Roadway Activity Report for the Lower East and Upper Cumberland (May 21-27, 2026)

Thursday, May 21, 2026 | 03:04pm

BLEDSOE COUNTY SR-30 (STATE HWY. 30) Utility Work both directions at LM 1.65: Flagger- assisted lane closures on SR-30 (HWY 30) between CC Camp Rd and Watson loop. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/21/2026 from 9 am - 2 pm [2026-285)

BRADLEY COUNTY SR-2 (S. LEE HWY.) Utility Work both directions from LM .0 to LM .10: Flagger- assisted lane closures on SR-02 (South Lee Highway) between Dance Hall Rd and Ooltewah Georgetown Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,05/07/2026 through 05/28/2026, from 9 am - 2 pm [2026-209)

BRADLEY COUNTY SR-2 (S. LEE HWY.) Utility Work both directions from LM 8.12 to LM 8.14:  Flagging-assisted lane closures on SR-02 (South Lee HWY) between Victory St. SW and Old Boyd Farm RD. SW Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 04/02/2026 through 05/13/2026 from 9 am - 2 pm [2025-930]

BRADLEY COUNTY SR-40 [1.1-5.1] from McKamy Street N.E. to Lyles Road resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-40. Lane closures will occur Sunday through Friday between the hours of 8 PM to 6 AM. Motorists should use caution and reduce speed when traveling through the work zone. [APAC - Atlantic, Inc./Cleveland/CNZ289]

BRADLEY COUNTY SR-74 (SPRING PLACE RD.) Utility Work both directions from LM 11.07 to LM 11.14: Flagging-assisted lane closures on SR-74 (Spring Place Rd) between Clayton LN and Durkee RD SE. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 12/18/25 through 06/18/2026 from 9 am - 2 pm [2025-736]

BRADLEY COUNTY SR-74 [11.445-11.83] from Whaley Road to SR-60 APD-40 drainage improvements: During this reporting period, the contractor will continue punch list work on SR-74. Intermittent flagging operations and shoulder closures will be necessary periodically. Motorists should use caution and reduce speed when traveling through the work zone.
 [APAC - Atlantic, Inc./Cleveland/CNZ243]

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes: No Region 2 Lane Closures this week on CNX913. [Davis H. Elliot Construction Company, Inc./Maint - R2/CNX913]

COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone.
 [Jones Bros. Contractors, LLC/Tullahoma/CNZ029]

COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 2 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Lanes will be reduced from 3 lanes to 2 with one lane in each direction throughout the project length. Drivers can expect intermittent flagging operations for construction operations and vehicles entering and exiting the work zone.
 [Dement Construction Company, LLC/Tullahoma/CNX912]

CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting from the work zone. [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair: The contractor continues working on the bridge repair on I-40 at MM 304.6 or SR-24 at LM 0.24. The contractor has reduced SR-24 to one lane with temporary signals. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR-24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR-462 and SR-1. The contractor will be working on general clearing activities and utility work initially. Once initial work is completed, the contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR-24 are closed from LM 15.06 to LM 15.6.
 [Mid-State Construction Company, Inc./Crossville/CNZ206]

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. The contractor has closed Fredonia Road. A detour has been posted to utilize Maynard Road. The contractor has scheduled to close Lawson Road beginning 05/26/26 with a detour posted to utilize Tabor Road. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]

CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): The contractor has shifted traffic to phase 2 on the newly constructed portions of SR-28, LM 0.90 to 1.98 in Fentress County. Work will proceed with the existing alignment of SR-28. Flaggers are being used intermittently as needed to control traffic through the work zone. Motorists are encouraged to use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel throughout the project.
 [Jones Bros. Contractors, LLC/Cookeville/CNV300]

DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor is continuing work near the intersection of SR-26 and SR-53. During this work, lane closures may be used, and flaggers will be present to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway. [Twin K Construction/Cookeville/CNV012]

DEKALB COUNTY SR-26 [15.9-20.3] from Near Old Snow Hill Road to West of Curtis Road resurfacing: The contractor will be continuing concrete curb work throughout the project. During this work, the contractor will have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone, and they should be aware of construction equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/262008]

DEKALB COUNTY SR-56 (COOKVILLE HWY.) Utility Work both directions from LM 15.38 to LM 17.32: Flagger-assisted lane closures on SR- 56 (Cookeville HWY) between Craft Center DR and Hurricane Bridge. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 04/30/2026 through 08/28/2026 from 9 am to 2 pm [2025-216)

FRANKLIN COUNTY SR-130 (OLD TULLAHOMA RD.) Utility Work both directions from LM 3.01 to LM 11.87:  Flagger-assisted lane closures on SR-130 (Old Tullahoma Rd.) between Blackburn Ln and Himes Ln. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/18/2026 through 05/29/2026 from 9 am to 2 pm [2025-812)

FRANKLIN COUNTY SR-15 (DAVID CROCKETT HWY.) Utility Work both directions from LM 4.09 to LM 8.43: Flagger-assisted lane closures on SR-15 (David Crocket Parkway) between Belvidere RD and Old Salem-Lexie Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/11/2026 through 05/15/2026 from 9 am to 2 pm [2025-811)

FRANKLIN COUNTY SR-16 (US-41A) Utility Work in both directions from LM 12.22 to LM 12.86:  Flagger-assisted lane closures on SR-16 (Dinah Shore BLVD) between Christine Hopkins Way and Porter St., motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/18/2026 through 05/29/2026 from 9 am - 2 pm [2026-195)

FRANKLIN COUNTY SR-476 (AWALT RD.) Utility Work in both directions from LM 11.83 to LM 11.87: Flagger-assisted lane closures on SR-476 (Awalt Rd) between Oakwood Ln and Awalt Rd intersection. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/18/2026 through 05/29/2026 from 9 am - 2 pm [2025-815)

FRANKLIN COUNTY SR-476 (MANSFORD RD.) Utility Work both directions from LM .04 to LM 5.05: Flagger-assisted lane closures on SR-476 (Mansford RD) between Lynchburg Rd and Boswell RD. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/18/2026 through 05/29/2026 from 9 am to 2 pm [2025-860)

FRANKLIN COUNTY SR-50 (E. MAIN ST.) Utility Work both directions from LM 11.53 to LM 12.59: Flagger-assisted lane closures on SR-50 (East Main St.) between 3rd Ave. and 12th Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/18/2026 through 05/29/2026 from 9 am to 2 pm [2026-194)

FRANKLIN COUNTY SR-50 (LYNCHBURG HWY.) Utility Work both directions from LM 6.89 to LM 7.06: Flagger-assisted lane closures on SR-50 (Lynchburg Rd) at the intersection of Mansford Rd and HWY 50. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,05/18/2026 through 05/29/2026 from 9 am - 2 pm [2025-859)

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: No interstate ramp/lane closures are scheduled for this period, but the contractor may utilize short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or repairing guardrail, attenuators, etc.
 [Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]

HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound and I-75 southbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps and Hamilton Place Mall exit ramps. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman’s Jewelers and Texas Roadhouse. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted from 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
 [Summers-Taylor, Inc./Chattanooga West/CNX358]

HAMILTON COUNTY SR-148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions from LM .97 to LM 1.05: Flagger-assisted lane closures on SR-148 (Scenic HWY.) between West Brow Rd and South Bragg Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/18/2026 through 05/21/2026, with a rain date of 05/22/2026 from 9 am - 2 pm [2025-670)

HAMILTON COUNTY SR-148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions from LM .97 to LM 1.05: Flagger-assisted lane closures on SR-148 (Scenic HWY.) between West Brow Rd and South Bragg Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/18/2026 through 05/21/2026, with a rain date of 05/22/2026 from 9 am - 2 pm [2025-670)

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 14.82: THIS IS NIGHTTIME WORK: Flagger-assisted lane closures on SR-2 (Brainard Rd.) between Greenway View Dr. and Old Mission Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/26/2026 through 06/10/2026 from 7 pm –6 am [2025-870]

HAMILTON COUNTY SR-2 (CUMMINGS HWY.) Utility Work both directions at LM 2.31: Flagger-assisted lane closures on SR-02 (Cummings Highway) between Francis St and the I-24 overpass. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/07/2026 through 06/18/2026, from 9 am - 2 pm [2026-069)

HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work in both directions from LM 18.80 to LM 18.86: This is nighttime work. Flagger-assisted lane closures on SR-2 (Lee Hwy) between McCutcheon Rd and Elm Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present, 05/18/2026 through 05/29/206 from 9 am - 2 pm. [2024-338]

HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 21.13 to LM 24.42: Flagger-assisted lane closures on SR-02 (South Lee Rd.) between Dance Hall Rd and Ooltewah Georgetown Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,05/07/2026 through 05/28/2026, with from 9 am - 2 pm [2026-209)

HAMILTON COUNTY SR-2 [11.86-11.63] from McCallie Tunnel to McCallie Tunnel Maintenance: The McCallie Tunnels will be cleaned 05/20/2026 from 8 PM to 6 AM, weather permitting. The contractor will clean one side at a time and flag traffic during the work. Motorists should expect delays. [Diamond Specialized, Inc./Chattanooga West/CNZ133]

HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 6.26: Flagger-assisted lane closures on SR-319 (Hixson Pike) between Masters Road and Middle Valley Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/21/2025 through 05/25/2026 with a rain date of 06/01/2026 from 9 am - 2 pm [2025-672)

HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work in both directions at LM 7.32: Flagger-assisted lane closures on SR-319 (Hixson Pike) near the Amnicola and 319 exchange. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/26/2026 through 06/23/2026 from 9 am - 2 pm [2026-215)

HAMILTON COUNTY SR-8 (W. MAIN ST.) Utility Work in both directions at LM 8.30:  Flagger-assisted lane closures on SR-08 (West Main St.) between Chestnut St and Market St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present,05/15/2026 from 9 am - 2 pm [2026-248)

HAMILTON COUNTY SR-8 [11.67-11.75] Stringers Ridge Tunnel Cleaning: The Stringers Ridge Tunnel will be closed 05/20/2026 from 8 PM to 6 AM for cleaning. A detour will be in effect during the closures to direct traffic to alternative routes. This work is weather permitting.
 [Diamond Specialized, Inc./Chattanooga West/CNZ133]

HAMILTON COUNTY SR-8 [5.04-5.27] Bachman Tubes Tunnel Cleaning: The Bachman Tunnel will be closed 05/21/2026 from 8 PM to 6 AM for cleaning. A detour will be in effect during the closures to direct traffic to alternative routes. This work is weather permitting.
 [Diamond Specialized, Inc./Chattanooga West/CNZ133]

JACKSON COUNTY SR-290 [10.58-12.55] from SR-56 to Putnam County Line resurfacing: The contractor will be performing cold planing operations throughout the project limits. During this work, one lane will be closed, and flaggers and temporary traffic control devices will be in place to facilitate the flow of traffic through the work zone. Motorists should approach the work zone with caution and should be prepared to stop. [Rogers Group, Inc./Cookeville/262029]

MARION COUNTY I-24 TDOT Contractor eastbound from MM 148.9 to MM 165.7: Big Woody's Tree Service will be performing mechanical tree and brush removal 05/14/26 - 05/20/26 from 7 AM to 5 PM. Big Woody's will be closing a shoulder in the eastbound direction.

MARION COUNTY I-24 TDOT Contractor westbound at MM 163.5: Big Woody's Tree Service will be performing hand-cutting tree and brush removal 05/21/26 - 05/27/26 from 7 AM to 5 PM. This will affect the westbound side only.

MARION COUNTY I-24 [137-138.2] from 137 to 138.2 Rockfall Mitigation on I-24 near MM 137: The contractor will be performing rockfall mitigation operations on I-24 WB beginning at MM 138.2 in Marion County. The middle lane, right lane, and right shoulder have been closed. 2 Lanes of traffic have been shifted to flow on the left shoulder and left lane. All lanes will be reopened to traffic by June 9, 2026. Work will continue off the road after June 9, and the project will be completed by July 31, 2026. [Summers-Taylor, Inc./Dunlap/N262018]

MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will be performing slide mitigation operations, including grading, drainage and paving on SR-108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone.
 [Wright Brothers Construction Company, Inc./Dunlap/CNZ226]

MARION COUNTY SR-150 (US-41) Utility Work both directions at LM 10.93: Flagger-assisted lane closures on SR- 150 (US HWY 41) between Mossy Oak Dr and Kilgore Town Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/12/2026 from 9 am to 2 pm with a rain date of 05/13/2026 [2026-201)

MARION COUNTY SR-2 [17.2-17.3] from 17.2 to 17.3 construction: The contractor will be performing grading and drainage operations on SR-2 in Marion County near LM 17.25. This work will require a lane shift for EB traffic, the WB traffic will be unaffected. Please slow down and use caution when driving through the work zone.
 [Talley Construction Company, Inc./Dunlap/CNZ244]

MARION COUNTY SR-283 [2.69-8.11] from 2.69 to 8.11 resurfacing with Cold In-Place Recycling (CIR): The contractor will be performing resurfacing operations on SR-283 from near SR-27 (LM 2.69) to the Sequatchie County line (LM 8.11). This work will require a single lane closure controlled by flaggers. Please use caution when driving through the work zone.
 [Road Worx, Inc./Dunlap/CNZ188]

MCMINN COUNTY SR-30 [0-5] from Meigs-McMinn County Line to East of County Road 166 resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-30. Lane closures will be in place during daytime working hours. Motorists should use caution and reduce speed when traveling through the work zone.
 [Rogers Group, Inc./Cleveland/CNZ904]

MEIGS COUNTY SR-58 (STATE HWY. 58) Utility Work both directions from LM 4.45 to LM 4.52: Flagger-assisted lane closures on SR-58 (state HWY 58) between HWY 131 and Windmill Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present on 05/14/2026 from 9 am to 2 pm with a rain date of 05/21/2026 from 9 am to 2 pm. [2026-232)

PICKETT COUNTY SR-111 (HWY. ONE ELEVEN) Utility Work both directions from LM 7.86 to LM 8.42: Flagger-assisted lane closures on SR-111 (HWY 127) between Beason RD and Hillcrest Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/26/2026 through 06/05/2026 from 9 pm to 5 am [2026-107)

POLK COUNTY SR-163 (BOWATER RD.) Utility Work both directions from LM .04 to LM .55: Flagger-assisted lane closures on SR-163 (Bowater RD) between Payne Rd and US411. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 04/30/2026 through 05/13/2026 from 9am to 2pm [2025-781)

POLK COUNTY SR-30 (HWY. 411) Utility Work both directions from LM 8.44 to LM 8.69: Flagger-assisted lane closures on SR-30 (HWY 411) between HWY 315 and Ellis Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/14/2026 through 06/05/2026 from 9 am to 2 pm [2026-127)

POLK COUNTY SR-314 [0-6.08] from SR-40 (US-64) to SR-33 (US-411) resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-314. Temporary lane closures and flagging operations will occur while work is performed. At times, traffic will be reduced to one lane. Motorists should use caution and reduce speed when traveling through the work zone.
 [Wright Brothers Construction Company, Inc./Cleveland/262011]

POLK COUNTY SR-315 (TELLICO-RELIANCE RD.) Utility Work both directions from LM .21 to LM 7.16: Flagger-assisted lane closures on SR-315 (Tellico Reliance Rd) between Perry Branch Rd and Etta Mae Ln. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 04/27/2026 through 06/26/2026 from 9 am to 2 pm [2026-162)

POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period, the contractor will continue construction on the SR-68 South bridge. All SR-68 traffic will use the newly constructed SR-68 North bridge while construction occurs on the new SR-68 South bridge. All SR-40/SR-68 interchange traffic will utilize the SR-68 North interchange ramps. A temporary 3-way stop has been implemented at the intersection of the SR-40 interchange ramp and SR-68. Motorists are encouraged to slow down when entering the construction zone and look out for new stop signs on SR-68 near the SR-40/SR-68 interchange.
 [Wright Brothers Construction Company, Inc./Cleveland/CNZ042]

PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing: Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting from the work zone. [Rogers Group, Inc./Crossville/CNZ290]

PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor will continue normal working activities throughout the project limits. During this work, temporary lane closures are possible, and flaggers will be present. Pigeon Roost Creek Road is closed at the intersection of SR-136, with detour signs to utilize Bunker Hill Road. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway.
 [Rogers Group, Inc./Cookeville/CNV284]

PUTNAM COUNTY SR-136 [2.27-4.15] from I-40 Eastbound Ramps to SR-24 resurfacing: The contractor will be removing and pouring new sidewalk and curb ramps throughout the project. During this work, the contractor will have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone, and they should be aware of construction equipment adjacent to the roadway. [Vulcan Construction Materials, LLC/Cookeville/CNZ293]

PUTNAM COUNTY SR-290 [0-1.57] from Jackson County Line to near Shipley School Road resurfacing and bridge repair: The contractor will be performing cold planing operations throughout the project limits. During this work, one lane will be closed, and flaggers and temporary traffic control devices will be in place to facilitate the flow of traffic through the work zone. Motorists should approach the work zone with caution and should be prepared to stop.
 [Rogers Group, Inc./Cookeville/262029]

REGION 2: Dynamic Message Sign (DMS) Life Cycle Replacement: No lane closures this week. There will be periodic shoulder closures at locations on I-24 East and West in Marion Co., I-24 East and West in Hamilton Co., I-75 North and South in Hamilton Co., I-75 North in Bradley Co., I-75 South in McMinn Co., SR-29 South in Hamilton Co., and SR-153 North and South in Hamilton Co. this week 8 pm – 5 am. [Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]

REGION 2: Region 2 snow-plowable marker re-lense/replacement contract: The contractor will be continuing re-lensing operations from the hours of 8 PM until 6 AM. The contractor will be working in Cannon and Warren Counties, and a mobile operation will be used with an attenuator truck shadowing the work convoy. Work will take place in Cannon County on SR-1, SR-53, SR-64, SR-96, SR-99, SR-145, SR-146, and SR-281. Work will also occur in Warren County on SR-1, SR-8, SR-30, SR-55, SR-56, SR-108, SR-127, SR-136, SR-286, SR-287, SR-288, SR-379, and SR-380. Motorists should use caution as they approach the work zones, and they should be prepared to stop as slow-moving vehicles or construction equipment is encountered.
 [W.L. Markers Inc./Cookeville/262001]

REGION 2: Drain Cleaning on various Interstate and State Routes: Drain cleaning operations are planned on I-75, SR-153 and I-24 in Hamilton County. These operations are mobile along the inside shoulders with impacts to adjacent traffic lanes and will occur at night between 8 PM and 6 AM. [Sweeping Corporation of America, Inc./Chattanooga West/CNZ286]

REGION 2: The on-call cable barrier repair on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform cable barrier rail repair. These closures will take place daily, Monday through Friday, during daylight hours on the interstates and some major divided highway state routes. There may also be nightly Sunday through Thursday from 7 PM to 6 AM, rarely and only as needed. At least one travel lane will remain open to traffic at all times. Typically, only a shoulder closure will be used in the median, but lane closures will be employed as needed. [LU, Inc./McMinnville/CNZ205]

REGION 2: The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed.
 [Reynolds Fence and Guardrail, Inc./McMinnville/CNZ112]

REGION 2: The random on-call attenuator repair on various Interstate and State Route: The on-call attenuator repair contractor will have a lane closure for attenuator repair on N. Washington St in Coffee County under the SR-269 overpass at LM 2.95. Work will occur during daylight hours from 7 AM to 5 PM on 05/21/26 with a backup date of 05/22/26 in case of inclement weather.
 [LU, Inc./McMinnville/CNZ118]

REGION 2: The random on-call concrete pavement repair on various Interstate and State Routes: The contractor will perform concrete pavement repairs on I-75 NB and SB on the concrete ramps at exit 33 in Bradley County. This work will require narrowing of the ramps, leaving a 10-foot minimum width. Please use caution when using these ramps.
 [Bluegrass Contracting Corporation/Dunlap/CNZ283]

REGION 2: The sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high traffic state routes, while daytime sweeping can be anticipated between 9 AM to 3 PM for lower traffic state routes.
 [Spears-Hopkins Paving Co., LLC/Chattanooga West/CNZ248]

SEQUATCHIE COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 2.98 to LM 3.01: Flagger-assisted lane closures on SR-08 (Taft HWY.) between Dandy Rd and Clear Brooks Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 05/21/2026 through 05/29/2026 with a rain date of 06/01/2026 through 06/12/2026 from 9 am - 2 pm [2026-322)

VAN BUREN COUNTY SR-111 [14.87-19.54] from Sparta Street to White County Line microsurfacing: The contractor will have occasional lane closures during daylight hours from 6 AM to 7 PM for microsurfacing-related operations. Additionally, lane closures on this multi-lane highway will occasionally carry through nighttime hours (24-hour lane closures) with proper signage for curing of concrete and other bridge-related setup as needed on infrequent occasions.
 [Asphalt Paving Systems, Inc./McMinnville/CNZ177]

WARREN COUNTY SR-288 (HENNESSEE BRIDGE RD.) TDOT Maintenance both directions from LM 1.88 to LM 1.90: Maintenance will be replacing a cross tile, and the road will be closed at this location. Location: SR 288 LM 1.89 Start: 05/26/26 7 AM (24/7 for 1 week) Finish: 06/02/26 Traffic control: both travel lanes will be closed at this location for the duration of this work.

WHITE COUNTY SR-1 [0-7.7] from Van Buren County Line to SR-111 resurfacing: The contractor will be continuing resurfacing operations. During this work, one lane will be closed in each direction and workers will be present on the roadway. Motorists are encouraged to use caution as they approach the work zone, and they should be prepared to stop as they may encounter slow-moving traffic. [Asphalt Paving Systems, Inc./Cookeville/262014]

WHITE COUNTY SR-111 [15.25-16.25] from O'Connor Rd to Old Kentucky Rd culvert replacement: The contractor will be continuing work on the installation of a box culvert. During this work, traffic will remain in one lane, and two-way traffic will be running on the northbound section of SR-111. Motorists are encouraged to use caution as they approach the work zone, and they should be prepared to stop. Motorists should also be aware of the speed limit reduction in place and follow all signs displayed. [Rogers Group, Inc./Cookeville/CNZ902]

 

RESTRICTIONS

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY - CNX913

CUMBERLAND COUNTY - CNZ206: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6.

###