inc./McMinnville/CN26203]

REGION 2 the random on-call asphalt pothole patching on various Interstate and State Routes: Weekday work 8 AM–6 PM in Hamilton County on SR‑58 LM 17.29–26.19 SB. Motorists should use caution near equipment.
 [Pavement Restorations, Inc./Chattanooga East/CNZ279]

REGION 2 the retracing of painted pavement marking lines on various routes: Restriping operations in Clay County SR‑135 LM 0.00–8.43; Overton County SR‑164 LM 8.72–13.72; Marion County SR‑422 LM 0.00–2.40; Polk County SR‑30 LM 2.65–5.75; Hamilton County SR‑27 LM 0.947–1.041. Motorists should expect wet paint and use caution.
 [The Aero Mark Company, LLC/Cookeville/262002]

REGION 2 the sweeping on various Interstate and State Routes: Sweeping operations will occur at night 8 PM–6 AM on interstates/high‑traffic routes and daytime 9 AM–3 PM on lower‑traffic routes.
 [Spears-Hopkins Paving Co., LLC/Chattanooga West/CNZ248]

SEQUATCHIE COUNTY SR-111 [4.32-7.57] resurfacing with cold in-place recycling (CIR): Resurfacing on SR‑111 from near Lewis Chapel Rd. (LM 4.3) to near East Valley Rd. (LM 7.5) will require single‑lane closures controlled by flaggers. Motorists should use caution.
 [Tinsley Asphalt, LLC/Dunlap/CN26201]

SEQUATCHIE COUNTY SR-8 [22.73-27.42] from south of Whitlow Road (LM 22.7) to north of Sherman Road (LM 27.4): Resurfacing on SR‑8 in both directions will require lane closures controlled by flaggers. Motorists should use caution.
 [Tinsley Asphalt, LLC/Dunlap/CN26205]

WARREN COUNTY SR-55 BUS [0-3.19] from SR-55 to SR-56 resurfacing (micro surface): Lane closures with flagging operations will occur day and night. No closures allowed during school peak hours (6:30–8:00 AM and 2:30–4:00 PM).
 [Asphalt Paving Systems, Inc./McMinnville/CN26201]

WARREN COUNTY SR-55 [1.1-8.55] from SR-379 to east of Hallum Lane resurfacing (micro surface): Lane closures for resurfacing will occur day and night as needed. [Asphalt Paving Systems, Inc./McMinnville/CN26201]

 

RESTRICTIONS

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY – CNX913

CUMBERLAND COUNTY – CNZ206: Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.

###