Roadway Activity Report for the Lower East and Upper Cumberland (September 4-10, 2025)
DISTRICT 27
CUMBERLAND COUNTY I-40 TDOT Bridge Inspection both directions from MM 315.8 to MM 315.9: On Wednesday, September 10th, TDOT Bridge Inspection will perform routine bridge inspections on the I-40 bridges over Drowning Creek at the MM 315.81. The right travel lane and shoulder will be closed on the eastbound bridge from 8:00 am until noon. The right travel lane and shoulder will be closed on the westbound bridge from noon until 3:30 pm. This work is weather dependent and will be rescheduled in the event of inclement weather.
CUMBERLAND COUNTY I-40 TDOT Bridge Inspection both directions from MM 317.8 to MM 317.9: On Tuesday, September 9th, the I-40 bridges over the Obed River at MM 317.86 will undergo routine inspections. This will require that the right travel lane and shoulder be closed on the eastbound bridge from 8 AM until 12 PM, and that the right travel lane and shoulder will be closed on the westbound bridge from 12 PM until 3:30 PM. This work is weather dependent and will be rescheduled in the event of inclement weather.
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. The contractor has scheduled paving operations beginning on the north end of the project on the proposed alignment. The contractor has closed North Grace Hill Drive at the existing intersection of SR-28 (US-127) for construction activities. Motorists should utilize South Grace Hill Drive as the detour with appropriate signs. Traffic has been moved to temporary alignment on Plateau Road and permanent alignment on Potato Farm Road. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY I-40 [304-306] from Putnam County Line to near parking area resurfacing and bridge repair: The contractor will be milling and paving nightly on I-40 from MM 304 to MM 307 from 7 PM to 6 AM. During this work, one lane in each direction will be closed. Motorists should use caution as they approach the work zone and should prepare to encounter slow or stopped traffic. [Rogers Group, Inc./Cookeville/CNZ104]
CUMBERLAND COUNTY I-40 [317.86-322.37] from near Obed River to near SR-101 resurfacing: The contractor is performing nighttime resurfacing operations of I-40 from near the Obed River at MM317.8 to near SR-101 at MM322.3. This work will typically take place between Sunday night through Friday morning from 7PM to 6AM each night. Motorists should use caution when traveling through the area. [Rogers Group, Inc./Crossville/CNY241]
CUMBERLAND COUNTY SR-298 [8.35-9.02] from north of Catoosa Canyon Dr to south of Obed Pines Rd construction of a small drainage structure: The contractor continues construction activities on Genesis Road (SR-298). Both lanes of Genesis Road (SR-298) at LM 8.35 to LM 9.02 have been closed and will be closed for the duration of the project with a posted detour route along SR-28 (US-127) and SR-62. The contractor will be working to replace a culvert underneath Genesis Road and installing retaining walls. RESTRICTIONS: Both lanes of Genesis Road (SR-298) are closed from LM 8.35 to LM 9.02. [J. Hill Excavating, LLC/Crossville/CNZ103]
CUMBERLAND COUNTY SR-68 [0.34-5.58] from near SR-28 (US-127) to near Wiley Ford Road resurfacing: The contractor will be performing paving activities along SR-68 from near SR-28 (LM 0.34) to near Wiley Ford Road (LM 5.58). During these operations, a temporary lane closure will be utilized with flaggers and signs. Motorists should use caution when traveling through the project limits. [Rogers Group, Inc./Crossville/CNZ135]
DEKALB COUNTY SR-26 (SPARTA HWY.) Utility Work both directions from LM 26.35 to LM 29.75: Flagger assisted lane closures on SR-26 (Sparta Hwy) from the White County line to Billings Road / Johnson Chapel Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 05/28/25 thru 09/30/25 from 8 am - 3 pm. [2024-410]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor continues grading and construction activities throughout the project. Temporary lane closures and periodic traffic stoppages will be necessary for construction activities and motorists should be prepared to stop while traveling through the work zone. Motorists are encouraged to obey posted speed limit and to watch for construction equipment and personnel adjacent to the roadway. The West end of Old Liberty Road will be closed to through traffic due to construction activities. Motorists and EMS will need to use the East entrance of Old Liberty Road to gain access and follow detour signs. [Twin K Construction/Cookeville/CNV012]
FENTRESS COUNTY SR-52 (RUGBY PK.) Utility Work both directions from LM 26 to LM 29: Flagger assisted lane closures on SR-52 (Rugby Pike) from Rugby Parkway to West of Ellis Drive. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/04/25 thru 09/26/25 from 7 am - 3 pm. [2025-407]
PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. West Davis Road and Henley Drive remain closed at the intersection of SR-136 with detour signs to utilize Bunker Hill Road. SR-111 SB exit ramp to SR-136 is closed. The detour for this closure is for motorists to utilize I-40 to SR 136 and then use SR 136 to travel southbound. Motorists are encouraged to use caution while traveling through the work zone and be aware of construction personnel and equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/CNV284]
PUTNAM COUNTY SR-136 (S. JEFFERSON AVE.) Utility Work both directions from LM 2.55 to LM 2.75: Northbound and southbound lane closures on SR-136 (S Jefferson Ave) between Spring Street Town Square to I-40. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 11/14/24 through 11/04/25 from 9 am - 2 pm. [2024-640]
PUTNAM COUNTY SR-24 (W. SPRING ST.) Utility Work both directions from LM 18 to LM 19: Lane closures on SR-24 (W. Spring Street) with detours at Scott Avenue and S. Walnut Avenue. Motorists are encouraged to use caution and watch for signage. Police, barricades, signage, and personnel will be present, 07/28/25 thru 09/30/25 from 8 am -3 pm. [2024-580]
PUTNAM COUNTY SR-84 (CALFKILLER HWY.) Utility Work both directions from LM 1 to LM 8: Flagger assisted lane closures on SR-84 (Calfkiller Hwy) from the White County line to Hidden Acres Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/24/25 thru 09/30/25 from 8 am - 3 pm. [2023-577]
PUTNAM COUNTY I-40 [300-304] from West of SR-24 to Cumberland County Line resurfacing and bridge repair: The contractor will be milling and paving nightly on I-40 from MM 300 to MM 304 from 7 PM to 6 AM. During this work, one lane in each direction will be closed. In addition, the on and off ramps may be closed intermittently to allow the contractor to mill or pave. Signs and message boards warning of the closures will be in place. Motorists should use caution as they approach the work zone and should prepare to encounter slow or stopped traffic.
[Rogers Group, Inc./Cookeville/CNZ104]
WHITE COUNTY SR-1 (CROSSVILLE HWY.) Utility Work westbound from LM 18 to LM 19: Shoulder lane closures on SR-1(US-Hwy 70 W) from Love Joy Road to East of Eastland Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, personnel, and barrels/cones will be present, 07/10/25 thru 08/30/25 from 6 am - 4:30 pm. [2025-355]
DISTRICT 28
BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road: The contractor will be performing grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone. [Rogers Group, Inc./Dunlap/CNY153]
CANNON COUNTY SR-281 [0-4.51] from SR-53 to Todd Rd resurfacing: The contractor will have lane closures during daylight hours from 5AM to 9PM for operations involving installing traffic control devices and then milling operations as needed. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times.
[Rogers Group, Inc./McMinnville/CNZ066]
COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone.
[Jones Bros. Contractors, LLC/Tullahoma/CNZ029]
COFFEE COUNTY I-24 resurfacing from east of SR-2 (US-41) (LM 8.9) to near SR-55 (LM 14.8), including bridge expansion joint repairs and thin epoxy overlay: Nightly alternating lane closures will continue on I-24 from 7PM-6AM for resurfacing operations. One lane in each direction will be maintained at all times. [Rogers Group, Inc./Tullahoma/CNY262]
COFFEE COUNTY I-24 (MM 105) construction of an overpass carrying SR-2 (US-41): Phase 2 of I-24 bridge replacement at Exit 105 will continue this week. SR-2 will be reduced to one lane utilizing traffic signal system. The temporary traffic signal will be removed on 08/27/25. Periodic flagging operations will be utilized for remaining construction activities. There will be alternating lane closures on I-24 at MM 105 from 09/10/25 thru 09/12/2025 nightly from 7PM to 6AM for bridge painting activities. [Bell and Associates Construction, LP/Tullahoma/CNX309]
COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 1 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Contractor may use temporary lane shifts to complete storm structure installations. Phase 1 traffic shift has reduced lanes from 3 to 2 from Cedar Lane to near Grau Lane in order to continue bridge replacement and storm drainage work. [Dement Construction Company, LLC/Tullahoma/CNX912]
COFFEE COUNTY SR-55 repair of the bridge over the Little Duck River (LM 14.0): Lanes are reduced to one lane in each direction across the SR-55 bridge over the Little Duck River for bridge repair work. This lane reduction will be in place until work is complete in Fall 2025. [Mid-State Construction Company, Inc./Tullahoma/CNX412]
GRUNDY COUNTY I-24 TDOT Maintenance eastbound from MM 127 to MM 129: Maintenance will be working in the I-24 median. Day 1 When: Thursday 09/04/25 What: Rolling roadblocks and shoulder closure. We will do 1 rolling roadblock in the morning to off load materials and equipment, set up an inside shoulder closure for 2-4 hours, then do another rolling roadblock to remove our equipment. Where: Grundy County, I-24 MM 128.8 EB Day 2 When: Tuesday 09/09/25 What: Rolling roadblocks and shoulder closure. We will do 1 rolling roadblock in the morning to off load our equipment, set up an inside shoulder closure for 4-6 hours, then do another rolling roadblock to remove our equipment. Where: Grundy County, I-24 MM 128.8 EB
GRUNDY COUNTY SR-2 (US-41) TDOT Contractor westbound from LM 7.2 to LM 7.4: During daylight hours on 09/15/25 and 09/16/25 TDOT contractors will close the westbound lane and maintain a single flagging-controlled lane in both directions through the work zone. (FORD / AWP Traffic Control)
GRUNDY COUNTY SR-56 [5.42-7.81] from Montgomery Street to Des Church Road resurfacing: The contractor will have lane closures during daylight hours from 5AM to 9PM for paving and related operations as needed. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times.
[Tinsley Asphalt, LLC /McMinnville/CNZ033]
MARION COUNTY SR-2 (DIXIE LEE AVE.) Utility Work both directions from LM 30.59 to LM 30.74: Flagger assisted lane closures on SR-2(Dixie Lee Ave) at the Sullivan's Landing TWRA Boat ramp. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 08/14/25 thru 09/10/25 from 9 am - 2 pm. [132273.00]
MARION COUNTY I-24 [156.4-160.2] from 156.4 to 160.2 resurfacing: The contractor will be performing resurfacing operations on I-24 EB and WB in Marion County from MM 156.4 East of SR-28 to MM 160.2 West of the Tennessee River. This work will require single lane closures leaving one lane open in each direction each night worked. Resurfacing operations will be Sunday through Thursday from 6 PM CT - 5 AM CT. Please use caution when driving through the work zones. [Talley Construction Company, Inc./Dunlap/CNZ108]
MARION COUNTY SR-156 repair of bridge over Tennessee River, LM 15.2: The contractor will be performing painting operations and structural repairs on the SR-156 bridge over the Tennessee River in South Pittsburg. This work will require a traffic shift leaving both lanes open to traffic. There will also be intermittent lane closures controlled by flaggers leaving one lane open. Please use caution when driving through the work zone. [Olympus Painting Contractors Inc./Dunlap/CNY063]
MARION COUNTY SR-27 (US-72) resurfacing from the Alabama State Line (LM 0) to north of SR-156 (LM 2.7): The contractor will be performing paving operations on SR-27 EB and WB in Bledsoe County from the Alabama state line to north of SR-156. This work will require single lane closures leaving one lane open in each direction during daytime work hours. Please use caution when driving through the work zones. [Tinsley Asphalt, LLC /Dunlap/CNZ036]
VANBUREN COUNTY SR-111 [14.87-19.54] from Sparta Street to White County Line micro surfacing: The contractor will have occasional lane closures during daylight hours from 5AM to 8PM for sign and traffic control device installations and to begin micro surfacing related operations as needed. [Asphalt Paving Systems, Inc./McMinnville/CNZ177]
WARREN COUNTY SR-108 [2.83-11.49] from near S.R. 287 to South Chancery Street microsurfacing and bridge expansion joint repair: The contractor will have lane closures during daylight hours from 5AM to 9PM for paving operations as needed. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times. [Wiregrass Construction Company, Inc./McMinnville/CNZ043]
DISTRICT 29
BRADLEY COUNTY I-75 at Paul Huff Parkway Interchange modifications: No work occurring at this time. Contractor waiting on delivery of remaining signal equipment.
[Summers-Taylor, Inc./Cleveland/CNX362]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the project has been substantially completed, and a final walkthrough shall be completed on 8/29 with an official contract end date of 8/31. There should not be any lane closures after the week of 8/25 as the paving will be finished, and the thermoplastic crew will be done with all roadway striping. [Summers-Taylor, Inc./Cleveland/CNV130]
BRADLEY COUNTY I-75 [15.35-19.309] from MM 31 to MM 35 (McMinn County Line) resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNY261]
BRADLEY COUNTY SR-60 [13.1-13.28] at Benton Pike safety improvements: During this reporting period, improvements on the SR 60 North Benton Pike exit shall commence. Expect the roadway to reduced to one lane between the hours of 8:00 AM - 3:30 PM. [Wright Brothers Construction Company, Inc./Cleveland/CNZ183]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly Lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. These closures may temporarily reduce traffic to a single lane. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. (Note: The entrance ramp from South Terrace (between S. Moore Road and McBrien Road) onto I-24 East will reopen Thursday, September 4th. Nighttime closures on I-24 East and West will occur on Wednesday, September 3rd and Thursday, September 4th so that work crews can remove portable concrete barrier walls in preparation for future paving and traffic shifts. This future work is scheduled to be performed at night (9 PM to 6 AM) and will take several weeks, beginning Sunday, September 14th. Overhead sign work will resume on I-75 (North and South) and on I-24 (East and West). between Sunday, September 7th and Thursday, September 11th. There will be nightly closures during this time from 9 PM to 6 AM for installation of signs and structures. Traffic on interstates may be reduced to a single lane and/or rolling roadblocks used to temporarily stop traffic (15 minutes or less) while crews install signs and/or overhead structures.) It may also be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or repairing guardrail, attenuators, etc. Portions of the left lane on North and South Terrace between Germantown Road and Spring Creek Road will remain closed for the installation of drainage structures, sanitary sewers, retaining and noise wall construction. The entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road are currently closed (Note: A new entrance ramp from North Terrace to I-24 West is now open in this area. A new entrance ramp and exit ramp to I-24 East from South Terrace has been opened. Please look for detour signs giving directions to access these new ramps). Starting early morning on Monday September 8th through Friday September 12th, the contractor will be temporarily closing the new I-24 EB entrance ramp located off N. Terrace past Moore Road. Motoring Traffic wanting to get onto I-24 WB will have to use the newly re-opened Germantown Road I-24 WB entrance ramp. Also, starting Monday September 8 through Friday September 12th, from 9 AM-3 PM, The I-24 EB entrance ramp from S. Terrace located before Moore Road will be temporarily closed during these times. The motoring public will still be able to get onto I-24 EB by using the I-24 EB entrance ramp located East of Moore Road. RESTRICTIONS: Ramps between Belvoir and Moore Road closed. [Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 0 to LM .74: Flagging assisted lane closures on Lee Hwy (OE479) from near the entryway for McKay's to the end of Lee Hwy at General shale Brick & Building Materials. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/08/25 through 11/10/25 from 7 am - 5 pm. [2024-297]
HAMILTON COUNTY SR-312 (MAHAN GAP RD.) Utility Work both directions from LM 16 to LM 18: Flagging assisted lane closures on SR-312 (Mahan Gap Road) between Ooltewah Georgetown Road and Firetower Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/09/25 through 09/11/25 from 9 am - 2 pm. [2025-656]
HAMILTON COUNTY SR-320 (E. BRAINERD RD.) Utility Work both directions from LM 3.82 to LM 4.30: Flagger-assisted lane closures on SR-320 (E. Brainerd Rd) between Graysville Rd and Givens Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 09/02/25 thru 09/05/25 from 9 am - 2 pm. [2025-506]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 0: Flagger assisted lane closures on SR-321 (Ooltewah-Ringgold Road) at the Georgia State Line from Windstone Drive to Mountainaire Drive. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 09/05/25 from 9 am - 2 pm, with a rain date of 09/06/25. [2025-198]
HAMILTON COUNTY SR-58 (W. 40TH ST.) Utility Work westbound from LM 2.5 to LM 3.5: Lane closures on SR-58 (W. 40th Street) between Pirola Street and Alton Park Blvd. Motorists are encouraged to use caution and watch for signage. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 09/04/25 thru 09/10/25 from 9 am - 2 pm. [2025-618]
HAMILTON COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 21.5 to LM 22.5: Flagging assisted lane closures on SR-320 (E. Brainerd Road) between Rocky Branch Road and Hollister Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/08/25 through 09/10/25 from 9 am - 2 pm. [2025-610]
HAMILTON COUNTY I-124 (US-27) from I-24 Interchange to South of the Tennessee River Bridge: Daily lane closures are possible between 9 AM and 3:30 PM as the contractor work along the ramps and 4th Street. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control. [Stansell Electric Company, Inc./Chattanooga East/CNY900]
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps and Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman’s Jewelers and Texas Roadhouse. The contractor has implemented a traffic shift on Hamilton Place Blvd. shifting NB and SB traffic to the east side of the existing roadway from near the I-75 SB on-ramp to near Bams Drive for the installation of storm drainage. The contractor will maintain 1 lane of traffic in each direction throughout this area. On the nights of 09/08/25 through 09/11/25 the contractor will close a single left lane on I-75 NB and I-75 SB from MM 4.8 to MM 6.3 for debris removal. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]
HAMILTON COUNTY I-75 [4.2-4.5] from Exit 4A to SR-153 to Exit 3 to East Brainerd Road box culvert rehabilitation: The contractor will be closing the right lane on I-75 SB between the Exit 4A (SR-135) and Exit 3 (eat Brainerd) on 09/03/2025 between the hours of 9PM and 6AM. The right shoulder will be closed for the duration of the project. Drivers should watch for construction vehicles entering and exiting the interstate.
[Wright Brothers Construction Company, Inc./Chattanooga East/CNZ186]
HAMILTON COUNTY SR-2 [11.33-11.92] from Dodds Ave to Seminole Drive tunnel rehabilitation: There will be nighttime flagging operations to allow the contractor to finish final pavement striping. The flagging operations will be between the hours of 8PM and 6AM.
[Stansell Electric Company, Inc./Chattanooga East/CNY192]
HAMILTON COUNTY SR-2 [2.73-3.19] from Wauhatchie United Methodist Church to Brown's Ferry safety improvements: The contractor will be working on safety improvements along this route. This work will require nightly lane closures between the hours of 8PM and 6AM Sunday through Thursday. [APAC - Atlantic, Inc./Chattanooga East/CNZ107]
HAMILTON COUNTY SR-29 [20.72-25.756] from SR-111 to Old Dayton Pk. Resurfacing: The contractor has rescheduled construction on the SR-111 SB to US-27 NB ramp and the US-27 SB to SR-111 NB ramp to 09/08/2025. This work will require full closures of these ramps. Only one ramp will be closed at a time and the closures will take place at night 9 PM to 6 AM. The ramp work is expected to be completed 09/11/2025, weather dependent. The contractor will continue resurfacing prep at the intersections of US-27/Highwater Road. This work will require temporary lane closures on US-27 and the intersecting roads. Resurfacing work will take place during daytime hours. [Rogers Group, Inc./Chattanooga West/CNZ034]
HAMILTON COUNTY SR-8 [10.14-11.96] from Frazier Ave to Signal Mountain Blvd resurfacing: Utility owners outside the contract will be adjusting manholes within the travel lanes.
[APAC - Atlantic, Inc./Chattanooga East/CNZ138]
HAMILTON COUNTY SR-8 [8.97-10.14] from MLK to Frazier Avenue resurfacing: Utility owners outside of the contract will be adjusting manholes within the travel lanes. [APAC - Atlantic, Inc./Chattanooga East/CNZ107]
MCMINN COUNTY SR-2 (US-HWY. 11) Utility Work both directions from LM 16.81 to LM 19.61: CR-255 & Burn Rd Flagger assisted lane closures on SR-2 (US-11) betweenCR-255 & Burn Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 08/11/25 thru 10/31/25 from 9 am - 2 pm. [2024-374]
MCMINN COUNTY SR-33 (S. AMHURST PL.) Utility Work southbound from LM 6.27 to LM 6.10: Southbound lane closure on SR-33 (S. Amhurst Pl) between Englewood Ave and Dixson Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 09/02/25 thru 09/19/25 from 9 am - 2 pm. [2025-635]
MCMINN COUNTY SR-39 (LIBERTY HILL RD.) Utility Work both directions from LM 20 to LM 22: Flagging assisted lane closures on SR-39 (Liberty Hill Road) from Weir Road to Prospect Branch Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/08/25 through 09/11/25 from 9 am - 2 pm. [2025-404]
MCMINN COUNTY SR-68 Utility Work both directions from LM 6 to LM 7.5: Flagging assisted lane closures on SR-68 from Adkins Road to Richardson Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/04/25 through 09/09/25 from 9 am - 2 pm. [2025-605]
MCMINN COUNTY I-75 [0-2.06] from MM 35 (Bradley County Line) to MM 37 resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNY261]
MCMINN COUNTY I-75 [2.06-4.32] from MM 37 to MM 39.5 resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNZ109]
MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): During this reporting period, the Northbound and Southbound traffic will be reduced to one lane and controlled by traffic signals. County road 567 will be closed to traffic (LOCAL TRAFFIC ONLY) and detoured to SR039. This closure is necessary to perform the bridge replacement. The lane restriction will remain in place until the bridge replacement is completed. [Whaley Construction, LLC/Chattanooga East/CNX069]
MCMINN COUNTY SR-39 from west of Cook Drive to SR-30 and from SR-310 to the Monroe County Line: During this reporting period, the contractor will complete punch list work on SR-39. Motorists should be aware of workers in the area performing this work. Intermittent lane closures and flagging operations around the work area will be necessary.
[Rogers Group, Inc./Cleveland/CNZ038]
POLK COUNTY SR-68 construction of bridge over Brush Creek (LM 16.4): During this update period, the existing closed lane has been reopened for traffic. Motorists are advised to reduce speed and use caution in the work zone. [Wright Brothers Construction Company, Inc./Cleveland/CNX347]
POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period, the contractor will continue construction on the SR-68 North bridge. All SR-68 traffic is using the existing SR-68 South bridge while construction occurs on the new SR-68 North bridge. All SR-40/SR-68 interchange traffic will utilize the SR-68 South interchange ramps. A temporary 3-way stop has been implemented at the intersection of the SR-40 interchange ramp and SR-68. Motorists are encouraged to slow down when entering the construction zone and look out for new stop signs on SR-68 near the SR-40/SR-68 interchange. [Wright Brothers Construction Company, Inc./Cleveland/CNZ042]
RHEA COUNTY SR-30 (STATE HWY. 30) TDOT Bridge Inspection eastbound at LM 7.99: On Monday, September 8th, A routine inspection of the SR-30 bridge over Richland Creek will require closure of the eastbound lane on the bridge from 9:30 AM until 12 PM. Flaggers will be present to direct traffic through the work zone. Drivers are asked to use caution when approaching the bridge from either direction, be aware of the presence of flaggers, and be prepared to stop.
RHEA COUNTY SR-302 (NEW LAKE RD.) Utility Work both directions from LM 2 to LM 3: Flagging assisted lane closures on SR-302 (New Lake Road) from Scenic Hill Drive to Greer Harris Lane. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/08/25 from 9 am - 2 pm. [2025-226]
RHEA COUNTY SR-29 [14.66-19.879] from Boofer Lane to Metzger LN Resurfacing: Paving operations will continue during this reporting period. The contractor will utilize temporary lane closures from 7AM to 6PM during paving operations. Motorists should use caution while traveling on this route and pay attention to all construction signage.
[Rogers Group, Inc./Chattanooga West/CNY118]
RHEA COUNTY SR-30 repair of bridge over Tennessee River: The contractor will be making repairs under the Tennessee River Bridge. The remaining work will require the contractor to shut the roadway down to one lane using flaggers or temporary traffic signals. Watercraft users should use caution when accessing the TWRA boating ramp under the bridge in Rhea County. The contractor will have equipment and materials in the area of the access road for the boating ramp.
[Mid-State Construction Company, Inc./Chattanooga East/CNY201]
REGION WIDE
REGION 2 The on-call concrete pavement repair at various locations on various Interstate and State Routes: The contractor will be repairing concrete pavement on the ramps at I-24 exit 127. All 4 ramps on I-24 at exit 127 will be worked on. This work will require the narrowing of each ramp with a minimum open lane width of 10 feet. Please use caution when driving through the work zones. [Bluegrass Contracting Corporation/Dunlap/CNY295]
REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: Shoulder Closures will be in place at Bradley I-75 NB at MM 27.2, McMinnI-75 SB at MM 42.2, and Marion County I-24 WB at MM 156. Trucks will be entering and exiting the work zone during daytime hours. No lane closures for this week. [Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]
REGION 2 The crack sealing at various locations on various State Routes: The contractor will have lane closures between 5 AM and 9 PM for crack sealing operations in Hamilton County on SR-27 from LM 0.00 to 3.90 and on SR-317 from LM 5.14 to 7.70 beginning 09/02/25. Upon completion of those routes, they will move to Marion County SR-2 LM 1.40 to 11.55, then to Rhea County SR-68 LM 0.0 to 8.25 and SR-303 LM 0.45 to 5.73. Work will continue 7 days per week unless the contractor stops for weather or other logistical purposes.
[Reynolds Sealing and Striping, Inc./McMinnville/CNZ143]
REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed. [Reynolds Fence and Guardrail, Inc./McMinnville/CNZ112]
REGION 2 The sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high traffic state routes, while daytime sweeping can be anticipated between 9 AM to 3 PM for lower traffic state routes. [Sweeping Corporation of America, Inc./Chattanooga West/CNY210]
REGION 2 Thermoplastic retracing on various interstate and state routes: The contractor will be on site in Franklin County on SR-50 from LM 11.490 - 14.040, Grundy County on I-24 EB/WB from LM 4.500 - 7.310, Marion County on SR-2 from LM 11.760 - 15.230 and Marion County I-24 EB/WB from LM 0.000 - 6.350, and in Bradley County on SR-60 from LM 8.20 - 10.96, SR-2 from LM 20.92 - 20.98. Work will also be in Hamilton County on the following routes: SR-319 from LM 1.99 - 4.33, SR-29 from LM 11.57 - 14.86, SR-320 from LM 1.52 - 3.83, SR-8 from LM 12.45 - 13.96, SR-319 from LM 4.78 - 7.22, SR-317 from LM 1.74 - 3.72, SR-319 from LM 0.00-1.99, SR-2 from LM 5.93 - 7.07, SR-2 from LM 7.41 - 7.98, and SR-2 from LM 8.60 - 10.08. During this work, the contractor will utilize a mobile operation with mobile message boards and an attenuator truck. Motorists are encouraged to slow down as they approach the work and should be aware of the potential of stopped or slowing traffic. [Reynolds Sealing and Striping, Inc./Cookeville/CNZ054]
REGION 2 Various Interstate and SRs - Cable Barrier Repair: The contractor will have short term shoulder and/or lane closures in order to perform cable barrier rail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday. At least one travel lane will remain open to traffic at all times. Typically, only a shoulder closure will be used in the median, but lane closures will be employed as needed.
[LU, Inc./McMinnville/CNY183]
REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short-term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. Flaggers will assist with traffic control as needed. [Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]
RESTRICTIONS
CUMBERLAND COUNTY - CNZ103: Both lanes of Genesis Road (SR-298) are closed from LM 8.35 to LM 9.02.
HAMILTON COUNTY - DB2101: Ramps between Belvoir and Moore Road closed.
###