GPSD Inspection and Investigation
The purpose of the TPUC Gas Pipeline Safety Division GPSD inspection process is to minimize risks to public safety associated with the accidental release of gas.
Exit Interview Summary (pdf)
Inspection Affidavit (pdf)
Master Meter Standard Report (pdf)
Operator Qualification Protocol 9 (pdf)
Plastic Construction Checklist (pdf)
RRO Report (pdf)
Steel Construction Checklist (pdf)
Transmission Standard Report (pdf)