Roadway Activity Report for the Lower East and Upper Cumberland (November 5-11, 2026)

Friday, November 06, 2026 | 10:37am

BRADLEY COUNTY SR‑40 (WATERLEVEL HWY.) Utility Work both directions from LM 3.62 to LM 3.65:
 Flagger-assisted lane closures on SR‑40 (Water Level Hwy.) between Randolph Samples Rd. and Minnis Road NE. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present from 09/30/2026 through 12/04/2026 from 9 a.m.–2 p.m. (2025‑931)

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes:
 No Region 2 lane closures this week on CNX913.
 RESTRICTIONS:
 [Davis H. Elliot Construction Company, Inc. / Maint ‑ R2 / CNX913]

CANNON COUNTY SR‑53 [18.21‑24.08] from near Pleasant Ridge Road to Dekalb County line resurfacing:
 The contractor will have lane closures with flagging operations during daylight hours from 6 a.m. to 8 p.m. for resurfacing-related operations.
 [Tinsley Asphalt, LLC / McMinnville / CN26202]

COFFEE COUNTY I‑24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving:
 Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone. Bridge demolition is scheduled to continue nightly from 7 p.m. through 6 a.m. I‑24 will be reduced to one lane and diverted across the ramps at the 117 interchange. Wattendorf Highway/AEDC Rd. will be closed at the bridge with signed detours in place. One direction of I‑24 will be affected at a time.
 RESTRICTIONS: 12' width restriction on all ramps at the Exit 117 interchange with AEDC Rd./Wattendorf Highway
 [Jones Bros. Contractors, LLC / Tullahoma / CNZ029]

COFFEE COUNTY SR‑127 [6.21‑9.76] repair of bridge over Bradley Creek:
 The contractor has CLOSED the road at the 9.76 bridge to fully remove the bridge and replace it. This closure will last until Aug. 12, 2027. A signed detour is in place. The contractor will also have lane closures with flagging operations during daylight hours as needed for bridge repair and grading-related operations as needed within the project limits.
 [Jones Bros. Contractors, LLC / McMinnville / CN26205]

COFFEE COUNTY SR‑55 construction from First Avenue (LM 2.0) to SR‑16 (US‑41A, N. Jackson St., LM 2.6) in Tullahoma:
 Phase 3 of roadway widening and bridge replacement on SR‑55 (Wilson Ave.) will continue this week. Lanes will be reduced from 3 lanes to 2, with one lane in each direction throughout the project length. Drivers can expect intermittent flagging operations for construction operations and vehicles entering and exiting the work zone.
 [Dement Construction Company, LLC / Tullahoma / CNX912]

COFFEE COUNTY SR‑55 [14.4‑15.1] from Old Bushy Branch Road to Interstate Drive bridge replacement at LM 14.77 on SR‑55 over I‑24 at Exit 111:
 As part of the SR‑55 bridge replacement project over I‑24 at Exit 111 in Coffee County, Tennessee Department of Transportation (TDOT) contract crews will perform significant construction activities requiring a full weekend closure of I‑24 and SR‑55. This work is scheduled from 9:00 p.m. Friday, November 6, 2026, through 6:00 a.m. Monday, November 9, 2026. During this period, crews will conduct the first of two planned weekend closures of I‑24 at Exit 111, with interstate traffic routed up and over the exit ramps to bypass the work zone. This closure is necessary to complete the demolition of the SR‑55 South bridge. A second weekend closure, planned for a later date, will be required to demolish the SR‑55 North bridge. SR‑55 over I‑24 will also be fully closed for the entire weekend, and a signed detour will be in place to guide drivers around the closure. This is necessary to safely perform bridge demolition and prepare the roadway for a new traffic configuration. A detailed detour map will be provided once available. While SR‑55 is closed, crews will also complete a traffic shift to support ongoing construction. When SR‑55 reopens at 6:00 a.m. Monday, traffic will resume in a new pattern: all SR‑55 South traffic will be shifted onto the SR‑55 North bridge, with one lane of travel in each direction maintained on that structure while the SR‑55 South bridge is removed and replaced. Drivers will access Manchester using Exit 110 or Exit 114. Message boards throughout the area will provide additional advance notice and direct drivers accordingly. Also, on Friday night of this reporting period in preparation for the weekend closure, the contractor will close the left lane in both directions on I‑24 starting at 7:00 p.m. and reopen by 6 a.m. on Monday.
 [Dement Construction Company, LLC / Maint ‑ R2 / PD2501]

COFFEE COUNTY SR 64 from Bedford County line to Cannon County line (LM 0.00-6.36).

The next coring operation is scheduled for Tuesday, Nov. 10th (11/10/26) on SR-64 in Coffee County from the Bedford County line to the Cannon County line (LM 0.00-6.36). There is no shoulder along this route, so there will be lane closures during operations. Nov. 12th (11/12/26) will be an inclement weather/makeup day, if needed.

CUMBERLAND COUNTY I‑40 [304.4‑306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing:
 Construction continues within the median of I‑40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone.
 [Rogers Group, Inc. / Crossville / CNZ290]

CUMBERLAND COUNTY I‑40 [328.2‑328.4] from MM 328.2 to MM 328.4 bridge repair:
 The contractor has started bridge repair work on the bridges over Main Street near Crab Orchard. This work will primarily be performed underneath I‑40 at MM 328.2. One lane of Main Street is closed during the repairs with a temporary signal directing traffic. Motorists should use caution when traveling through the work zone.
 [Capital City Construction Services, LLC / Crossville / CN26204]

CUMBERLAND COUNTY SR‑1 [5.28‑8.865] from Deep Water Road to POW Camp Road resurfacing:
 The contractor continues resurfacing activities on SR‑1 from Deep Water Road to near POW Camp Road. Temporary lane closures and flagging are expected daily from Monday through Friday. Motorists should be aware of work activities and seek an alternate route as needed.
 [Rogers Group, Inc. / Crossville / CN26204]

CUMBERLAND COUNTY SR‑24 [0‑0.16] from Putnam County Line to C189 bridge repair:
 The contractor continues working on the bridge repair on I‑40 at MM 304.6 or SR‑24 at LM 0.24. The contractor has reduced SR‑24 to one lane with temporary signals. Motorists should use caution in the area.
 [Rogers Group, Inc. / Crossville / CNZ290]

CUMBERLAND COUNTY SR‑24 [15.056‑15.56] from Crossville city limits to Seventh‑Day Adventist Church and School bridge replacement:
 The contractor has closed SR‑24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR‑462 and SR‑1. The contractor will be working on general clearing activities and utility work initially. Once initial work is completed, the contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour.
 RESTRICTIONS: Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.
 [Mid‑State Construction Company, Inc. / Crossville / CNZ206]

CUMBERLAND COUNTY SR‑28 (US‑127) bridge construction and paving from north of I‑40 (LM 17.8) to near Potato Farm Road (LM 22.7):
 The contractor continues grading activities throughout the project limits. The contractor continues paving operations in the work zone, and motorists should be mindful of additional equipment and trucks entering and exiting the work zone. Temporary lane closures and/or periodic traffic stoppages may be necessary for construction activities. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change.
 [Jones Bros. Contractors, LLC / Crossville / CNV009]

CUMBERLAND COUNTY SR‑28 [0‑9.7] from Bledsoe/Cumberland County Line to north of SR‑419 resurfacing:
 The contractor continues resurfacing activities along the project limits. Temporary lane closures with flagging are expected daily. Motorists should use caution when driving through the work zone.
 [Rogers Group, Inc. / Crossville / CN26290]

CUMBERLAND COUNTY SR‑28 [22.68‑29.2] from Potato Farm Road to N. Lowe Road widening:
 The contractor continues installing construction signs and plans to begin clearing and grading activities throughout the project limits. Temporary lane closures or flagging may be utilized with flaggers and advanced warning signs. Motorists should use caution when traveling through the project limits.
 [Charles Blalock and Sons, Inc. / Crossville / CN26205]

CUMBERLAND AND FENTRESS COUNTY SR‑28 (US‑127) widening from near N. Lowe Rd. (LM 29.2) to north of SR‑62 (LM 1.9):
 Traffic has been shifted to the new alignment from US‑127 (SR‑28) LM 29.2 in Cumberland County near N. Lowe Rd. to LM 1.87 in Fentress County near Little Rd. Intermittent lane closures and flaggers are being used as needed to control traffic through the work zone. Motorists are encouraged to use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel throughout the project.
 [Jones Bros. Contractors, LLC / Cookeville / CNV300]

DEKALB COUNTY SR‑26 (US‑70) grading, drainage, and construction of retaining walls and paving from near SR‑53 (LM 2) to near SR‑96 (LM 6.1):
 The contractor is continuing work near the intersection of SR‑26 and SR‑53. During this work, lane closures may be used, and flaggers will be present to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway.
 [Twin K Construction / Cookeville / CNV012]

DEKALB COUNTY SR‑26 [18.62 to 19.64] TDOT Survey from S. Congress Parkway to near Moog Blvd:
 On Monday, November 9th, TDOT Survey crews will have the eastbound right-hand lane closed from 9:00 AM to 4:30 PM to survey drainage structures in the roadway.

DEKALB COUNTY SR‑26 [15.9‑20.3] from Near Old Snow Hill Road to West of Curtis Road resurfacing:
 The contractor continues paving operations throughout the project limits. During this work, the contractor will have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone, and they should be aware of construction equipment adjacent to the roadway.
 [Rogers Group, Inc. / Cookeville / 262008]

FRANKLIN COUNTY SR‑130 (OLD TULLAHOMA RD.) Utility Work both directions from LM 11.87 to LM 11.89:
 Flagger-assisted lane closures on SR‑130 (Old Tullahoma Rd.) between Audubon Rd. and Bible Crossing Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/20/2026 through 11/20/2026 from 9 a.m. to 2 p.m. (2026‑733)

FRANKLIN COUNTY SR‑15 (COWAN RD.) Utility Work both directions from LM 20.43 to LM 20.72:
 Flagger-assisted lane closures on SR‑15 (Cowan Rd.) between Rogers Street and Jackson Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/02/2026 through 12/02/2026 from 9 a.m.–2 p.m. (2026‑734)

FRANKLIN COUNTY SR‑15 [8.54‑13.12] from Belvidere Lane to Veterans Memorial Drive resurfacing:
 There will be daily lane closures for resurfacing activities. One lane in each direction will be maintained at all times.
 [Tinsley Asphalt, LLC / Tullahoma / CN26205]

GRUNDY COUNTY I‑24 TDOT Maintenance westbound from MM 133.8 to MM 132:
 TDOT maintenance will shut down the I‑24 WB shoulder for unpaved shoulder repairs. Activity Code 427 – Patching unpaved surface just off the paved interstate shoulder. Date: Monday 11/09/2026 and Tuesday 11/10/2026. Time: each day from 9 a.m. to 3:30 p.m.

GRUNDY COUNTY SR‑2 (US‑41) Utility Work both directions from LM 5.29 to LM 5.69:
 Flagger-assisted lane closures on SR‑02 (US‑41 Hwy.) between Bells Cove and West Main St. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 09/15/2026 through 11/17/2026 from 9 a.m.–2 p.m. [2026‑520]

GRUNDY COUNTY SR‑399 [0‑4.78] resurfacing from SR‑108 (LM 0) to the Sequatchie County line (LM 4.8):
 The contractor will be performing project closeout activities in Grundy County on SR‑399 from SR‑108 to the Sequatchie County line. This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
 [Asphalt Paving Systems, Inc. / Dunlap / CN26202]

GRUNDY COUNTY SR‑50 [13.23‑17.74] from Hideaway Cabin Road to SR‑56 resurfacing:
 There will be daily flagging operations for resurfacing activities.
 [Rogers Group, Inc. / Tullahoma / CN26204]

HAMILTON COUNTY I‑75 at the Hamilton Place Mall interchange:
 The SR‑153 southbound ramp to I‑75 northbound has been reduced to one lane. Traffic shifts have been implemented on I‑75 northbound and I‑75 southbound, Shallowford Road entrance ramps, Shallowford Road exit ramps, and the Hamilton Place Mall exit ramp. The speed limit has been reduced on I‑75 throughout the project limits. Nightly lane closures are permitted 8 p.m. to 6 a.m. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
 [Summers‑Taylor, Inc. / Chattanooga West / CNX358]

HAMILTON COUNTY SR‑148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions from LM 1.19 to LM 1.43:
 Flagger-assisted lane closures on SR‑148 (Scenic Hwy.) between Crandell Ave. and Stonedge Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 10/05/2026 through 01/31/2027 from 9 a.m.–2 p.m. [2026‑540]

HAMILTON COUNTY SR‑17 (ST. ELMO AVE.) Utility Work both directions at LM 1.18:
 Flagger-assisted lane closures on SR‑17 (St. Elmo Ave.) between 45th St. and 44th St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/05/2026 through 11/13/2026 from 9 a.m.–2 p.m. (2026‑696)

HAMILTON COUNTY SR‑17 (ST. ELMO AVE.) Utility Work both directions from LM .12 to LM .60:
 Flagger-assisted lane closures on SR‑17 (St. Elmo Ave.) between 57th St. and 56th St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/15/2026 through 12/18/2026 from 9 a.m.–2 p.m. (2026‑693)

HAMILTON COUNTY SR‑2 (BRAINERD RD.) Utility Work both directions from LM 14.07 to LM 14.22:
 Flagger-assisted lane closures on SR‑02 (Brainerd Rd.) between Howell Ave. and Pisgah Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 11/04/2026 through 12/7/2026 from 9 a.m.–2 p.m. [2026‑078]

HAMILTON COUNTY SR‑2 [0‑2.74] (US‑41, US‑64, US‑74) from 0.00 to 2.74 resurfacing:
 Beginning 10/12/2026 through 11/15/2026 on SR‑2 from LM 0.00 to LM 2.74, the contractor will be flagging for asphalt milling and paving operations from 7 a.m. until 6 p.m.
 [APAC - Atlantic, Inc. / Maint - Chattanooga / CN26204]

HAMILTON COUNTY SR‑2 [11.86‑11.63] from 11.86 to 11.63 Missionary Ridge tunnel cleaning:
 The McCallie Tunnels will be cleaned 11/18/2026 from 8 p.m. to 6 a.m., weather permitting. The contractor will clean one side at a time and flag traffic during the work. Motorists should expect delays.
 [Diamond Specialized, Inc. / Chattanooga West / CN26203]

HAMILTON COUNTY SR‑27 (SUCK CREEK RD.) Utility Work both directions from LM 2.89 to LM 4.00:
 Flagger-assisted lane closures on SR‑27 (Suck Creek Rd.) between the Signal Mountain Sewerage Plant and Southview St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/19/2026 through 12/4/2026 from 9 a.m.–2 p.m. (2026‑704)

HAMILTON COUNTY SR‑319 (HIXSON PK.) Utility Work both directions from LM 9.54 to LM 10.20:
 Flagger-assisted lane closures on SR‑319 (Hixson Pike) from Thrasher Pike to Bremer Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 11/05/2026 through 11/10/2026 from 9 a.m.–2 p.m. [2026‑776]

HAMILTON COUNTY SR‑320 [0.86‑1.11] replacement of bridge over CSX railroad:
 The contractor is performing utility pole and overhead line relocation on SR‑320 from LM 0.86 through LM 1.11 and will perform daily flagging operations from 7 a.m. to 5 p.m. SR‑320 will be closed for the installation of storm drainage from Benham Drive to Vance Rd. 11/07/2026 at 5 a.m. to 11/08/2026 at 8 p.m. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
 [Dement Construction Company, LLC / Chattanooga West / CNZ267]

HAMILTON COUNTY SR‑321 (OOLTEWAH‑RINGGOLD RD.) Utility Work both directions at LM 2.83:
 Flagger-assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between Cobblestone Hill Dr. and Imperial Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 11/02/2026 through 11/06/2026 from 9 a.m.–2 p.m. [2026‑432]

HAMILTON COUNTY SR‑58 (HWY. 58) Utility Work both directions from LM 17.95 to LM 18.74:
 Flagger-assisted lane closures on SR‑58 (Hwy. 58) between Coolidge Lane and Monger Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 10/29/2026 through 11/05/2026 from 9 a.m.–2 p.m. [2026‑694]

HAMILTON COUNTY SR‑8 (CHEROKEE BLVD.) Utility Work both directions from LM 10.44 to LM 10.49:
 Flagger-assisted lane closures on SR‑08 (Cherokee Blvd.) between Chilhowie St. and Minor St. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 11/09/2026 through 11/12/2026 from 9 a.m.–2 p.m. [2026‑774]

HAMILTON COUNTY SR‑8 (SIGNAL MOUNTAIN RD.) Utility Work both directions from LM 12.99 to LM 13.96:
 Flagger-assisted lane closures on SR‑08 (Signal Mountain Rd.) between Runyan Dr. and Glendale Dr. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/19/2026 through 12/4/2026 from 9 a.m.–2 p.m. (2026‑705)

HAMILTON COUNTY SR‑8 [11.67‑11.75] from 11.67 to 11.75 Stringer's Ridge tunnel cleaning:
 The Stringer's Ridge Tunnel will be closed 11/18/2026 from 8 p.m. to 6 a.m. for cleaning. A detour will be in effect during the closure to direct traffic to alternative routes. This work is weather permitting.
 [Diamond Specialized, Inc. / Maint - Chattanooga / CN26203]

HAMILTON COUNTY SR‑8 [5.04‑5.27] from 5.04 to 5.27 Bachmann Tubes tunnel cleaning:
 The Bachman Tunnel will be closed 11/19/2026 from 8 p.m. to 6 a.m. for cleaning. A detour will be in effect during the closure to direct traffic to alternative routes. This work is weather permitting.
 [Diamond Specialized, Inc. / Chattanooga West / CN26203]

MARION COUNTY I‑24 TDOT Contractor westbound from MM 140.5 to MM 135:
 Big Woody's will be clearing vegetation from around CCTV cameras on I‑24 westbound from MM 140.5 to MM 135. The work will be performed from 11/09/2026 through 11/24/2026 from 7 a.m.–5 p.m. 11/10/2026 will require a lane closure for the fast lane at LM 140.5; each day after will be inside and outside shoulder closures. Traffic control provided by Davis Elliot Construction.

MARION COUNTY I‑24 TDOT Maintenance eastbound at MM 134.3:
 11/09/2026, 7 a.m.–5 p.m. Exit 134 off-ramp from I‑24 eastbound to SR‑15 will be closed for vegetation removal work. The contractor will have equipment on the off-ramp for removing vegetation from CCTV cameras. No traffic will be allowed to exit I‑24 eastbound at Exit 134.

MARION COUNTY I‑24 [17.61‑21.76] resurfacing from near SR‑27 (US‑72) to east of SR‑28:
 The contractor will be performing project closeout activities. This work will require intermittent single-lane closures, leaving one lane open to traffic. This work will occur on I‑24 in both directions from MM 152.2 to MM 156 and will be performed from Sunday nights through Thursday nights from 7 p.m.–6 a.m. each night. Tennessee Highway Patrol will be on site to assist with traffic control.
 [Rogers Group, Inc. / Dunlap / CNZ292]

MARION COUNTY SR‑108 [2.8‑3.24] slide mitigation:
 The contractor will be performing slide mitigation operations, including grading, drainage, and paving on SR‑108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone.
 [Wright Brothers Construction Company, Inc. / Dunlap / CNZ226]

MARION COUNTY SR‑27 (US‑HWY. 72) TDOT Contractor westbound at LM 21.2:
 Soil-nailing operations by GSI will require closure of the westbound lane beginning 11/02/2026 until 12/14/2026 on SR‑27 at LM 21.2. Temporary traffic signals will be in place.

MCMINN COUNTY SR‑30 [19.69‑22.88] from SR‑33 Tennessee Ave. to CR‑890 resurfacing:
 During this reporting period, the contractor will continue traffic signal work on SR‑30 (US‑411). Lane closures will be necessary when workers are present. Motorists should use caution and reduce speed when traveling through the work zone.
 [Rogers Group, Inc. / Cleveland / CN26205]

MCMINN COUNTY SR‑39 [7.56‑7.628] from Old Riceville Road to Avalon Street intersection improvements:
 During this reporting period, the contractor will be installing a new traffic signal pole and surrounding concrete island at the intersection of SR‑39 and Old Riceville Road. Traffic turning from SR‑39 to Old Riceville Road will be restricted to passenger vehicles only. Larger vehicles should use Dennis Street as a detour. Additional intermittent lane closures may be necessary periodically on SR‑39 while work is performed at the intersection.
 [Stansell Electric Company, Inc. / Cleveland / 1285111]

OVERTON COUNTY SR‑52 (JAMESTOWN HWY.) Utility Work both directions from LM 20.36 to LM 24.62:
 Flagger-assisted lane closures on SR‑52 (Jamestown Hwy.) between Red Rose Lane and Bolestown Cemetery Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 10/18/2026 through 12/18/2026 from 9 a.m.–2 p.m. [2025‑742]

POLK COUNTY SR‑68 [13.92‑21.88] from Stansbury Road to Tennessee‑Georgia State Line resurfacing:
 During this reporting period, the contractor will continue resurfacing work on SR‑68. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers at times while work is performed. Motorists should use caution and reduce speed when traveling through the work zone.
 [Talley Construction Company, Inc. / Cleveland / CN26203]

PUTNAM COUNTY I‑40 [303.6‑304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing:
 Construction continues within the median of I‑40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone.
 [Rogers Group, Inc. / Crossville / CNZ290]

PUTNAM COUNTY SR‑136 construction from north of the SR‑111 interchange to south of the I‑40 interchange:
 The contractor will be on site performing punch-list operations. During this work, temporary lane closures are possible, and flaggers will be present to direct the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway.
 [Rogers Group, Inc. / Cookeville / CNV284]

PUTNAM COUNTY SR‑291 (BLOOMINGTON SPRINGS HWY.) Utility Work both directions from LM 0.00 to LM 1.97:
 Flagger-assisted lane closures on SR‑291 (Bloomington Rd.) between SR‑24 and SR‑56. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/05/2026 through 12/18/2026 from 9 a.m.–2 p.m. [2026‑450]

PUTNAM COUNTY SR‑56 (GAINESBORO HWY.) Utility Work both directions from LM 3.74 to LM 5.90:
 Flagger-assisted lane closures on SR‑56 (Gainesboro Hwy.) between Hulon Ferrell Rd. and Old Gainesboro Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/05/2026 through 12/18/2026 from 9 a.m.–2 p.m. [2026‑452]

PUTNAM COUNTY SR‑84 (CALFKILLER HWY.) Utility Work both directions from LM 1.0 to LM 8.0:
 Flagger-assisted lane closures on SR‑84 (Calfkiller Hwy.) from the White County line to Hidden Acres Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 09/27/2026 through 01/02/2027 from 8 a.m.–3 p.m. [2023‑577]

REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement:
 No lane closures on CNX413 this week, unless necessary for unscheduled maintenance.
 [Davis H. Elliot Construction Company, Inc. / Chattanooga East / CNX413]

REGION 2 The on-call cable barrier repair on various Interstate and State Routes.:
 The contractor will have shoulder closures in order to perform cable barrier rail repair. A shoulder closure will be used in the median of interstates and major divided state routes, and work will occur during daylight hours Monday through Friday as needed.
 [LU, Inc. / McMinnville / CNZ205]

REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes:
 The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate and high-speed divided state routes nightly Sunday through Thursday from 7 p.m. to 6 a.m. and daily Monday through Saturday on state routes. At least one travel lane will remain open to traffic in each direction at all times on the interstate, and flaggers will be present on state routes during any work that is performed.
 [Reynolds Fence and Guardrail, Inc. / McMinnville / CN26203]

REGION 2 the sweeping on various Interstate and State Routes:
 Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 p.m. and 6 a.m. for interstates and high-traffic state routes, while daytime sweeping can be anticipated between 9 a.m. and 3 p.m. for lower-traffic state routes.
 [Spears-Hopkins Paving Co., LLC / Chattanooga West / CNZ248]

SEQUATCHIE COUNTY SR‑111 [4.32‑7.57] resurfacing with cold in-place recycling (CIR):
 The contractor will be performing project closeout activities on SR‑111 from near Lewis Chapel Road (LM 4.3) to near East Valley Road (7.5) in Sequatchie County. This work will require intermittent single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
 [Tinsley Asphalt, LLC / Dunlap / CN26201]

SEQUATCHIE COUNTY SR‑28 [0‑4] (US‑127) from the Marion County line to Wilson Road:
 The contractor will be performing project closeout activities on SR‑28 from the Marion County line to east of Wilson Road. This work will require intermittent single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
 [Rogers Group, Inc. / Dunlap / CN26205]

SEQUATCHIE COUNTY SR‑399 [0‑5.9] resurfacing from the Grundy County line (LM 0) to near SR‑111 (LM 5.9):
 The contractor will be performing project closeout activities in Sequatchie County on SR‑399 from the Grundy County line to near SR‑111. This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
 [Asphalt Paving Systems, Inc. / Dunlap / CN26202]

SEQUATCHIE COUNTY SR‑8 [22.73‑27.42] from south of Whitlow Road (LM 22.7) to north of Sherman Road (LM 27.4):
 The contractor will be performing project closeout activities on SR‑8 in both directions from near Whitlow Road to near Sherman Road. This work will require lane closures controlled by flaggers. Please use caution when driving through the work zone.
 [Tinsley Asphalt, LLC / Dunlap / CN26205]

WARREN COUNTY SR‑55 BUS [0‑3.19] from SR‑55 to SR‑56 resurfacing (micro surface):
 The contractor will have lane closures with flagging operations for resurfacing-related operations. Work will be occurring in both daytime and nighttime hours, 7 days per week as needed. However, no lane closures are permitted during peak hours from 6:30 a.m. to 8:00 a.m. and from 2:30 p.m. to 4:00 p.m. on days that school is in session.
 [Asphalt Paving Systems, Inc. / McMinnville / CN26201]

WARREN COUNTY SR‑55 [1.1‑8.55] from SR‑379 to east of Hallum Lane resurfacing (micro surface):
 The contractor will have lane closures for resurfacing-related operations. Work will be occurring in both daytime and nighttime hours, 7 days per week as needed.
 [Asphalt Paving Systems, Inc. / McMinnville / CN26201]

WHITE COUNTY SR‑1 (CROSSVILLE HWY.) Utility Work both directions at LM 13.69:
 Flagger-assisted lane closures on SR‑001 (Crossville Hwy.) after Old US Hwy. 70 and right by Old Bonar Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/10/2026 through 11/11/2026 from 9 a.m.–2 p.m. [2026‑755]

RESTRICTIONS:

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY – CNX913:

COFFEE COUNTY – CNZ029:
 12' width restriction on all ramps at the Exit 117 interchange with AEDC Rd./Wattendorf Highway.

CUMBERLAND COUNTY – CNZ206:
 Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.

###