Roadway Activity Report for the Lower East and Upper Cumberland (November 19-25, 2026)
BRADLEY COUNTY SR-40 (WATERLEVEL HWY.) Utility Work both directions from LM 3.62 to LM 3.65:
Flagger-assisted lane closures on SR-40 (Waterlevel Hwy.) between Randolph Samples Rd. and Minnis Road NE. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present from 09/30/2026 through 12/04/2026 from 9 a.m. to 2 p.m. (2025-931)
BRADLEY COUNTY SR-74 (SPRING PLACE RD.) Utility Work both directions at LM 11.36:
Flagging-assisted lane closures on SR-74 Spring Place Rd., S.E., between Pell Street and Whaley Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/19/2026 through 11/20/2026 from 9 a.m. to 2 p.m. [2026-703]
CANNON COUNTY SR-53 [18.21-24.08] from near Pleasant Ridge Road to DeKalb County line resurfacing:
The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing-related operations.
[Tinsley Asphalt, LLC /McMinnville/CN26202]
COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving:
Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone. Bridge demolition is scheduled to continue nightly from 7 PM through 6 AM. I-24 will be reduced to one lane and diverted across the ramps at the 117 interchange. Wattendorf Highway/AEDC Rd. will be closed at the bridge with signed detours in place. One direction of I-24 will be affected at a time. RESTRICTIONS: 12' width restriction on all ramps at the Exit 117 interchange with AEDC Rd./Wattendorf Highway.
[Jones Bros. Contractors, LLC/Tullahoma/CNZ029]
COFFEE COUNTY SR-127 [6.21-9.76] repair of bridge over Bradley Creek:
The contractor has CLOSED the road at the 9.76 bridge to fully remove the bridge and replace it. This closure will last until Aug. 12, 2027. A signed detour is in place. The contractor will also have lane closures with flagging operations during daylight hours as needed for bridge repair and grading-related operations within the project limits.
[Jones Bros. Contractors, LLC/McMinnville/CN26205]
COFFEE COUNTY SR-280 (MCBRIDE BRANCH RD.) Utility Work both directions from LM 0.00 to LM 3.65:
Flagger-assisted lane closures on SR-280 (McBride’s Branch Rd.) between State Route 2 and Paul Harrell Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/12/2026 through 12/18/2026 from 8 a.m. to 4:30 p.m. [2026-400)
COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma:
Phase 3 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Lanes will be reduced from 3 lanes to 2, with one lane in each direction throughout the project length. Drivers can expect intermittent flagging operations for construction operations and vehicles entering and exiting the work zone.
[Dement Construction Company, LLC/Tullahoma/CNX912]
COFFEE COUNTY SR-55 [14.4-15.1] from Old Bushy Branch Road to Interstate Drive bridge replacement at LM 14.77 on SR-55 over I-24 at Exit 111:
All SR-55 traffic is shifted onto the SR-55 North bridge, with one lane of travel in each direction maintained on that structure while the SR-55 South bridge is removed and replaced. Exit 111A on I-24 EB will be closed during this phase of construction as well, with all EB traffic utilizing Exit 111B to access both SR-55 NB and SB (towards McMinnville and Manchester).
[Dement Construction Company, LLC/Maint - R2/PD2501]
CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing:
Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone.
[Rogers Group, Inc./Crossville/CNZ290]
CUMBERLAND COUNTY I-40 [328.2-328.4] from MM 328.2 to MM 328.4 bridge repair:
The contractor has started bridge repair work on the bridges over Main Street near Crab Orchard. This work will primarily be performed underneath I-40 at MM 328.2. One lane of Main Street is closed during the repairs with a temporary signal directing traffic. Motorists should use caution when traveling through the work zone.
[Capital City Construction Services, LLC/Crossville/CN26204]
CUMBERLAND COUNTY SR-1 [5.28-8.865] from Deep Water Road to POW Camp Road resurfacing:
The contractor continues resurfacing activities on SR-1 from Deep Water Road to near POW Camp Road. Temporary lane closures and flagging are expected daily from Monday through Friday. Motorists should be aware of work activities and seek an alternate route as needed.
[Rogers Group, Inc./Crossville/CN26204]
CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair:
The contractor continues working on the bridge repair on I-40 at MM 304.6 or SR-24 at LM 0.24. The contractor has reduced SR-24 to one lane with temporary signals. Motorists should use caution in the area.
[Rogers Group, Inc./Crossville/CNZ290]
CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement:
The contractor has closed SR-24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR-462 and SR-1. The contractor will be working on general clearing activities and utility work initially. Once initial work is completed, the contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6.
[Mid-State Construction Company, Inc./Crossville/CNZ206]
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7):
The contractor continues grading activities throughout the project limits. The contractor continues paving operations in the work zone, and motorists should be mindful of additional equipment and trucks entering and exiting the work zone. Temporary lane closures and/or periodic traffic stoppages may be necessary for construction activities. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change.
[Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY SR-28 [0-9.7] from Bledsoe-Cumberland County Line to north of SR-419 resurfacing:
The contractor continues resurfacing activities along the project limits. Temporary lane closures with flagging are expected daily. Motorists should use caution when driving through the work zone.
[Rogers Group, Inc./Crossville/CN26290]
CUMBERLAND COUNTY SR-28 [22.68-29.2] from Potato Farm Road to N. Lowe Road widening:
The contractor continues installing construction signs and plans to begin clearing and grading activities throughout the project limits. Temporary lane closures or flagging may be utilized with flaggers and advanced warning signs. Motorists should use caution when traveling through the project limits.
[Charles Blalock and Sons, Inc./Crossville/CN26205]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1):
The contractor is continuing work near the intersection of SR-26 and SR-53. During this work, lane closures may be used, and flaggers will be present to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway.
[Twin K Construction/Cookeville/CNV012]
DEKALB COUNTY SR-26 [15.9-20.3] from Near Old Snow Hill Road to West of Curtis Road resurfacing:
The contractor continues paving operations throughout the project limits. During this work, the contractor will have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone, and they should be aware of construction equipment adjacent to the roadway.
[Rogers Group, Inc./Cookeville/262008]
FRANKLIN COUNTY SR-130 (OLD TULLAHOMA RD.) Utility Work both directions from LM 11.87 to LM 11.89:
Flagging-assisted lane closures on SR-130 (Old Tullahoma Rd.) between Audubon Rd. and Bible Crossing Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present from 10/20/2026 through 11/20/2026 from 9 a.m. to 2 p.m. (2026-733)
FRANKLIN COUNTY SR-15 (COWAN RD.) Utility Work both directions from LM 20.43 to LM 20.72:
Flagging-assisted lane closures on SR-15 (Cowan Rd.) between Rogers Street and Jackson Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/02/2026 through 12/02/2026 from 9 a.m. to 2 p.m. (2026-734)
FRANKLIN COUNTY SR-15 [8.54-13.12] from Belvidere Lane to Veterans Memorial Drive resurfacing:
There will be daily lane closures for resurfacing activities. One lane in each direction will be maintained at all times.
[Tinsley Asphalt, LLC /Tullahoma/CN26205]
GRUNDY COUNTY SR-2 (US-41) Utility Work both directions from LM 5.29 to LM 5.69:
Flagger-assisted lane closures on SR-02 (US-41 Hwy.) between Bells Cove and West Main St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/15/2026 through 11/17/2026 from 9 a.m. to 2 p.m. [2026-520)
GRUNDY COUNTY SR-399 [0-4.78] resurfacing from SR-108 (LM 0) to the Sequatchie County line (LM 4.8):
The contractor will be performing project closeout activities in Grundy County on SR-399 from SR-108 to the Sequatchie County line. This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Asphalt Paving Systems, Inc./Dunlap/CN26202]
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange:
The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound and I-75 southbound, Shallowford Road entrance ramps, Shallowford Road exit ramps, and the Hamilton Place Mall exit ramp. The speed limit has been reduced on I-75 throughout the project limits. On 11/22/26 the contractor will close 2 right lanes on I-75 SB from MM 7.0 to MM 5.6 from 8 PM to 6 AM and will have rolling roadblocks in this area as needed from 9 PM to 6 AM for overhead sign erection. On 11/23/26 the contractor will close 2 right lanes on I-75 SB from MM 7.0 to MM 5.6 from 8 PM to 6 AM and will have rolling roadblocks in this area as needed from 9 PM to 6 AM for overhead sign erection. I-75 SB Exit Ramp to Shallowford Road will be closed on 11/23/26 from 8 PM until 6 AM for overhead sign erection. On 11/24/26 the contractor will close 2 right lanes on I-75 NB from MM 4.0 to MM 5.0 from 8 PM to 6 AM and will have rolling roadblocks in this area as needed from 9 PM to 6 AM for overhead sign erection. On 11/24/26 the contractor will close 1 left lane on I-75 SB from MM 5.2 to MM 4.8 from 8 PM to 6 AM for overhead sign erection. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
[Summers-Taylor, Inc./Chattanooga West/CNX358]
HAMILTON COUNTY SR-148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions from LM 1.19 to LM 1.43:
Flagger-assisted lane closures on SR-148 (Scenic Hwy.) between Crandell Ave. and Stonedge Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 10/05/2026 through 01/31/2027 from 9 a.m. to 2 p.m. [2026-540)
HAMILTON COUNTY SR-148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions from LM 1.19 to LM 1.43:
Flagger-assisted lane closures on SR-148 (Scenic Hwy.) between Crandell Ave. and Stonedge Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 10/05/2026 through 01/31/2027 from 9 a.m. to 2 p.m. [2026-540)
HAMILTON COUNTY SR-17 (ST. ELMO AVE.) Utility Work both directions at LM .38:
Flagging-assisted lane closures on SR-17 (St. Elmo Ave.) between 55th St. and 54th St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/16/2026 through 11/24/2026 from 9 a.m. to 2 p.m. (2026-697)
HAMILTON COUNTY SR-17 (ST. ELMO AVE.) Utility Work both directions from LM .12 to LM .60:
Flagging-assisted lane closures on SR-17 (St. Elmo Ave.) between 57th St. and 56th St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/15/2026 through 12/18/2026 from 9 a.m. to 2 p.m. (2026-693)
HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions from LM 14.07 to LM 14.22:
Flagger-assisted lane closures on SR-02 (Brainerd Rd.) between Howell Ave. and Pisgah Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/04/2026 through 120/7/2026 from 9 a.m. to 2 p.m. [2026-078)
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 18.80 to LM 18.86:
Flagger-assisted lane closures on SR-2 (Lee Hwy.) between St. Stephens Place and Robin Drive. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/17/2026 through 11/20/2026 from 9 a.m. to 2 p.m. [2024-338]
HAMILTON COUNTY SR-2 [11.86-11.63] from 11.86 to 11.63 Missionary Ridge tunnel cleaning:
The McCallie Tunnels will be cleaned 11/18/2026 from 8 PM to 6 AM, weather permitting. The contractor will clean one side at a time and flag traffic during the work. Motorists should expect delays.
[Diamond Specialized, Inc./Chattanooga West/CN26203]
HAMILTON COUNTY SR-27 (SUCK CREEK RD.) Utility Work both directions from LM 2.89 to LM 4.00:
Flagging-assisted lane closures on SR-27, Suck Creek Rd., between the Signal Mountain Sewerage Plant and Southview St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/19/2026 through 12/4/2026 from 9 a.m. to 2 p.m. (2026-704)
HAMILTON COUNTY SR-320 [0.86-1.11] replacement of bridge over CSX railroad:
The contractor is performing utility pole and overhead line relocation on SR-320 from LM 0.86 through LM 1.11 and will perform daily flagging operations from 7 AM to 5 PM. Flagging operations will also be performed for storm drainage installation near the intersection of Benham Drive from 7 AM to 5 PM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
[Dement Construction Company, LLC/Chattanooga West/CNZ267]
HAMILTON COUNTY SR-321 (MAIN ST.) Utility Work both directions from LM 3.01 to LM 3.20:
Flagging-assisted lane closures on SR-321 (E. Main St.) between 23rd St. and S. Kelly St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 11/20/2026 with a rain date of 11/23/2026 from 9 a.m. to 2 p.m. (2026-751)
HAMILTON COUNTY SR-8 (MARKET ST.) TDOT Bridge Inspection southbound at LM 9.68:
A routine inspection of Market Street Bridge will result in lane and sidewalk closures in each direction on November 18 and 19 from 8 a.m. until 5 p.m. daily. Drivers are advised to approach the bridge with caution, be aware of the presence of workers on the bridge, be alert to the temporary traffic control, and be prepared to merge into the left lane as they approach the bridge.
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work both directions at LM 4.18:
Flagger-assisted lane closures on SR-08 (Ringgold Rd.) between Weldon Dr. and Bales Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/19/2026 through 12/04/2026 from 9 a.m. to 2 p.m. [2026-795]
HAMILTON COUNTY SR-8 (SIGNAL MOUNTAIN RD.) Utility Work both directions from LM 12.99 to LM 13.96:
Flagging-assisted lane closures on SR-08, Signal Mountain Rd., between Runyan Dr. and Glendale Dr. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/19/2026 through 12/4/2026 from 9 a.m. to 2 p.m. (2026-705)
HAMILTON COUNTY SR-8 (W. MAIN ST.) Utility Work both directions from LM 6.42 to LM 6.43:
Flagger-assisted lane closures on SR-08 (E. Main St.) between S. Hawthorne St. and Orchard Knob Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/25/2026 through 12/10/2026 from 9 a.m. to 2 p.m. [2026-639)
HAMILTON COUNTY SR-8 [11.67-11.75] from 11.67 to 11.75 Stringer's Ridge tunnel cleaning:
The Stringers Ridge Tunnel will be closed 11/18/2026 from 8 PM to 6 AM for cleaning. A detour will be in effect during the closures to direct traffic to alternative routes. This work is weather permitting.
[Diamond Specialized, Inc./Maint - Chattanooga/CN26203]
HAMILTON COUNTY SR-8 [5.04-5.27] from 5.04 to 5.27 Bachmann Tubes tunnel cleaning:
The Bachman Tunnel will be closed 11/19/2026 from 8 PM to 6 AM for cleaning. A detour will be in effect during the closures to direct traffic to alternative routes. This work is weather permitting.
[Diamond Specialized, Inc./Chattanooga West/CN26203]
MARION COUNTY SR-108 [2.8-3.24] slide mitigation:
The contractor will be performing slide mitigation operations, including grading, drainage, and paving on SR-108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone.
[Wright Brothers Construction Company, Inc./Dunlap/CNZ226]
MARION COUNTY SR-27 (US-HWY. 72) TDOT Contractor westbound at LM 21.2:
Soil-nailing operations by GSI will require closure of the westbound lane beginning 11/23/2026 until 12/23/2026 on SR-27 at LM 21.2. Temporary traffic signals will be in place.
MCMINN COUNTY SR-2 (US-HWY. 11) Utility Work both directions at LM 8.79:
Flagger-assisted lane closures on SR-2 (US-HWY. 11) between County Rd. 157 and County Rd. 156. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/23/2026 from 9 a.m. to 2 p.m. [2026-764)
MCMINN COUNTY SR-30 [19.69-22.88] from SR-33 Tennessee Ave to CR-890 resurfacing:
During this reporting period, the contractor will continue manhole adjustment work on SR-30 (US-411). Lane closures will be necessary when workers are present. Motorists should use caution and reduce speed when traveling through the work zone.
[Rogers Group, Inc./Cleveland/CN26205]
MCMINN COUNTY SR-305 (INGLESIDE AVE.) Utility Work both directions from LM 2.34 to LM 2.78:
Flagger-assisted lane closures on SR-305 (Ingleside Dr.) between US-11 and County Rd. 379. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/17/2026 through 11/19/2026 from 9 a.m. to 2 p.m. [2026-052
MCMINN COUNTY SR-39 [7.56-7.628] from Old Riceville Road to Avalon Street intersection improvements:
During this reporting period, the contractor will be installing a new traffic signal pole and surrounding concrete island at the intersection of SR-39 and Old Riceville Road. Traffic turning from SR-39 to Old Riceville Road will be restricted to passenger vehicles only. Larger vehicles should use Dennis Street as a detour. Additional intermittent lane closures may be necessary periodically on SR-39 while work is performed at the intersection.
[Stansell Electric Company, Inc./Cleveland/1285111]
MEIGS COUNTY SR-60 [3-3.24] bridge over Tennessee River rehabilitation:
The contractor will have the bridge over the Tennessee River on SR-60 restricted to one lane under the control of a temporary traffic signal. Motorists should plan on delays with their commutes over the Tennessee River.
[Mid-State Construction Company, Inc./Chattanooga East/CN26206]
OVERTON COUNTY SR-136 (STANDING STONE STATE PARK HWY.) TDOT Bridge Inspection both directions at LM 14.3:
State Route 136 will be closed at Mill Creek Dam in Standing Stone State Park on Monday, November 23, from 8:00 until 5 PM to allow for an inspection of the dam. The inspection is weather dependent. If the inspection cannot be completed on Monday, we will attempt to complete the inspection on Tuesday, November 24.
OVERTON COUNTY SR-52 (JAMESTOWN HWY.) TDOT Bridge Inspection westbound at LM 21.71:
A routine inspection of the SR-52 bridge over West Fork Obey River is scheduled for Monday, November 23. The westbound lane will be closed from 8:30 AM until 3:30 PM. Flaggers will be present to direct traffic through the work zone. Motorists are advised to approach the bridge with caution and to be alert to temporary traffic control devices and flaggers. Be prepared to stop when approaching the bridge from either direction.
OVERTON COUNTY SR-52 (JAMESTOWN HWY.) Utility Work both directions from LM 20.36 to LM 24.62:
Flagger-assisted lane closures on SR-52 (Jamestown Hwy.) between Red Rose Lane and Bolestown Cemetery Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 10/18/2026 through 12/18/2026 from 9 a.m. to 2 p.m. [2025-742)
POLK COUNTY SR-68 [13.92-21.88] from Stansbury Road to Tennessee-Georgia State Line resurfacing:
During this reporting period, the contractor will continue punch-list work on SR-68. Lane closures will be necessary when workers are present. Traffic will be reduced to one lane with flaggers at times while work is being performed. Motorists should use caution and reduce speed when traveling through the work zone.
[Talley Construction Company, Inc./Cleveland/CN26203]
PUTNAM COUNTY I-40 TDOT Contractor both directions from MM 286.2 to MM 288.2:
On 11/18/26 through 11/20/26, the TDOT contractor will be closing the inside lane of I-40 in both directions from 9 PM to 6 AM for survey activities.
PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing:
Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone.
[Rogers Group, Inc./Crossville/CNZ290]
PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor will be on site performing punch-list operations. During this work, temporary lane closures are possible, and flaggers will be present to direct the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway.
[Rogers Group, Inc./Cookeville/CNV284]
PUTNAM COUNTY SR-291 (BLOOMINGTON SPRINGS HWY.) Utility Work both directions from LM 0.00 to LM 1.97:
Flagging-assisted lane closures on SR-291 (Bloomington Rd.) between SR-24 and SR-56. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/05/2026 through 12/18/2026 from 9 a.m. to 2 p.m. [2026-450]
PUTNAM COUNTY SR-56 (GAINESBORO HWY.) Utility Work both directions from LM 3.74 to LM 5.90:
Flagging-assisted lane closures on SR-56 (Gainesboro Hwy.) between Hulon Ferrell Rd. and Old Gainesboro Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 10/05/2026 through 12/18/2026 from 9 a.m. to 2 p.m. [2026-452]
PUTNAM COUNTY SR-84 (CALFKILLER HWY.) Utility Work both directions from LM 1.0 to LM 8.0:
Flagger-assisted lane closures on SR-84 (Calfkiller Hwy.) from the White County line to Hidden Acres Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/27/2026 through 01/02/2027 from 8 a.m. to 3 p.m. [2023-577]
REGION 2: Dynamic Message Sign (DMS) Life Cycle Replacement:
No lane closures on CNX413 this week, unless necessary for unscheduled maintenance.
[Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]
REGION 2: Interstate and state route thermoplastic marking re-tracing.:
The contractor will be onsite performing call-out work in Putnam County on SR-135 between Green Gate Lane and the I-40 eastbound ramps. During this work, the contractor will have lane closures in place in each direction. Motorists are encouraged to use caution as they approach the work zone.
[Mullen's Markings, Inc./Cookeville/262003]
REGION 2: preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System:
The contractor may have short-term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic.
[Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]
REGION 2: The on-call cable barrier repair on various Interstate and State Routes.:
The contractor will have shoulder closures in order to perform cable barrier rail repair. A shoulder closure will be used in the median of interstates and major divided state routes, and work will occur during daylight hours Monday through Friday as needed.
[LU, Inc./McMinnville/CNZ205]
REGION 2: The on-call guardrail repair and new guardrail installation on various Interstate and State Routes:
The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate and high-speed divided state routes nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Saturday on state routes. At least one travel lane will remain open to traffic in each direction at all times on the interstate, and flaggers will be present on state routes during any work that is performed.
[Reynolds Fence and Guardrail, Inc./McMinnville/CN26203]
REGION 2: The random on-call attenuator repair on various Interstate and State Routes:
The contractor will close the I-24 Exit 184 EB ramp to Moore Rd. in Hamilton County for attenuator repair on 11/24/26 from 8 PM to 6 AM. However, the work may be rescheduled to occur on 11/19/26 or 11/20/26 if crews become available earlier.
[LU, Inc./McMinnville/CN26S00]
REGION 2: Sweeping on various Interstate and State Routes:
Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high-traffic state routes, while daytime sweeping can be anticipated between 9 AM and 3 PM for lower-traffic state routes.
[Spears-Hopkins Paving Co., LLC/Chattanooga West/CNZ248]
SEQUATCHIE COUNTY SR-111 [4.32-7.57] resurfacing with cold in-place recycling (CIR):
The contractor will be performing project closeout activities on SR-111 from near Lewis Chapel Road (LM 4.3) to near East Valley Road (7.5) in Sequatchie County. This work will require intermittent single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC /Dunlap/CN26201]
SEQUATCHIE COUNTY SR-28 [0-4] (US-127) from the Marion County line to Wilson Road:
The contractor will be performing project closeout activities on SR-28 from the Marion County line to east of Wilson Road. This work will require intermittent single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Rogers Group, Inc./Dunlap/CN26205]
SEQUATCHIE COUNTY SR-399 [0-5.9] resurfacing from the Grundy County line (LM 0) to near SR-111 (LM 5.9):
The contractor will be performing project closeout activities in Sequatchie County on SR-399 from the Grundy County line to near SR-111. This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Asphalt Paving Systems, Inc./Dunlap/CN26202]
SEQUATCHIE COUNTY SR-8 (HWY. 8) TDOT Maintenance both directions from LM 18 to LM 22:
Rumble strip installation will require closure of the #1 lane in both directions on 11/21/26 from 7 AM to 5 PM.
SEQUATCHIE COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 3.66 to LM 3.93:
Flagger-assisted lane closures on SR-08 (Taft Hwy.) between Walden’s Farm Rd. and Browns Chapel. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/16/2026 through 12/18/2026 from 9 a.m. to 2:00 p.m. [2026-132)
SEQUATCHIE COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 3.66 to LM 3.93:
Flagger-assisted lane closures on SR-08 (Taft Hwy.) between Walden’s Farm Rd. and Browns Chapel. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/16/2026 through 12/18/2026 from 9 a.m. to 2:00 p.m. [2026-132)
SEQUATCHIE COUNTY SR-8 [22.73-27.42] from south of Whitlow Road (LM 22.7) to north of Sherman Road (LM 27.4):
The contractor will be performing project closeout activities on SR-8 in both directions from near Whitlow Road to near Sherman Road. This work will require lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC /Dunlap/CN26205]
WHITE COUNTY SR-1 (CROSSVILLE HWY.) Utility Work both directions from LM 17.25 to LM 17.47:
Flagger-assisted lane closures on SR-1 (Crossville Hwy.) in the area of Old Bonair Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 11/25/2026 from 9 a.m. to 2 p.m. [2026-789]
RESTRICTIONS:
COFFEE COUNTY - CNZ029:
12' width restriction on all ramps at the Exit 117 interchange with AEDC Rd./Wattendorf Highway.
CUMBERLAND COUNTY - CNZ206:
Both lanes of SR-24 are closed at LM 15.06 to LM 15.6.
###