West Tennessee Construction July 31 – August 7, 2024
There will be possible DAYTIME or NIGHTTIME lane closures at various locations in Region 4 to make repairs or new installs on an as needed basis at various locations throughout the 21 counties.
District 47
CARROLL COUNTY
SR-22: The resurfacing on SR 22 from Henderson County Line to near Weatherford Rd. will cause temporary lane closures throughout the project.
CARROLL COUNTY
SR-77: The resurfacing on SR 77 from near McLemoresville Road to the SR22 Bypass in Huntingdon will cause temporary lane closures throughout the project.
BENTON COUNTY
The resurfacing on I-40 from S.R. 69 (MM 126) to the Humphreys County line (Tennessee River Bridge) will cause NIGHTTIME temporary lane closures throughout the project.
DYER COUNTY
SR-20: The repair of bridge on US 412 (SR 20) over the North Fork Forked Deer River will cause temporary lane closures throughout the project.
Restrictions: Beginning April 10, 2023, Traffic will be reduced to one lane in each direction with a 12’ lane restriction and a 5’ shoulder. Speed limit has been reduced to 55 MPH.
GIBSON/CARROLL COUNTY
SR-76 (US-79): The grading, drainage, construction of a concrete box bridge, noise wall and paving on US 79 (SR 76) from west of Cades-Atwood Road in Gibson County to east of SR 77 in Carroll County will cause temporary lane closures throughout the project.
Barker Road is permanently closed at the intersection of the new SR 76 construction, just north of Mt. Olive M.B. Church. Detour following Church St. will be provided until Jax Road is re-opened.
N. Jax Road is now a dead-end road. It is accessed from existing SR 76 and terminates prior to connection with new SR 76 construction.
S. Jax Road is open and is accessed by Oasis Rd. Oasis Road becomes S. Jax road after crossing the new SR 76.
HENRY/WEAKLEY COUNTY
SR-22: The Resurfacing with HOT IN-PLACE RECYCLING on SR 22 from the Carroll County Line in Henry County to SR 217 in Weakly County will cause temporary lane closures throughout the project.
OBION COUNTY
Future I-69 (Phase 3): SR 690 (Future I-69) is now open to traffic. Speed limits have been reduced to 45 mph in the southbound lanes for the transition onto US51. Crews will continue to work on closed ramps to complete construction.
WEAKLEY COUNTY
SR-445: The miscellaneous safety improvements including resurfacing on SR 445 from Gibson County Line to near Losson Puckett Road will cause temporary lane closures throughout the project.
District 48
CROCKETT COUNTY
US-412 (SR-20) from Birmingham/Lyons Road to US-79 (SR-76): Resurfacing with hot-in-place recycling on US-412 (SR-20) will cause temporary lane closures in both directions. One lane will remain open at all times.
GIBSON AND CROCKETT COUNTY
S.R. 152 from U.S 412 (S.R. 20) to U.S. 70A (S.R. 366): Resurfacing on S.R. 152, including bridge expansion joint and bridge deck repairs, will cause temporary lane closures in both directions. One lane will remain open at all times.
HAYWOOD COUNTY
I-40 from MM 60 to 67 (near SR19 to Hawkins Lane)
Wednesday, July 31 through Wednesday, August 7, 7:00 p.m.-6:00 a.m.: Resurfacing work will cause nightly lane closures on I-40 in Haywood County, both east and westbound between mile markers 60-67.
Look Ahead:
Wednesday, August 7 through Wednesday, August 14, 7:00 p.m.-6:00 a.m.: Resurfacing work will cause nightly lane closures on I-40 in Haywood County, both east and westbound between mile markers 60-67.
HAYWOOD COUNTY
SR 179 from US70 (SR1) to SR76: Resurfacing with Full-Depth Reclamation (FDR) on SR179 will cause temporary lane closures in both directions. One lane will remain open at all times.
HAYWOOD COUNTY
SR 222: Monday, June 24 through Monday, August 31. There will be inside lane closures both north and southbound starting from approximately 1600' north of Stanton Somerville RD to the south side of the entrance to the Haywood County Fire Station.
District 49
LAUDERDALE COUNTY
US-51 (SR-3) from SR-88 to the Dyer County Line: Resurfacing work on US 51 will cause temporary lane closures in both directions. At least one lane in each direction will remain open at all times.
LAUDERDALE COUNTY
US-51 (SR-3) from the Tipton County Line to SR-19.: Resurfacing work on US 51 will cause temporary lane closures in both directions. At least one lane in each direction will remain open at all times.
LAUDERDALE COUNTY
SR-19 from US-51 (SR-3) to Near Eastland Avenue.: Resurfacing work on SR 19 will cause temporary lane closures in both directions.
SHELBY COUNTY
I-40 From near the Wolf River MM 11.2 (L.M. 14.73) to near Sycamore View Road MM 12.6 (L.M. 16.13): NIGHTLY, 8:00 p.m.-6:00 a.m.: There will be temporary lane closures on I-40 and Sycamore View Rd. at I-40 for resurfacing. One lane will remain open in each direction at all times. Entrance and exit ramps will be closed intermittently east and westbound with a detour in place.
SHELBY COUNTY
I-40 Hernando Desoto Bridge: Thursday August 1, 9:00 a.m.-3:00 p.m.: There will be temporary lane closures on I-40 over the Mississippi River on the Hernando Desoto Bridge for ITS maintenance. Backup date of following weekday.
SHELBY COUNTY
I-55 at Exit 7: SR-14 (3rd Street) Interchange: Monday, July 29 through Wednesday, August 7: There will be temporary lane closures on I-55 (8pm-6am) and SR-14 (3rd Street) daily for coring activities.
SHELBY COUNTY
SR-3 from near Babe Howard Blvd to the Tipton County Line: NIGHTLY, 7:00 p.m.-6:00 a.m.: There will be temporary lane closures along SR-3 from Babe Howard Blvd. to the Tipton County line to perform resurfacing activities. At least one lane in each direction will remain open at all times.
SHELBY COUNTY
SR-14 (Austin Peay Highway) from Kerrville-Rosemark Rd. to the Tipton County Line: The widening on SR-14 (Austin Peay Hwy) from Kerrville-Rosemark to the Tipton County Line will cause shoulder closures and temporary lane closures in both directions. There will be intermittent lane closures daily on eastbound and westbound SR 14 to perform grading, drainage, and paving work. Tracy Rd, Mulberry Rd, and Gragg Rd. will be closed, and a detour put in place.
SHELBY COUNTY
I-240 at Exit 23 (Airways Blvd): Until August 1, 2024: There will be ongoing temporary lane closures along Airways Blvd. And Ketchum Rd. to perform safety improvements and storm drainage installation activities. At least one lane in each direction will remain open at all times.
SHELBY COUNTY
I-55/Crump: Restrictions: Thursday, September 29, 2022. There is an 11’ width restriction north and southbound on I 55. Necessary detours will be posted.
TRAFFIC PATTERN
I-55 SB outside lane will be closed from the west end of the I-55 Bridge through the project site and the SB inside lane will cross-over at the east end of the I-55 Bridge and share the current I-55 NB cloverleaf ramp with I-55 NB and utilize the inside lane of the future I-55 NB from the cloverleaf to the south end of the project.
- I-55 NB and SB will be a single lane in each direction moving from the existing I55 NB loop to the new flyover.
2. Riverside Dr. NB and SB closed from EH Crump I55 interchange to W Carolina Ave.
3. I-55 NB exit ramp to EH Crump will remain closed.
4. I-55 NB exit ramp to I-55NB will be closed and traffic will be moved to the new flyover.
5. Wisconsin Avenue will be opened.
6. Crump Boulevard from Kentucky St. to Metal Museum Drive will be closed.
7. Metal Museum Drive from Alston to I-55 NB will be closed.
8. Channel 3 ramp to Riverside Drive SB will remain closed.
9. Channel 3 ramp from Riverside Drive SB will remain closed.
SHELBY COUNTY
SR-57 (Poplar Ave.) from Poplar View Pkwy to Eastly Rd: DAILY, 9:00 a.m.-3:00 p.m.: There will be lane closures eastbound and westbound SR 57 in Collierville to adjust catch basins.
SR-57 (Poplar Ave.) from Poplar View Pkwy to Eastly Rd: Nightly, 7:00 p.m.-6:00 a.m.: There will be lane closures eastbound and westbound SR 57 in Collierville to perform striping operations.
SHELBY COUNTY
SR-23 (Walnut Grove Rd) from Poplar Ave. To I-240.: Nightly 7:00 p.m.- 6:00 a.m.: There will be nighttime lane closures east and westbound on Walnut Grove Rd (SR 23) from Poplar Ave to I-240 for resurfacing activities. One lane will remain open in both directions at all times.
SHELBY COUNTY
SR-385 from Ridgeway Road to Byhalia Road.: NIGHTLY 8:00 p.m. - 6:00 a.m.:
There will be temporary lane closures on eastbound and westbound SR 385 from Ridgeway to Byhalia to perform pavement crack sealing. At least one lane in each direction will remain open at all times.
TIPTON COUNTY
US-51 (SR-3) at the intersection of Kenwood Avenue: There will be temporary inside and outside lane closures on north and southbound US 51 at Kenwood Avenue DAILY to allow for safety improvements. At least one lane in each direction will be open at all times.
NON-TDOT WORK
SHELBY COUNTY
SR-177 (Germantown Road) from Brierbrook to the Wolf River: There will be long term lane closures going north and southbound SR 177 to perform widening and intersection improvements. Additional lane closures will be active on Wolf River Blvd. at the intersection with SR-177 (Germantown Rd.).
From your desktop or mobile device, get the latest construction activity and live-streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 for travel information, or follow us on Twitter at https://twitter.com/myTDOT for statewide travel or West Tennessee follow https://twitter.com/NicLawrenceTDOT.
As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel.