Middle Tennessee Scheduled Lane Closures Aug. 22 - 28, 2024
DAVIDSON COUNTY I-24
The resurfacing on I-24 from I-65 to I-40 (East loop) including bridge expansion joint repairs.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for milling operations, along with intermittent temporary ramp closures.
The random on-call sign replacement on various interstates and state routes.
• Nightly, 8 p.m. – 5 a.m., There will be a double right lane closure on I-24 EB for overhead sign replacements.
The resurfacing on I-24 near I-440 to near Haywood Lane.
• Nightly (excluding weekends), 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for degrassing and milling operations.
RUTHERFORD COUNTY I-24
The resurfacing on I-24 from near the Stones River to east of the CSXT Railroad.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-24 in both directions for milling and paving activities (MM 78-82).
DAVIDSON COUNTY I-40
The repair of the bridge on the I-40 WB merge ramp over the I-65 NB merge ramp (MM 210).
• 8/22 – 8/28 (excluding weekends), 9 p.m. – 5 a.m., There will be a lane closure on I-40 WB merge ramp/Exit 210B from the split of Exit 210B/Exit 210A to the merge of I-40 WB/I-65 SB for bridge construction activities.
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the Donelson Pike interchange.
• 8/22– 8/28 (excluding weekends), 1 p.m., There will be an alternating rolling roadblock on I-40 in both directions for blasting (MM 214 – 220).
Milling and paving.
• LOOK AHEAD: 8/29, 8 p.m. – 5 a.m., Lanes 2 and 3 on I-40 EB will be closed for milling and paving. There will also be a Lane 1 & 2 closure on I-40 EB/I-65 SB at MM 82.4 and Exit 210 closure.
HUMPHREYS COUNTY I-40
The construction of bridges on I-40 over Squeeze Bottom Lane and the Buffalo River (MM 140.5 – 141.5).
• 8/26 – 8/28, 7 p.m. – 5 a.m., There will be nightly lane closures on I-40 EB to set barrier rail and install attenuators. One lane will remain open.
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40
The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in Dickson County to near U.S. 70S (Exit 196) in Davidson County.
• Daily, 7:30 a.m. – 6 p.m., There will be daytime shoulder closures on I-40 in both directions to maintenance pads at the pull boxes throughout the project limits.
• Nightly, 8 p.m. – 5 a.m., There will be nighttime lane closures on I-40 in both directions for guardrail installation.
DAVIDSON COUNTY I-65
The repair of the bridge on the I-40 WB merge ramp over the I-65 NB merge ramp.
• 8/22 – 8/28 (excluding weekends), 9 p.m. – 5 a.m., There will be lane closures on the I-65 NB merge ramp at Exit 82B from the split of Exits A&B to the merge of I-65 NB/I-40 EB for bridge construction activities.
Comcast aerial crossing by rolling roadblock.
• 8/25, 6 a.m. (first light) – 9 a.m., Comcast via BTR will be performing an aerial crossing of I-65 between Harding Place and Armory Drive via rolling roadblock.
ROBERTSON COUNTY I-65
Grading, drainage, construction of bridges and retaining walls, ITS and paving.
• Nightly, 8 p.m. – 5 a.m., There will be temporary lane closures on I-65 in both directions for pavement markings and thermoplastic (MM 112 – 120).
WILLIAMSON COUNTY I-65
The repair of the bridge on SR 96 over I-65 (MM 64 – 66).
• 8/22 & 8/28, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for paint striping.
RUTHERFORD COUNTY I-840
The resurfacing on I-840 from near I-24 to near the West Fork Stones River.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-840 in both directions for milling and paving activities (MM 50 – 55).
WILLIAMSON COUNTY I-840
Milling and paving.
• Nightly, 8 a.m. – 3 p.m., There will be alternating lane closures in both directions for milling and paving activities (MM 30.5 – 33.2).
CHEATHAM COUNTY SR 249
The construction of a concrete box beam bridge on SR 249 over Dry Creek, including grading, drainage and paving.
• 8/22 – 8/28, Continuous, The bridge will be reduced to one lane in order to demo the existing structure and reconstruct the new bridge. Traffic will be controlled by temporary signals.
DAVIDSON COUNTY SR 1
Roadway Repair/Patching.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane and shoulder closures in both directions (MM 10.97 – 11.22).
• Daily, 9 a.m. – 3 p.m., There will be various lane closures in both directions (MM 20.43 – 32.27).
DAVIDSON COUNTY SR 100
The bridge repair on SR 100 over Harpeth River.
• 8/22– 8/28, Continuous, The bridge will be reduced to one lane for a bridge repair. Traffic is controlled by temporary signals at the bridge.
DAVIDSON COUNTY SR 106
On-call concrete pavement repair at various locations in Region 3.
• 8/22, 8 p.m. – 5 a.m., 8/23 at 8 p.m. – 8/25 at 12 p.m. (continuous), There will be a lane shift on Hillsboro Road NB exit to I-440 EB on ramp to replace damaged concrete areas. The ramp will remain open.
Piedmont-Burns Services Inc. sidewalk/shoulder repairs.
• Daily, 9 a.m. – 3p.m., There will be lane closures along SR 106 for restoration of sidewalk/shoulder area.
DAVIDSON COUNTY SR 11
The widening of US 31A (SR 11, Nolensville Pike) from North of the Mill Creek bridge to SR 254 (OHB) including bridges, retaining walls, signals and lighting.
• Daily, 9 a.m. – 3 p.m. There will be temporary lane closures on SR 11 and associated side roads for utility relocation, grading and drainage.
NES pole replacement.
• Daily, 9 a.m. – 3 p.m., There will be lane closures for replacement of two poles near the intersection with I-65 ramps.
DAVIDSON COUNTY SR 155
Milling and paving.
• 8/26 – 8/28, 8 p.m. – 5 a.m., Alternating lane closures in both directions.
DAVIDSON COUNTY SR 255
The random on-call sign replacement on various interstates and state routes.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures on Harding Place WB at the I-65/Sidco Drive junction for extruded panel sign replacements on existing cantilever structures.
Blasting for MNAA TARI Phase 2; one blast per day at 1 PM CST.
• Daily, 12:55 p.m. – 1:05 p.m., There will be a complete road closure in both directions during blasting. All traffic will be held while blasting.
The grading, drainage, construction of bridges, retaining walls and paving on SR 55 over I-40 (MM 216) at the Donelson Pike interchange.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures on Donelson Pike for grading and utility work.
DAVIDSON COUNTY SR 45
The removal of Portland Cement Concrete and repaving on SR 45 (Old Hickory Boulevard) at the intersection of US 31 E (SR 6, Gallatin Pike).
• 8/23 at 8 p.m. – 9/26 at 5 a.m. (continuous), There will be temporary lane closures in both directions for milling and paving operations.
DAVIDSON COUNTY SR 6
NES pole replacement.
• LOOK AHEAD: 9/8 at 10 p.m. – 9/9 at 4 a.m. (continuous), There will be lane closures along SR 6 for changing pole at 318 Franklin Road. Hours are adjusted to accommodate businesses who will be without power during this project.
DAVIDSON COUNTY SR 265
The resurfacing on SR 265 (Central Pike) from SR 45 (OHB) to the Wilson County line.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures in both directions for milling and paving operations.
DICKSON COUNTY SR 46
The resurfacing of SR 46 from Robin Hood Rd to near SR 47.
• Daily, 9a.m. – 3 p.m., There will be alternating lane closures in both directions for milling and paving operations (MM 4 – 8).
The construction of a box beam bridge on SR 46 over Yellow Creek.
• Continuous, The bridge will be reduced to one lane in order to demo the existing structure and reconstruct the new bridge. Traffic will be controlled by temporary signals.
MAURY COUNTY SR 6
Realignment of Rock Products Road at SR 6.
• Daily, 9 a.m. – 3 p.m., There will be lane closures in both directions for setting barrier wall for median work.
MONTGOMERY COUNTY SR 149
The repair of the bridge on SR 149 over Yellow Creek.
• Continuous, The bridge will be reduced to one lane in order to demo and reconstruct the old bridge deck. Traffic will be controlled by temporary signals.
MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements. Grading, drainage and construction of retaining walls.
• Daily, 9 a.m. – 3 p.m. There will be temporary lane closures for utility relocation, grading and drainage installation.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)
• Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR 102 to E. of I-840.
• Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 1
The resurfacing on U.S. 70S (from south of Ash Street to near South Rutherford Boulevard)
• Nightly, 8 p.m. – 5 a.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 10
Intersection improvements on SR 10 (US 231) from south of Rock Springs Midland Road to north of Rock Springs Midland Road.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane and shoulder closures in both directions for new turn lane construction.
SUMNER COUNTY SR 6
The resurfacing on US 31E (SR 6) from near Greensboro Drive to south of Joann Street.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures in both directions for clipping shoulders (MM 11-13).
WILLIAMSON COUNTY SR 106
City of Franklin installing water and sewer mains.
• Continuous, There will be lane closures and detours along SR 106 (Lewisburg Pike) in between SR 246 and E. Fowlkes St.
Hillsboro Road intersection improvements for SR 106 intersection.
• Daily, 9 a.m. – 3 p.m., There will be intermittent flagging as needed for grading works.
WILLIAMSON COUNTY SR 11
Clean Reshape Ditches.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane and shoulder closures in both directions (MM 1.67 – 2).
WILLIAMSON COUNTY SR 397
The resurfacing on SR 397 from US 31 (SR 6, Franklin Road) to the bridge over the Harpeth River.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for pavement markings.
WILLIAMSON COUNTY SR 96
Traffic signal Improvements (Local Program)
• Daily, 9 a.m. – 3 p.m. and Nightly, 8 p.m. – 5 a.m., There will be alternating daytime shoulder closures and nighttime lane closures on SR 96 between Eddy Lane and I-65 for traffic signal improvements.
The resurfacing on SR 96 from I-65 to Arno Rd
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions on SR 96 for milling and paving operations.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.