S-GRC-5

GUARDRAIL CONNECTION TO BRIDGE ENDS (TRAILING ENDS)
S-GRC-5

(Click image to open PDF)

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
S-GR31-1W-BEAM GUARDRAILFOR BRIDGE RAILING DETAILS
S-PL-3SAFETY PLAN: MINIMUM INSTALLATION AT BRIDGE ENDSFOR ALL OTHER GUARDRAIL DETAILS AND MATERIAL PROPERTIES NOT SHOWN
S-SSMB-6GUARDRAIL ATTACHMENT TO SINGLE SLOPE CONCRETE BARRIER WALLFOR CONNECTION TO CONCRETE BARRIER WALLS

Related Item Numbers

ITEM NO.U/MDESCRIPTIONREMARKS
705-06.01L.F.W BEAM GR (TYPE 2) MASH TL3 
706-10.80EACHMICHIGAN AND MODIFIED MICHIGAN END SHOE 
    

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
06-28-2019 | 02-28-2020