West Tennessee Weekly Construction January 1-7, 2015

Friday, January 02, 2015 | 06:12am

DYER COUNTY, SR-3:  Resurfacing work will cause temporary lane closures in both directions daily, from Biffle Road to South of State Route 105. State Route 3 speed limit has been reduced to 60 MPH.

DYER COUNTY, SR-104:  Bridge Repair on State Route 104 over Lewis Creek Canal. A signal system will be utilized. Speed limit has been reduced to 30 MPH. Beginning January 05, 2015, State Route 104 over Jones Creek, traffic will be reduced to one lane with a 10’ 9” lane restriction.

DYER COUNTY, SR-182:  State Route 182, bridge over Coon Creek is CLOSED. Detour route is posted.

DYER COUNTY, SR-211:  Resurfacing work will cause temporary lane closures in both directions daily, from State Route 77 to State Route 105. Flagmen will be present.

FAYETTE COUNTY, I-40, Interchange at SR 222:  Wednesday December 31 through Wednesday January 7:  The east and westbound shoulders at Exit 42 are CLOSED.

FAYETTE COUNTY, SR-193:  Resurfacing work will cause temporary lane closures in both directions daily, from the Shelby County line to State Route 194.

FAYETTE COUNTY, SR-196:  Resurfacing work will cause temporary lane closures in both directions daily, from (US-64) State Route 15 to the junction of State Route 196 and Hickory Withe Road.

FAYETTE and HAYWOOD COUNTY, SR-222:  A grading project on State Route 222 from north of I-40 to south of Camp Ground Road. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

FAYETTE and SHELBY COUNTY, (SR-385) Future I-269:  Construction of I-269 from the interchange with State Route 385 to the Mississippi State line. State Route 385 is reduced to one lane in each direction for bridge construction. The project intersects with US 72 (State Route 86) in the area of the Mann Road intersection. State Route 86 is reduced to one lane in each direction for bridge construction in the median. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

HARDIN COUNTY,  SR-15 (US-64):  A widening project on State Route 15 from Firetower Road to west of Bigbee Branch. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

HAYWOOD COUNTY,  I-40:  Construction at State Route 76 and I-40 at the weigh station.

LAUDERDALE COUNTY, SR-88:  Resurfacing work will cause temporary lane closures in both directions daily, from Edith-Nankipoo Road to State Route 210.

LAUDERDALE COUNTY, SR-208:  A widening project on State Route 208 (State Route 209/Cleveland Street) beginning at State Route 209 (Washington Street) and extending to State Route 208 at US-51/State Route 3 in Ripley. There will be temporary lane closures daily.

MCNAIRY COUNTY-SR-57:  A bridge replacement project will cause a reduction in lanes in both directions on State Route 57. Traffic is reduced to one lane, with a temporary signal, for duration of the project.

OBION COUNTY, SR-431:  Resurfacing work will cause possible temporary lane closures in both directions daily, from the North Fork Obion River bridge to US-51 (State Route 3).

SHELBY COUNTY, I-40 Bridge over MS River Phase 8:

Wednesday December 31 through Wednesday January 7: 

Exit 1A – Westbound I-40 to 2nd Street – is open, but has a narrow left shoulder; use caution.

Exit 1 – Westbound I-40 to Riverside Drive – is open, but has a narrow left shoulder; use caution.

The entrance to Eastbound I-40 from Riverside Drive is open, but has a narrow right shoulder; use caution.

LOOK AHEAD: Wednesday January 7 through Wednesday February 4:

A lane will be closed on I-40 eastbound Exit 1 (to Riverside Drive and Front Street). Please note that the EXIT will remain open. It will just be a one-lane exit for a short duration and traffic exiting at this location can still go to either Riverside Drive or Front Street.

SHELBY COUNTY, I-40 Bridge over MS River Phase 9:

Wednesday December 31 through Wednesday January 7: 

Traffic on the Hernando DeSoto Bridge over the Mississippi River will continue to be reduced to two narrow lanes in both directions for over a mile through the work zone. Westbound traffic will be in two narrow lanes on the north side of the bridge. Eastbound traffic will be in two narrow lanes on the south side of the bridge. The work zone will be in the center of the bridge. Motorists are advised to slow down to 45 miles per hour through the shift.

SHELBY COUNTY, I-40 at Canada Road

Wednesday December 31 through Wednesday January 7:  I-40 speed limit has been reduced to 55 MPH. Currently there is paving in the median on I-40 east and west of the bridge. There are barrier rail placed on the westbound entrance ramps to I-40 but not impeding traffic. There are lane shifts eastbound and westbound on I-40. Beginning December 05, there are transitions southbound and northbound on Canada Road shifting from two lanes to one lane.

SHELBY COUNTY, I-240 North of SR-385 to North of Walnut Grove Rd.:

Monday January 5 through Thursday January 8, 8:00 p. m.-6:00 a. m.  Two left or two right lanes of eastbound or westbound I-240 from BOP to EOP for final striping and or installation of snowplowable pavement markers Weather Permitting.

SHELBY COUNTY, I-40/I-240 Phase 2 Interchange Improvements:

Summer Avenue: The right lane east and westbound is CLOSED in both directions, beginning just west of the existing I-240 northbound bridge over Summer Avenue to allow for construction access.

Sam Cooper EB: The left lane of Sam Cooper Boulevard Eastbound is CLOSED, beginning east of Perkins Road to the I-40/I-240 interchange.

Sam Cooper WB: The left lane of Sam Cooper Boulevard Westbound is CLOSED, beginning east of the I-40/I-240 interchange.

I-240:  There are shoulder closures in both directions of I-240 between Walnut Grove and I-40 interchange.  One lane of northbound I-240 is also CLOSED in this same section.

I-40 WB: The outside shoulder is closed from Sycamore View to the Wolf River Bridge for construction access.

LOOK AHEAD:  Saturday January 10 & Sunday January 11, 6:30 a. m.-5:30 p. m.The right and middle lanes of northbound I-240/westbound I-40 will be CLOSED, beginning south of Exit 12C to allow for removal of portable barrier rail, grinding of existing pavement marking and installation of pavement marking. Upon completion, the left and middle lanes of northbound I-240/westbound I-40 will be CLOSED, beginning south of Exit 12C, to allow for grinding of existing pavement marking and installation of pavement marking. Exits 12C, 12B, and 12A will remain open during both parts of this work.

SHELBY COUNTY, SR-1 (US-51):  Wednesday December 31 through Wednesday January 7: There are no scheduled closures.

SHELBY COUNTY, SR-14 (US-61):  A bridge repair project on State Route14 over I-55 and on South Parkway West over I-55.

Wednesday December 31 through Wednesday January 7:  The northbound and southbound shoulders are closed for expansion joint repairs.

SHELBY COUNTY, SR-86 (US-72)Construction on State Route 86 (US-72) for a widening project north of Quinn Road to State Route 57 (Poplar Avenue) in Collierville. Traffic is reduced to one lane in each direction.  South Rowlett Street is closed to through traffic in the vicinity of the State Route 86 bridge over the Norfolk Southern Railroad.  Motorists may use Wilson Street to Harris Street as a detour.

SHELBY COUNTY, Grade, drain, pave SR-177 (Germantown Rd); Crestridge Rd to Stout Rd:

Tuesday January 6 & Wednesday January 7:  There will be intermittent lane closures on State Route 177 (Germantown Road), between Germantown City Limits (LM-1.65) to Stout Road (LM-2.40). The closures will be intermittent and for as short a time as possible.

SHELBY COUNTY, SR-385:  Bridge Repair (2) on State Route 385 over Loosahatchie River. Traffic is reduced to one northbound and one southbound lane; a twelve (12’) lane will be maintained in each direction.  Speed limit has been reduced to 55 MPH.

Tuesday January 6 & Wednesday January 7:  Bridge Repair (2) on State Route 385 over Memphis-Arlington Road & Hall Creek. A traffic shift will cause traffic to move on both east and westbound bridges.

TDOT REGION 4, On-Call Guardrail Repair and Concrete Barrier Rail Wednesday December 31 through Wednesday January 7:  There are no scheduled closures.

TDOT REGION 4, On-Call Repair of Longitudinal Cable Rail: Wednesday December 31 through Wednesday January 7: There are no scheduled closures.

TDOT REGION 4 Retracing of Pavement Marking with Paint: Wednesday December 31 through Wednesday January 7:  There are no scheduled closures.

TDOT MAINTENANCE:

Tuesday January 6 & Wednesday January 7, 9:00 a. m.-4:00 p. m.  There will be possible lane closures at various locations in Region IV in order to patch potholes on an as needed basis. Weather Permitting.

For more information on TDOT road construction projects or to view travel conditions visit the TDOT SmartWay Information System web site (http://www.tn.gov/tdot/tdotsmartway/). Motorists can also dial 511 from any land-line or cellular phone to access up to date traffic conditions.  TDOT is also now on Twitter.  For up to date traffic tweets for the Jackson & Memphis areas follow Memphis511 (http://twitter.com/memphis511).  For statewide traffic information follow TN511 (http://twitter.com/TN511).  Also, for smart phone users, TDOT has a new mobile site that provides simple and easy access to TDOT's SmartWay cameras, message boards, accident information, and construction information.  Go to:  http://m.tdot.tn.gov/SmartWay/

Motorists are reminded to use all motorist information tools responsibly.  Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.  TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.  All scheduled work is subject to change due to adverse weather conditions or other conditions beyond the control of the contractor.

Press Releases | Road Closures