Resurfacing and Repairs Close Downtown East Loop on I-24

Wednesday, October 23, 2024 | 10:05am

Nashville, Tenn. - The Tennessee Department of Transportation (TDOT) will be conducting a full road closure in Davidson County on I-24 from I-65 to I-40, also known as the downtown east loop.

Crews with Jones Bros. Construction will conduct a full road closure on I-24 westbound from the I-65 split to the I-40 merge starting Friday, October 25 at 8 p.m. until Monday, October 28 at 5 a.m. Crews will conduct this same closure in eastbound lanes starting Friday, November 8 at 8 p.m. until Monday, November 11 at 5 a.m. The work is needed to resurface I-24 and repair bridge expansion joints. Traffic will be detoured to the west loop.
 

Map showing closure on I-24 and detour around it.

Even with detours in place to navigate the closure, motorists should allow additional time when driving through this already heavily traveled area.

All work is weather-dependent. As always, drivers are reminded to slow down and move over when traveling through a work zone. The Move Over Law was passed in 2006. The penalty for violating the law in Tennessee carries the possibility of up to 30 days in jail and a maximum fine of up to $500.

Get the latest construction activity traffic updates from the TDOT SmartWay map (https://smartway.tn.gov). Travelers can also call 511 for travel information.