Roadway Activity Report for the Lower East and Upper Cumberland (June 25 - July 1, 2026)

Friday, July 10, 2026 | 01:57pm

BRADLEY COUNTY SR-2 (N. LEE HWY.) Utility Work both directions at LM 11.14:  Flagger assisted lane closures on SR- 411 (N. Lee HWY) between HWY 60 on ramp through Henderson Ave NW Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 06/18/2026 from 9am to 2pm [2026-320)

BRADLEY COUNTY SR-2 (US-HWY. 11) Utility Work both directions from LM 18.86 to LM 19.62: Flagger assisted lane closures on SR- 02 (Route 11) between Eddie Wilson Lane NW through Market St NE. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 06/11/2026 from 9am to 2pm [2026-326)

BRADLEY COUNTY SR-40 [1.1-5.1] from McKamy Street N.E. to Lyles Road resurfacing: During this reporting period, the contractor will continue pavement marking work on SR-40. Lane closures will be necessary when workers are present. Motorists should use caution and reduce speed when traveling through the work zone. [APAC - Atlantic, Inc./Cleveland/CNZ289]

BRADLEY COUNTY SR-74 (OCOEE ST. N.E.) Utility Work both directions at LM 16.28: Flagger assisted lane closures on SR-74 (N Ocoee ST) Between Blueberry Hill Rd and Blythe Ferry Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,06/04/2026 through 07/01/2026 with from 9 am - 2 pm [2025-978)

BRADLEY COUNTY SR-74 [11.445-11.83] from Whaley Road to SR-60 APD-40 drainage improvements: During this reporting period, the contractor will continue punch list work on SR-74. Intermittent flagging operations and shoulder closures will be necessary periodically. Motorists should use caution and reduce speed when traveling through the work zone. [APAC - Atlantic, Inc./Cleveland/CNZ243]

CANNON COUNTY SR-145 [0-9.67] from SR-1 (US-70S) to SR-96 micro surfacing: The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing related operations. [Asphalt Paving Systems, Inc./McMinnville/CN26200]

CANNON COUNTY SR-53 [18.21-24.08] from near Pleasant Ridge Road to Dekalb County line resurfacing: The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing related operations. [Tinsley Asphalt, LLC /McMinnville/CN26202]

CANNON COUNTY SR-64 [0-9.12] from the Coffee County Line to SR-1 (US-70S) resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing related operations. [Asphalt Paving Systems, Inc./McMinnville/CN26201]

CANNON COUNTY SR-99 [0-1.37] from the Rutherford County Line to to SR-64 resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing related operations. [Asphalt Paving Systems, Inc./McMinnville/CN26201]

CLAY COUNTY SR-52 [23.6-26.6] from near Poor House Road to Overton County Line resurfacing and bridge repair: On 06/05/2026, the contractor will began work in preparation for microsurfacing. There will be intermittent lane closures for the duration of the work. Flaggers will be used as needed to control traffic through the work zone. Motorists are encouraged to use caution, follow signage and traffic control devices, and watch for construction equipment and personnel throughout the project. [Asphalt Paving Systems, Inc./Livingston/CN26200]

CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting from the work zone. [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-1 (SPARTA HWY.) Utility Work both directions from LM 12.27 to LM 12.32: Flagging assisted lane closures on SR-1 (Sparta HWY, US-70) between Sparta Dr. and Holiday DR. Motorist should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 06/25/2026 from 9 am - 2 pm [2026-422]

CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair: The Contractor continues working on the bridge repair on I-40 at MM 304.6 or SR-24 at LM 0.24. The Contractor has reduced SR-24 to one lane with temporary signals. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR-24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR-462 and SR-1. The Contractor will be working on general clearing activities and utility work initially. Once initial work is completed, the Contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6. [Mid-State Construction Company, Inc./Crossville/CNZ206]

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. The contractor has scheduled to shift traffic from near I-40 to near Tabor Loop. The contractor has closed Lawson Road with a detour posted to utilize Tabor Road. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]

CUMBERLAND COUNTY SR-392 (MILLER AVE.) Utility Work both directions from LM 3.10 to LM 3.21:  Flagger assisted lane closures on SR-392 (Miller Ave) between Dayton Ave and West St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/11/2026 from 9 am - 2 pm [2026-328)

CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): On Wednesday 06/17/26, traffic will be shifting to the new alignment from US-127 (SR-28) LM 29.2 in Cumberland County near N. Lowe Rd. to LM 1.87 in Fentress County near Little Rd. Traffic will be restricted to two lanes. Flaggers are being used intermittently as needed to control traffic through the work zone. Motorists are encouraged to use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel throughout the project. [Jones Bros. Contractors, LLC/Cookeville/CNV300]

DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor is continuing work near the intersection of SR-26 and SR-53. During this work, lane closures may be used, and flaggers will be present to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway. [Twin K Construction/Cookeville/CNV012]

DEKALB COUNTY SR-26 (W. BROAD ST.) Utility Work both directions from LM 19.16 to LM 19.31: Flagger assisted lane closures on SR- 26 (Broad St) between Fall Creek Bridge and Smith Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 06/18/2026 from 9am to 2pm [2025-187)

DEKALB COUNTY SR-26 [15.9-20.3] from Near Old Snow Hill Road to West of Curtis Road resurfacing: The contractor will be continuing concrete curb work throughout the project. During this work, the contractor will potentially have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone, and they should be aware of construction equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/262008]

DEKALB COUNTY SR-56 (COOKVILLE HWY.) Utility Work both directions from LM 15.38 to LM 17.32: Flagger assisted lane closures on SR- 56 (Cookeville HWY) between Craft Center DR and Hurricane Bridge. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 04/30/2026 through 08/28/2026 from 9am to 2pm [2025-216)

FRANKLIN COUNTY SR-15 (COWAN RD.) Utility Work both directions from LM 3.86 to LM 20.96:  Flagger assisted lane closures on SR-15 (Cowen HWY) between Cumberland St and College St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 06/01/2026 through 06/12/2026 from 9am to 2pm [2025-817)

FRANKLIN COUNTY SR-16 (US-41A) Utility Work both directions from LM 8.45 to LM 11.78:  Flagger assisted lane closures on SR-016 (US41A) starting at Petty Lane through Peabody Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,06/29/2026 through 07/10/2026 from 9 am - 2 pm [2025-818)

FRANKLIN COUNTY SR-476 (MANSFORD RD.) Utility Work both directions from LM .04 to LM 5.05: Flagger assisted lane closures on SR-476 (Mansford RD) between Lynchburg Rd and Boswell RD. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present from 06/29/2026 through 07/10/2026 from 9am to 2pm [2025-860)

FRANKLIN COUNTY SR-50 (LYNCHBURG HWY.) Utility Work both directions from LM 6.89 to LM 7.06: Flagger assisted lane closures on SR-015 (Bypass Rd) at the Lynchburg RD and Mansford RD exchange. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,06/29/2026 through 07/10/2026 from 9 am - 2 pm [2025-859)

FRANKLIN COUNTY SR-50 (VETERANS MEMORIAL DR.) Utility Work both directions at LM 21.63:  Flagger assisted lane closures on SR-50 (Veterans Memorial Drive) at the intersection of Rutledge Ford Rd and Veterans Memorial Drive (SR-50) Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,06/01/2026 through 06/30/2026 from 9 am - 2 pm [2025-806)

FRANKLIN COUNTY SR-50 (VETERANS MEMORIAL DR.) Utility Work both directions from LM 22.52 to LM 24.34: Flagger assisted lane closures on SR-50 (Veterans Memorial Drive) at the intersection of Rutledge Ford Rd and Petty Branch Rd. (SR-50) Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,06/01/2026 through 06/30/2026 from 9 am - 2 pm [2025-998)

HAMILTON COUNTY I-24 Utility Work eastbound from MM 179 to MM 181.8: EPB will be performing utility repairs on the overhead lights on I-24 going EB in lane # 1 on the center wall on the nights of 07/13/26 and 07/14/26 from the hours of 8pm to 6am each night. STC will be the traffic control contractors.

HAMILTON COUNTY I-24 Utility Work westbound from MM 181.8 to MM 179: EPB will be performing utility repairs on the overhead lights on I-24 going WB in lane # 1 on the center wall on the nights of 07/15/26 and 07/16/26 from the hours of 8pm to 6am each night. STC will be the traffic control contractors.

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: No interstate ramp/lane closures are scheduled for this period. The contractor will have daytime shoulder closures on I-24 West from Spring Creek Road to Belvoir Avenue to perform survey work on Thursday, June 25 and Friday, June 26. This work is not expected to affect traffic. If needed the contractor may also utilize short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or repairing guardrail, attenuators, etc. [Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]

HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound and I-75 southbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps and Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman’s Jewelers and Texas Roadhouse. On 06/25/26 on I-75 NB from 8 PM until 2 AM, the contractor will close a single left lane from MM 2.4 to MM 4.8 for the installation of construction signs. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted from 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]

HAMILTON COUNTY I-75 Utility Work northbound at MM 11: EPB will be performing utility repairs on the overhead lights on I-75 going NB on the off ramp of exit 11 on the night of 07/17/26 from the hours of 8pm to 6am. STC will be the traffic control contractors.

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 15.26: Flagger assisted lane closures on SR-2 (Brainard RD.) between Greenway View Dr and Chickamauga Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/18/2026 through 06/19/2026 from 9 am - 2 pm [2026-230)

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 15.26: BRADLEY COUNTY SR-02 (N. Lee HWY) Utility Work both directions at LM 11.14: Flagger assisted lane closures on SR- 411 (N. Lee HWY) between HWY 60 on ramp through Henderson Ave NW Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 06/25/2026 from 9am to 2pm [2026-230)

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions from LM 14.32 to LM 14.45: Flagger assisted lane closures on SR-64 (Ringgold RD.) between spring creek rd. and Eastgate loop. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/26/2026 from 9 am - 2 pm [2026-362)

HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 18.80 to LM 18.86: This is nighttime work. Flagger assisted lane closures on SR-2 (Lee Hwy) between McCutcheon Rd and Elm Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/18/2026 through 06/30/206 from 9 am - 2 pm. [2024]

HAMILTON COUNTY SR-27 [5.51-7.93] from I-24 to Georgia State Line resurfacing on US-27: The contractor will have be performing a nighttime mobile operation to install roadway reflectors on 06/24/26 and 06/25/26. [APAC - Atlantic, Inc./Chattanooga East/CNZ184]

HAMILTON COUNTY SR-312 (BIRCHWOOD PK.) Utility Work both directions at LM 11.28: Flagger assisted lane closures on SR-312 (Birchwood Pike.) between Bettis Acres Drive and Brady Drive Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/25/2026 from 9 am - 2 pm with a rain date of 07/17/2026 [2026-243)

HAMILTON COUNTY SR-312 (BIRCHWOOD PK.) Utility Work both directions from LM 11.17 to LM 11.83: Flagger assisted lane closures on SR-312(Birchwood Pike.) between Sims Rd and Igou Ferry Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/16/2026 from 9 am - 2 pm with a rain date of 06/18/2026 [2026-365)

HAMILTON COUNTY SR-319 (DUPONT PKWY.) Utility Work both directions at LM 7.32: Flagger assisted lane closures on SR-319 (Dupont PKWY) near the Amnicola and 319 exchange. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/26/2026 through 07/12/2026 from 9 am - 2 pm [2026-215)

HAMILTON COUNTY SR-319 (HIXSON PK.) TDOT Contractor both directions from LM 15.2 to LM 15.5: TDOT contractors will be performing tree work and removal on SR319 Hixson Pike starting on 06/24/26. This work will last until 06/26/26 during the daytime hours. This work will require the whole road to be shut down periodically for 1-hour intervals. Detours will be in place, and traffic will be monitored during this entire event.

HAMILTON COUNTY SR-58 (HWY. 58) Utility Work both directions from LM 15.64 to LM 16.53:  Flagger assisted lane closures on SR-58 (HWY 58) between Will Dr and McDaniel Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/252026 through 06/29/2026 with a rain date of 06/30/2026 from 9 am - 2 pm [2026-388)

JACKSON COUNTY SR-290 [10.58-12.55] from SR-56 to Putnam County Line resurfacing: The contractor will be continuing asphalt resurfacing operations throughout the project limits. During this work, one lane will be closed, and flaggers and temporary traffic control devices will be in place to facilitate the flow of traffic through the work zone. Motorists should approach the work zone with caution and should be prepared to stop. [Rogers Group, Inc./Cookeville/262029]

MARION COUNTY I-24 TDOT Bridge Inspection both directions from MM 160.3 to MM 161.0: An inspection of the Holman J. Walker Bridge, which carries Interstate 24 over the Tennessee River in Marion County will continue and transition to the westbound side of the bridge on Thursday, June 25. The right lane and shoulder in the westbound direction are scheduled to be closed from 8 AM until 5 PM on Thursday, June 25. Motorists are advised to approach the bridge with caution and be prepared to merge left in advance of the work zone.

MARION COUNTY I-24 [158-158] from MM 156 to MM 158 bridge replacement: Wright Brothers have requested a lane closure to facilitate geotechnical boring work on I-24 WB in Marion County at Shellmound Road (LM 157.35). The Traffic Control Plan (TCP) has been reviewed and approved. Pending any objections, the work may be scheduled between June 23, 2026, and July 16, 2026, during the hours of 7:00 PM to 5:00 AM CST. Construction crews will stop all lane-closure activity on Thursday, July 2, and will resume on Monday, July 6. If there are any concerns about specific dates within this timeframe, please let me know, and I will remove them from consideration. RESTRICTIONS: Construction crews will stop all lane-closure activity beginning at noon on Thursday, July 2, and ending at 6:00 a.m. on Monday, July 6. [Wright Brothers Construction Company, Inc./Dunlap/DB2503]

MARION COUNTY I-24 [17.61-21.76] resurfacing from near SR-27 (US-72) to east of SR-28: The contractor will be resurfacing on I-24 in both directions from MM 152.2 to MM 156. The work will begin on 06/25/26 and will be from Sunday nights through Thursday nights from 7 PM - 6 AM each night. Single lane closures will be set up leaving one lane open to traffic during work hours. Tennessee Highway Patrol will be on site to assist with traffic control. [Rogers Group, Inc./Dunlap/CNZ292]

MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will be performing slide mitigation operations, including grading, drainage and paving on SR-108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone. [Wright Brothers Construction Company, Inc./Dunlap/CNZ226]

MARION COUNTY SR-2 [17.2-17.3] from 17.2 to 17.3 construction: The contractor will be performing grading and drainage operations on SR-2 in Marion County near LM 17.25. This work will require a lane shift for the EB traffic; the WB traffic will be unaffected. Please slow down and use caution when driving through the work zone.

[Talley Construction Company, Inc./Dunlap/CNZ244]

 

MARION COUNTY SR-283 [2.69-8.11] from 2.69 to 8.11 resurfacing with Cold In-Place Recycling (CIR): The contractor will be performing resurfacing operations on SR-283 from near SR-27 (LM 2.69) to the Sequatchie County line (LM 8.11). This work will require single lane closure controlled by flaggers. Please use caution when driving through the work zone. [Road Worx, Inc./Dunlap/CNZ188]

MCMINN COUNTY I-75 [39-43.2] from MM 39 to MM 43.2 resurfacing: During this reporting period, the contractor will continue resurfacing work on I-75 in McMinn County between MM 39 and MM 43.2. This work will require nightly lane closures from 7 PM to 6 AM Sunday night through Saturday morning. Motorists should use caution when traveling through the work zone and be aware of the presence of workers and equipment. [Wright Brothers Construction Company, Inc./Cleveland/CNZ328]

MCMINN COUNTY SR-30 [0-5] from Meigs-McMinn County Line to East of County Road 166 resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-30. Lane closures will be in place during daytime working hours. Motorists should use caution and reduce speed when traveling through the work zone. [Rogers Group, Inc./Cleveland/CNZ904]

MCMINN COUNTY SR-307 [0-1.95] from SR-30 to Tellico Ave resurfacing: Beginning 06/08/26 through 08/31/26 the contractor will commence asphalt milling operations. Expect flagging operations between the hours of 6 AM and 8 PM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Rogers Group, Inc./Chattanooga West/CN26203]

MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): During this reporting period, the contractor will be flagging the roadway to perform work. This flagging operation will only occur during daytime hours. [Whaley Construction, LLC/Chattanooga East/CNX069]

OVERTON COUNTY SR-111 (W. MAIN ST.) Utility Work both directions from LM 10.12 to LM 11.14:  Flagger assisted lane closures on SR-111 (West Main St.) between Rickman Rd and Evans St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,06/18/2026 through 09/18/2026 from 9 am - 2 pm [2026-577)

OVERTON COUNTY SR-52 [0-0.33] from the Clay County Line to west of Robbins Lane resurfacing: On 06/05/2026, the contractor will begin work in preparation for microsurfacing. There will be intermittent lane closures for the duration of the work. Flaggers will be used as needed to control traffic through the work zone. Motorists are encouraged to use caution, follow signage and traffic control devices, and watch for construction equipment and personnel throughout the project.[Asphalt Paving Systems, Inc./Livingston/CN26200]

OVERTON COUNTY SR-52 [3.37-6.5] from Near Thompson Circle to North of Cedar Lane resurfacing: On 06/05/2026, the contractor will begin work in preparation for resurfacing. There will be intermittent lane closures for the duration of the work. Flaggers will be used as needed to control traffic through the work zone. Motorists are encouraged to use caution, follow signage and traffic control devices, and watch for construction equipment and personnel throughout the project.[Rogers Group, Inc./Livingston/CNZ249]

OVERTON COUNTY SR-85 (HILHAM HWY.) Utility Work both directions from LM 5.09 to LM 5.11:  Flagger assisted lane closures on SR-85 (Hilham HWY) between Old Standing Stone Rd and Davis Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 06/11/2026 from 9 am - 2 pm [2026-265)

POLK COUNTY SR-315 (TELLICO-RELIANCE RD.) Utility Work both directions from LM .21 to LM 7.16: Flagger assisted lane closures on SR-315 (Tellico Reliance Rd) between Perry Branch Rd and Etta Mae Ln. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 04/27/2026 through 06/26/2026 from 9am to 2pm [2026-162)

POLK COUNTY SR-33 (HWY. 411) Utility Work both directions at LM 16.16: Flagging assisted lane closures on SR-33 (HWY 411 between Parksville Rd and Grove St. Motorist should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 06/25/2026 with a rain date of 06/29/2026 from 9 am - 2 pm [2026-278]

POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period, the contractor will continue construction on the SR-68 South bridge. All SR-68 traffic will use the newly constructed SR-68 North bridge while construction occurs on the new SR-68 South bridge. All SR-40/SR-68 interchange traffic will utilize the SR-68 North interchange ramps. A temporary 3-way stop has been implemented at the intersection of the SR-40 interchange ramp and SR-68. Motorists are encouraged to slow down when entering the construction zone and look out for new stop signs on SR-68 near the SR-40/SR-68 interchange. [Wright Brothers Construction Company, Inc./Cleveland/CNZ042 ]

PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing: Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting from the work zone. [Rogers Group, Inc./Crossville/CNZ290]

PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor will continue normal working activities throughout the project limits. During this work, temporary lane closures are possible, and flaggers will be present. Pigeon Roost Creek Road is closed at the intersection of SR-136 with detour signs to utilize Bunker Hill Road. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/CNV284]

PUTNAM COUNTY SR-136 [2.27-4.15] from I-40 Eastbound Ramps to SR-24 resurfacing: The contractor will be removing and pouring new sidewalk and curb ramps throughout the project. During this work, the contractor will have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone, and they should be aware of construction equipment adjacent to the roadway. [Vulcan Construction Materials, LLC/Cookeville/CNZ293]

PUTNAM COUNTY SR-290 [0-1.57] from Jackson County Line to near Shipley School Road resurfacing and bridge repair: The contractor will be continuing paving operations throughout the project limits. During this work, one lane will be closed, and flaggers and temporary traffic control devices will be in place to facilitate the flow of traffic through the work zone. Motorists should approach the work zone with caution and should be prepared to stop. [Rogers Group, Inc./Cookeville/262029]

REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: There will be periodic shoulder closures at locations on I-24 East and West in Marion Co., I-24 East and West in Hamilton Co., I-75 North and South in Hamilton Co., I-75 North in Bradley Co., I-75 South in McMinn Co., SR-29 South in Hamilton Co., and SR-153 North and South in Hamilton Co. this week 8pm - 5am. [Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]

REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. The contractor will have daytime outside shoulder closures on Bradley I-75 between MM 25 and MM 33. [Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]

REGION 2 Region 2 snowplowable marker replacement contract: The contractor will be continuing re-lensing operations from the hours of 8 PM until 6 AM. The contractor will be working in Cannon and Warren Counties, and a mobile operation will be used with an attenuator truck shadowing the work convoy. Work will take place in Bledsoe County on SR-28, SR-30, SR-101, SR-284, SR-285, SR-301, SR-443, Cannon County on SR-99, SR-145, SR-146, SR-281, Coffee County on I-24, SR-2, SR-16, SR-50, SR-53, SR-55, SR-64, SR-127, SR-130, SR-269, SR-280, Franklin County on SR-15, SR-16, SR-50, SR-56, SR-97, SR-121, SR-122, SR-127, SR-130, SR-156, SR-279, SR-433, SR-476, and Grundy County on SR-2, SR-15, I-24, SR-50, SR-56, SR-108, SR-150, SR-399. Motorists should use caution as they approach the work zones, and they should be prepared to stop as slow-moving vehicles or construction equipment is encountered. [W.L. Markers Inc./Cookeville/262001]

REGION 2 The on-call cable barrier repair on various Interstate and State Routes: The contractor will have lane closures in order to perform cable barrier rail repair. There will be nightly lane closures Monday through Thursday from 8 PM to 6 AM on 07/06/26 through 07/09/26 on I-24 MM 165.5. At least one travel lane will remain open to traffic at all times. At other locations on divided highways and interstates where cable is present, only a shoulder closure will be used in the median, and work will occur during daylight hours Monday through Friday as needed. [LU, Inc./McMinnville/CNZ205]

REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed. [Reynolds Fence and Guardrail, Inc./McMinnville/CNZ112]

REGION 2 The random on-call concrete pavement repair on various Interstate and State Routes: The contractor will perform concrete pavement repairs on I-75 NB and SB on the concrete ramps at exit 33 in Bradley County. This work will require narrowing of the ramps leaving a 10 foot minimum width. Please use cation when using these ramps. [Bluegrass Contracting Corporation/Dunlap/CNZ283]

REGION 2 The retracing of painted pavement marking lines on various routes: The contractor will be on site performing restriping of existing pavement markings in Dekalb and White Counties. During this, a mobile operation will be used with shadow vehicles and an attenuator truck to allow the contractor to safely perform the work. The contractor will be working on the following routes in White County: SR-1 from Sparta city limits to Old SR-1, SR-26 from Dekalb County line to Creekside Place, and SR-84 from SR-1 to Putnam County line. The contractor will also be performing retracing work on the following routes in Cumberland County: SR - 1 from Crossville City Limits to the Bridge over Renfro Creek. SR-282 near SR-101, SR-298 from Lake Francis Rd. to the Morgan County Line, and SR-299 from SR-1 to I-40 and SR-299 from Roane County Line to the Morgan County Line. [The Aero Mark Company, LLC/Cookeville/262002]

REGION 2 the sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high traffic state routes, while daytime sweeping can be anticipated between 9 AM to 3 PM for lower traffic state routes. [Spears-Hopkins Paving Co., LLC/Chattanooga West/CNZ248]

VANBUREN COUNTY SR-111 [14.87-19.54] from Sparta Street to White County Line microsurfacing: The contractor will have occasional lane closures during daylight hours from 6AM to 7PM for punch list related operations. [Asphalt Paving Systems, Inc./McMinnville/CNZ177]

WHITE COUNTY SR-1 [0-7.7] from Van Buren County Line to SR-111 resurfacing: The contractor will be on site to perform fog sealing work on the shoulders and to work on final pavement striping and markings. The contractor is also scheduled to start Bridge repairs over the Calfkiller River. During this work, one lane will be closed in each direction, and workers will be present on the roadway. Motorists are encouraged to use caution as they approach the work zone, and they should be prepared to stop as they may encounter slow moving traffic. [Asphalt Paving Systems, Inc./Cookeville/262014]

WHITE COUNTY SR-111 [15.25-16.25] from O'Connor Rd to Old Kentucky Rd culvert replacement: The contractor will be continuing work on installation of a box culvert. During this work, traffic will remain in one lane, and two-way traffic will be running on the southbound section of SR-111. Motorists are encouraged to use caution as they approach the work zone, and they should be prepared to stop. Motorists should also be aware of the speed limit reduction in place and follow all signs displayed. [Rogers Group, Inc./Cookeville/CNZ902]

WHITE COUNTY SR-135 [0-2.1] from SR-289 to South of SR-111 resurfacing: The contractor will begin milling operations starting 6/25/26 throughout the project limits. During this work, the contractor will have one lane closed, and temporary traffic control devices and flaggers will be on site to control the flow of traffic through the work zone. Motorists should use caution as they approach the work zone, and they should be prepared to stop. [Rogers Group, Inc./Cookeville/262015]

WHITE COUNTY SR-289 [0-2.61] from SR-1 to SR-111 resurfacing: The contractor will begin milling operations starting 6/25/26 throughout the project limits. During this work, the contractor will have one lane closed, and temporary traffic control devices and flaggers will be on site to control the flow of traffic through the work zone. Motorists should use caution as they approach the work zone, and they should be prepared to stop. [Rogers Group, Inc./Cookeville/262015]

 

RESTRICTIONS

CUMBERLAND COUNTY - CNZ206: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6.

###