Roadway Activity Report for the Lower East and Upper Cumberland (August 20-26, 2026)
BRADLEY COUNTY SR-40 (WATERLEVEL HWY.) Utility Work both directions at LM 3.65: Flagger‑assisted lane closures on SR‑40 (Waterlevel Hwy.) between Minnis Road and Randolph Samples Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 08/26/2026 from 9 am to 2 pm [2025‑931]
BRADLEY COUNTY SR-40 (WATERLEVEL HWY.) Utility Work both directions from LM 2.69 to LM 3.32: Flagger‑assisted lane closures on SR‑40 (Waterlevel Hwy.) between Rose Lane and Hwy. 40 on‑ramp. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 09/30/2026 from 9 am to 2 pm [2026‑089]
BRADLEY COUNTY SR-74 (SPRING PLACE RD.) Utility Work both directions at LM 12.11: Flagger‑assisted lane closures on SR‑74 (Spring Place Rd. SE) between Elrod St. and Hwy. 40 exchange. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 08/26/2026 from 9 am to 2 pm [2026‑239]
BRADLEY COUNTY SR-74 (SPRING PLACE RD.) Utility Work both directions at LM 12.11: Flagger‑assisted lane closures on SR‑74 (Spring Place Rd. SE) between Elrod St. and Hwy. 40 exchange. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 08/19/2026 from 9 am to 2 pm [2026‑239]
BRADLEY COUNTY SR-74 [0-9.11] from Georgia-Tennessee State Line to SR-313 resurfacing: During this reporting period, the contractor will begin punch list work on SR‑74. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers while work is performed. Motorists should use caution and reduce speed when traveling through the work zone.
[Talley Construction Company, Inc./Cleveland/CN26202]
CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY: The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes.: No Region 2 lane closures this week on CNX913.
[Davis H. Elliot Construction Company, Inc./Maint - R2/CNX913]
CANNON COUNTY SR-1 (JIM CUMMINGS HWY.) Utility Work both directions at LM 6.61: Flagger‑assisted lane closures on SR‑1 (W. Main St.) between McCrary St. and N. Cannon St. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/13/2026 from 9 am to 2 pm [2026‑364]
CANNON COUNTY SR-145 [0-9.67] from SR-1 (US-70S) to SR-96 micro surfacing: The contractor will have lane closures with flagging operations during daylight hours as needed for punch list work from 6 AM to 8 PM.
[Asphalt Paving Systems, Inc./McMinnville/CN26200]
CANNON COUNTY SR-53 [18.21-24.08] from near Pleasant Ridge Road to DeKalb County line resurfacing: The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing‑related operations.
[Tinsley Asphalt, LLC/McMinnville/CN26202]
CANNON COUNTY SR-64 [0-9.12] from the Coffee County Line to SR-1 (US-70S) resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing‑related operations.
[Asphalt Paving Systems, Inc./McMinnville/CN26201]
CANNON COUNTY SR-99 [0-1.37] from the Rutherford County Line to SR-64 resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing‑related operations.
[Asphalt Paving Systems, Inc./McMinnville/CN26201]
CLAY COUNTY SR-52 [23.6-26.6] From near Poor House Road to Overton County Line resurfacing and bridge repair: There will be intermittent lane closures for the duration of the work. Flaggers will be used as needed to control traffic through the work zone. Motorists are encouraged to use caution, follow signage, and watch for construction equipment and personnel.
[Asphalt Paving Systems, Inc./Livingston/CN26200]
COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short‑term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone.
[Jones Bros. Contractors, LLC/Tullahoma/CNZ029]
COFFEE COUNTY SR-2 (HILLSBORO RD.) Utility Work both directions at LM 15.53: Flagger‑assisted lane closures on SR‑2 (Hillsboro Blvd.) between Walls St. and Shelton Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/31/2026 through 09/28/2026 from 9 am to 2 pm [2026‑158]
COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 2 of roadway widening and bridge replacement on SR‑55 (Wilson Ave.) will continue this week. Lanes will be reduced from 3 lanes to 2, with one lane in each direction throughout the project. Drivers can expect intermittent flagging for construction operations and vehicles entering and exiting the work zone.
[Dement Construction Company, LLC/Tullahoma/CNX912]
COFFEE COUNTY SR-55 [2.8-7.35] from near South Washington Street to north of HP Womack Road resurfacing: Nightly lane closures will take place from 7 PM to 6 AM for resurfacing operations. One lane in each direction will remain open at all times.
[Volunteer Highway Supply Co., Inc./Tullahoma/CN26203]
CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: Construction continues within the median of I‑40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone.
[Rogers Group, Inc./Crossville/CNZ290]
CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair: The contractor continues working on the bridge repair on I‑40 at MM 304.6 or SR‑24 at LM 0.24. The contractor has reduced SR‑24 to one lane with temporary signals. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]
CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR‑24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR‑462 and SR‑1. Initial work includes clearing activities and utility work. After that, the contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.
[Mid-State Construction Company, Inc./Crossville/CNZ206]
CUMBERLAND COUNTY SR-28 (US-127 S.) TDOT Contractor both directions from LM 10.2 to LM 13.6: Beginning 08/24/2026 during daylight hours, TDOT survey contractors will be performing work in the shoulder and near the edge of the highway with traffic control.
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Traffic has shifted from near Tabor Loop to near Grace Hill Drive. Lawson Road remains closed with a detour posted using Tabor Road. Temporary lane closures and periodic traffic stoppages may occur. Flaggers and advance warning signs will accompany closures. Motorists should use caution as traffic patterns change.
[Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY SR-28 [12.61-14.96] from near SR-392 to near US-70 resurfacing: Resurfacing continues on SR‑28 (Main Street) from SR‑392 (Miller Ave.) to near SR‑24 (Elmore Rd.). Work occurs nightly from Sunday night through Saturday morning, 7 PM to 6 AM. Temporary lane closures and flaggers will be used. Motorists should seek alternate routes as needed.
[Rogers Group, Inc./Crossville/CNZ291]
CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): Traffic has been shifted to the new alignment from LM 29.2 in Cumberland County to LM 1.87 in Fentress County. Traffic will be restricted to two lanes. Flaggers will be used intermittently. Motorists should use caution, be aware of new signs and pavement markings, and watch for construction personnel.
[Jones Bros. Contractors, LLC/Cookeville/CNV300]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor is continuing work near the intersection of SR‑26 and SR‑53. Lane closures may be used, and flaggers will be present. Motorists should be aware of construction equipment and use caution in the work zone.
[Twin K Construction/Cookeville/CNV012]
DEKALB COUNTY SR-26 [15.9-20.3] from near Old Snow Hill Road to west of Curtis Road resurfacing: The contractor will continue concrete curb work. One lane may be closed in each direction during operations. Motorists should be prepared to stop and be cautious of construction equipment adjacent to the roadway.
[Rogers Group, Inc./Cookeville/262008]
DEKALB COUNTY SR-56 (COOKEVILLE HWY.) Utility Work both directions from LM 15.38 to LM 17.32: Flagger‑assisted lane closures on SR‑56 (Cookeville Hwy.) between Craft Center Dr. and Hurricane Bridge. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 04/30/2026 through 08/28/2026 from 9 am to 2 pm [2025‑216]
FRANKLIN COUNTY SR-15 (COWAN RD.) Utility Work both directions from LM 17.10 to LM 17.11: Flagger‑assisted lane closures on SR‑15 (Bypass Rd.) at the corner of Bypass Rd. and Old Mill Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 09/30/2026 from 9 am - 2 pm [2026‑276]
FRANKLIN COUNTY SR-476 (MANSFORD RD.) Utility Work both directions from LM 1.26 to LM 1.88: Flagger‑assisted lane closures on SR‑476 (Mansford Rd.) between Wildwood Race and Old Mansford Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 08/24/2026 through 09/24/2026 from 9 am - 2 pm (2026‑595)
HAMILTON COUNTY I-24 TDOT Bridge Inspection eastbound at MM 178.5: The shoulder will be closed on the Exit 178B ramp from I‑24 Eastbound to US‑27 North from 9 AM until 2 PM on Monday, August 24th. This closure is due to a routine bridge inspection. Motorists should be alert to workers, vehicles, and equipment on the shoulder under the bridge.
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR‑153 southbound ramp to I‑75 northbound has been reduced to one lane. Traffic shifts have been implemented on I‑75 northbound and southbound, Shallowford Road entrance/exit ramps, and the Hamilton Place Mall exit ramp. On 08/24/2026 from 8 PM to 6 AM, the contractor will close the two right lanes of I‑75 SB from MM 5.5 to MM 4.6 for barrier rail installation and temporary pavement markings. Lane 4 will be closed from MM 5.2 to MM 4.8 for construction of the I‑75 SB entrance ramp from Hamilton Place Blvd. During the same time, one lane of the I‑75 NB exit ramp to Hamilton Place Blvd. will close for barrier rail removal. Weather delay date: 08/25/2026. Speed limit is reduced throughout the project limits. Nightly lane closures allowed 8 PM to 6 AM. Motorists should use caution and watch for construction personnel.
[Summers-Taylor, Inc./Chattanooga West/CNX358]
HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 14.75: THIS IS NIGHTTIME WORK. Flagger‑assisted lane closures on SR‑2 (Brainerd Rd.) between Hunt Ave. and Aiken Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/10/2026 through 08/26/2026 from 9 pm - 2 am [2026‑373]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 20.54 to LM 20.82: Flagger‑assisted lane closures on SR‑2 (Lee Hwy.) between Hunter Rd. and Artesian Cir. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/24/2026 through 08/26/2026 from 9 am - 2 pm [2026‑481]
HAMILTON COUNTY SR-2 (US-41, Broad St) [5.94-7.1] from SR-17 (Tennessee Avenue) to 21st Street resurfacing: Outside utility adjustment contract.
[APAC - Atlantic, Inc./Chattanooga East/CN26202]
HAMILTON COUNTY SR-2 [11.86-11.63] from 11.86 to 11.63 Missionary Ridge tunnel cleaning: The McCallie Tunnels will be cleaned 08/26/2026 from 8 PM to 6 AM, weather permitting. One side will be cleaned at a time, and traffic will be flagged. Motorists should expect delays.
[Diamond Specialized, Inc./Chattanooga West/CN26203]
HAMILTON COUNTY SR-317 (APISON PK.) Utility Work both directions at LM 14.13: Flagger‑assisted lane closures on SR‑317 (Apison Pike) between Howardsville Rd. and Wesleyan Rd. SW. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/13/2026 with a rain date of 08/14/2026 from 9 am - 2 pm [2026‑562]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 13.46: Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Port Royal Dr. and Berry Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/03/2026 through 08/12/2026 from 9 am - 2 pm [2025‑982]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 15.23: Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between W. Wind Dr. and Igou Ferry Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/13/2026 through 08/26/2026 from 9 am - 2 pm [2026‑295]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 17.01: Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Arrival Pt. and Igou Ferry Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/18/2026 with a rain date of 08/19/2026 from 9 am - 2 pm [2026‑567]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 8.88: THIS IS NIGHTTIME WORK. Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Eagle Dr. and Jackson Mill Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/10/2026 through 08/16/2026 from 9 pm - 6 am [2025‑1000 and 2026‑025]
HAMILTON COUNTY SR-320 [0.86-1.11] replacement of bridge over CSX railroad: Beginning 07/09/2026, the contractor will commence clearing operations on SR‑320 from LM 0.86 through LM 1.11 and will perform daily flagging operations from 7 AM to 5 PM. Motorists should use caution and watch for construction personnel.
[Dement Construction Company, LLC/Chattanooga West/CNZ267]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 0.71: Flagger‑assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between Mountainaire Dr. and E. Brainerd Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/13/2026 through 08/26/2026 from 9 am - 2 pm [2026‑456]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 1.86: Flagger‑assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between Standifer Gap and Mangate Way. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 08/19/2026 from 9 am - 2 pm [2026‑167]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions from LM 3.37 to LM 3.49: Flagger‑assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between Pine Ridge Rd. and North Valley Trail. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 08/17/2026 with a rain date of 08/18/2026 from 9 am - 2 pm [2026‑563]
HAMILTON COUNTY SR-321 [0-5.4] from Georgia State Line to Apison Pike resurfacing: The contractor will begin flagging operations on Thursday 08/20/2026. Work will occur Monday through Thursday during nighttime hours from 8 PM to 6 AM on SR‑321 between LM 0.0 and LM 5.41 both directions. Please be cautious of equipment entering and leaving the work zone.
[Wright Brothers Construction Company, Inc./Chattanooga East/CN26202]
HAMILTON COUNTY SR-58 [2.17-4.55] from SR-17 to near 21st Street West resurfacing: Beginning 08/16/2026 through 09/31/2026, the contractor will perform asphalt milling and resurfacing operations. Flagging operations are expected nightly between 8 PM and 6 AM. Motorists should use caution and watch for construction personnel.
[Wright Brothers Construction Company, Inc./Chattanooga West/CN26201]
HAMILTON COUNTY SR-8 (US-41, Main Street) [5.7-8.33] from SR-2 (Dodds Avenue) to SR-17 (Broad Street) resurfacing: Outside utility adjustment contract.
[APAC - Atlantic, Inc./Chattanooga East/CN26202]
HAMILTON COUNTY SR-8 [11.67-11.75] from 11.67 to 11.75 Stringer's Ridge tunnel cleaning: The Stringers Ridge Tunnel will be closed 08/26/2026 from 8 PM to 6 AM for cleaning. A detour will be in place during the closure. Weather permitting.
[Diamond Specialized, Inc./Maint - Chattanooga/CN26203]
HAMILTON COUNTY SR-8 [5.04-5.27] from 5.04 to 5.27 Bachmann Tubes tunnel cleaning: The Bachman Tunnel will be closed 08/27/2026 from 8 PM to 6 AM for cleaning. A detour will be in place. Weather permitting.
[Diamond Specialized, Inc./Chattanooga West/CN26203]
JACKSON COUNTY SR-290 [10.58-12.55] from SR-56 to Putnam County Line resurfacing: The contractor will intermittently perform punch list work. Lane closures may be used, with flaggers and temporary traffic control devices present. Motorists should approach with caution and be prepared to stop.
[Rogers Group, Inc./Cookeville/262029]
MARION COUNTY I-24 [17.61-21.76] resurfacing from near SR-27 (US-72) to east of SR-28: The contractor will resurface I‑24 in both directions from MM 152.2 to MM 156. Work occurs Sunday–Thursday nights from 7 PM to 6 AM. Single‑lane closures will leave one lane open in each direction. Tennessee Highway Patrol will assist with traffic control.
[Rogers Group, Inc./Dunlap/CNZ292]
MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will perform grading, drainage, and paving operations at LM 2.8. The roadway will be reduced to one lane controlled by temporary signals. Estimated completion: 08/31/2027. Please use caution.
[Wright Brothers Construction Company, Inc./Dunlap/CNZ226]
MARION COUNTY SR-2 (US-HWY. 41) Utility Work both directions from LM 28.5 to LM 31.5: THIS IS NIGHTTIME WORK. Flagger‑assisted lane closures on SR‑2 (Cummins Hwy.) between Holder Lane and Racoon Mtn. Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 08/17/2026 through 08/21/2026 from 6 pm - 8 am (132773.00)
MARION COUNTY SR-27 [2.73-4.22] from 2.73 to 4.22 resurfacing with cold in-place recycling (CIR): The contractor will be performing resurfacing operations on SR‑27 from north of SR‑56 (LM 2.7) to I‑24 (LM 4.2) in South Pittsburg. This work will require single‑lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC/Dunlap/CN26200]
MCMINN COUNTY I-75 [39-43.2] from MM 39 to MM 43.2 resurfacing: The contractor will continue pavement marking work on I‑75 between MM 39 and MM 43.2. Nightly lane closures are required from 7 PM to 6 AM Sunday night through Saturday morning. Motorists should use caution and watch for workers and equipment.
[Wright Brothers Construction Company, Inc./Cleveland/CNZ328]
MCMINN COUNTY SR-30 [0-5] from Meigs-McMinn County Line to East of County Road 166 resurfacing: The contractor will continue punch list work on SR‑30. Lane closures will be in place during working hours. Motorists should reduce speed and use caution.
[Rogers Group, Inc./Cleveland/CNZ904]
MCMINN COUNTY SR-307 [0-1.95] from SR-30 to Tellico Ave resurfacing: Beginning 06/08/2026 through 08/31/2026, the contractor will install permanent pavement markings. Expect flagging between 6 AM and 8 PM. Motorists should use caution, paying attention to signage and workers.
[Rogers Group, Inc./Chattanooga West/CN26203]
MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): The contractor will be flagging the roadway to perform work. Flagging will occur only during daytime hours.
[Whaley Construction, LLC/Chattanooga East/CNX069]
MEIGS COUNTY SR-58 [18.21-26.82] from SR-304 (River Road) to SR-68 resurfacing: Flagging operations will begin Monday 08/17/2026. Work occurs Monday–Thursday during daytime hours on SR‑58 between LM 18.21 and LM 26.82 in both directions. Motorists should be cautious of equipment entering and exiting the work zone.
[Rogers Group, Inc./Chattanooga East/CN26203]
MEIGS COUNTY SR-60 (STATE HWY. 60) Utility Work both directions from LM 1.70 to LM 1.88: Flagger‑assisted lane closures on SR‑60 (TN‑60) between Munger Pond Ln. and Roark Trail Cir. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 08/13/2026 with a rain date of 08/19/2026 from 9 am - 2 pm [2026‑479]
OVERTON COUNTY SR-111 (W. MAIN ST.) Utility Work both directions from LM 10.12 to LM 11.14: Flagger‑assisted lane closures on SR‑111 (West Main St.) between Rickman Rd. and Evans St. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 06/18/2026 through 09/18/2026 from 9 am - 2 pm [2026‑577]
OVERTON COUNTY SR-52 [0-0.33] from the Clay County Line to west of Robbins Lane resurfacing: Intermittent lane closures will occur. Flaggers will control traffic as needed. Motorists should follow signage, use caution, and watch for construction personnel.
[Asphalt Paving Systems, Inc./Livingston/CN26200]
POLK COUNTY SR-315 [0-7.16] from SR-30 to SR-315 resurfacing: The contractor will begin pavement marking work on SR‑315. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers. Motorists should use caution and reduce speed.
[Talley Construction Company, Inc./Cleveland/CN26203]
POLK COUNTY SR-68 over SR-40 the construction of bridges: The contractor will continue grading and punch list work on SR‑68 and SR‑40. Traffic is in final alignment and ramps are reopened. Temporary lane closures may be necessary for finish work. Motorists should be alert to traffic pattern changes.
[Wright Brothers Construction Company, Inc./Cleveland/CNZ042]
POLK COUNTY SR-68 [13.92-21.88] from Stansbury Road to Tennessee-Georgia State Line resurfacing: The contractor will continue resurfacing work on SR‑68. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers at times. Motorists should use caution and reduce speed.
[Talley Construction Company, Inc./Cleveland/CN26203]
PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing: Construction continues in the median of I‑40. Traffic has been shifted. Motorists should use caution and watch for construction vehicles entering/exiting the work zone.
[Rogers Group, Inc./Crossville/CNZ290]
PUTNAM COUNTY SR-135 (N. WILLOW AVE.) Utility Work both directions from LM 11.71 to LM 12.67: Flagger‑assisted lane closures on SR‑135 (N. Willow Ave.) between E. 12th St. and Shiplet Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 08/24/2026 through 09/30/2026 from 9 am - 2 pm [2026‑256]
PUTNAM COUNTY SR-136 (N. WASHINGTON AVE.) Utility Work both directions from LM 5.33 to LM 7.07: Flagger‑assisted lane closures on SR‑136 (W. Main St.) between E. 11th St. and Dale Ln. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 08/24/2026 through 09/30/2026 from 9 am - 2 pm [2026‑255]
PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: Normal construction activities continue. Temporary lane closures are possible. Flaggers will be present. Motorists should use caution and watch for roadway‑adjacent construction equipment.
[Rogers Group, Inc./Cookeville/CNV284]
PUTNAM COUNTY SR-136 [2.27-4.15] from I-40 Eastbound Ramps to SR-24 resurfacing: Nightly lane closures from 7 PM to 6 AM will continue. One lane will remain open in each direction. Flaggers will be present at side‑road intersections. Motorists should be prepared to stop.
[Vulcan Construction Materials, LLC/Cookeville/CNZ293]
PUTNAM COUNTY SR-290 [0-1.57] from Jackson County Line to near Shipley School Road resurfacing and bridge repair: The contractor will perform punch list work intermittently. Lane closures may be used, with flaggers and temporary traffic control devices present. Motorists should be cautious and prepared to stop.
[Rogers Group, Inc./Cookeville/262029]
REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: No lane closures this week. Periodic shoulder closures will occur at locations along I‑24 East and West in Marion County; I‑24 East and West in Hamilton County; I‑75 North and South in Hamilton County; I‑75 North in Bradley County; I‑75 South in McMinn County; SR‑29 South in Hamilton County; and SR‑153 North and South in Hamilton County between 8 PM and 5 AM.
[Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]
REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: Short‑term shoulder and/or lane closures may occur for SmartWay ITS maintenance. At least one travel lane will always remain open. Daytime outside shoulder closures will occur on Bradley I‑75 between MM 25 and MM 33.
[Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]
REGION 2 The on-call cable barrier repair on various Interstate and State Routes.: Shoulder closures will be used to perform cable barrier rail repair. Median shoulder closures will occur on interstates and major divided state routes. Work will take place during daylight hours Monday through Friday as needed. [LU, Inc./McMinnville/CNZ205]
REGION 2: The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: Short‑term shoulder and/or lane closures will occur for guardrail repair. Interstate work will take place nightly Sunday through Thursday from 7 PM to 6 AM. State route work will take place Monday through Friday with flaggers present. One interstate lane will remain open at all times.
[Reynolds Fence and Guardrail, Inc./McMinnville/CN26203]
REGION 2: The random on-call asphalt pothole patching on various Interstate and State Routes: Work will take place weekdays between 8 AM and 6 PM. The contractor will be patching potholes in Hamilton County on SR‑148 between LM 0.9 and LM 3.4 in both directions, and SR‑2 (Cummings Hwy.) between Browns Ferry Rd. and Broad St. in both directions. Motorists should be cautious around work vehicles and personnel.
[Pavement Restorations, Inc./Chattanooga East/CNZ279]
REGION 2: Sweeping on various Interstate and State Routes: Sweeping operations will occur throughout Region 2. Night sweeping (8 PM to 6 AM) occurs on interstates and high‑traffic routes. Daytime sweeping (9 AM to 3 PM) occurs on lower‑traffic routes. Sweeping is mobile and may impact adjacent travel lanes.
[Spears-Hopkins Paving Co., LLC/Chattanooga West/CNZ248]
SEQUATCHIE COUNTY SR-111 [4.32-7.57] resurfacing with cold in-place recycling (CIR): Resurfacing operations will occur on SR‑111 from near Lewis Chapel Rd. (LM 4.3) to near East Valley Rd. (LM 7.5). A single‑lane closure controlled by flaggers will be required. Please use caution.
[Tinsley Asphalt, LLC/Dunlap/CN26201]
WARREN COUNTY SR-55 BUS [0-3.19] from SR-55 to SR-56 resurfacing (micro surface): Lane closures with flagging operations will be required for resurfacing. Work will occur both day and night, 7 days per week. No lane closures are permitted during peak school hours (6:30–8:00 AM and 2:30–4:00 PM).
[Asphalt Paving Systems, Inc./McMinnville/CN26201]
WARREN COUNTY SR-55 [1.1-8.55] from SR-379 to east of Hallum Lane resurfacing (micro surface): Lane closures will occur for resurfacing work. Work will take place during both daytime and nighttime hours, 7 days per week as needed.
[Asphalt Paving Systems, Inc./McMinnville/CN26201]
WHITE COUNTY SR-1 [0-7.7] from Van Buren County Line to SR-111 resurfacing: The contractor will intermittently perform fog sealing, final pavement striping, and bridge repair over the Calfkiller River. One lane will be closed in each direction during these operations. Motorists should use caution and be prepared to stop.
[Asphalt Paving Systems, Inc./Cookeville/262014]
RESTRICTIONS:
CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY – CNX913
CUMBERLAND COUNTY – CNZ206: Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.
###