Middle Tennessee Construction December 15 – December 21, 2011

Thursday, December 15, 2011 | 01:20pm
DAVIDSON COUNTY, I-440 Eastbound from I-65 to I-24
  • Thursday December 15 through December 21: No closures scheduled.
 
DAVIDSON COUNTY, Repair of 14 Bridges over I-440
  • Thursday December 15 and Friday December 16, 9AM-3PM, There will be shoulder closures on I-440 eastbound at Richardson Rd., Hillsboro Rd., Belmont Blvd., Winford Rd., and Lyle Rd. for bridge work. 
  • Saturday December 17 and Sunday December 18, 7AM-6PM, There will be lane shifts on Richardson Rd. bridge in order to perform ramp repairs.
 
DAVIDSON & SUMNER COUNTIES, Miscellaneous Safety Improvements on SR 386
  • Sunday December 18 through Wednesday December 21, 8PM-6AM, There will be alternating lane closures on SR 386 beginning at I-65 in Davidson County to SR 174 (Long Hollow Pike) in order to perform striping and installation of snow plowable markers. One lane will remain open.
 
DAVIDSON COUNTY, Resurfacing on SR 6 from Church Street to SR 155
  • Thursday December 15 through Saturday December 17, 8PM-5AM, There will be one lane closed in each direction on the Victory Memorial Bridge on James Robertson Pkwy. in order to install bridge drains and bike grates.
 
DAVIDSON COUNTY, Central Pike from US 70 to Stoners Creek
  • Thursday December 15 through Wednesday December 21, 9AM-3PM, There will be alternating lane closures on Central Pike from Lebanon Rd to Stoner’s Creek in order to install pipe and perform grading work. Flaggers will be utilized.
 
RUTHERFORD COUNTY, Widening of Waldron Road (Recovery Act Project)
  • Thursday December 15 through December 21: No closures scheduled.
 
WILLIAMSON COUNTY, Widening of I-65 from SR 248 (Goose Creek) to SR 96
  • Thursday December 15 through December 21: No closures scheduled.
 
WILLIAMSON COUNTY, Construction on SR 397 (Mack Hatcher Pkwy.) from south of SR 96 to SR 6
  • Monday December 19 through Wednesday December 21, 10AM-11AM and 1PM-2PM, There will be lane closures on SR 397 in order for the contractor to blast.
 
DAVIDSON & WILSON COUNTIES, Miscellaneous Safety Improvements
  • Thursday December 15 and Friday December 16, 9AM-3PM, There will be lane closures to install various thermoplastic striping along SR100 LM 10.96 to 12.17. Special Note: The side roads affected will be West Tyne Drive and Heady Drive (for stop bars and arrows).
 
WILSON COUNTY, SR-171 (Mt Juliet Road) Widening: (Recovery Act Project)
  • Thursday December 15 through Wednesday December 21, 9AM–3PM, There will be temporary lane closures on Mt. Juliet Road (SR-171) southbound, from Division Street to Curd Rd. for installation of curb & gutter.
 
 
 
WILSON & SUMNER COUNTIES, Bridge Construction on SR 109 over the Cumberland River
  • Thursday December 15 through Wednesday December 21, 8PM- 6AM, The northbound lane of SR 109 will be closed in order to pour concrete.
 
TDOT Maintenance:
Davidson County 
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM, There will be possible lane closures at various locations in Davidson County in order to patch potholes on an as needed basis.  
Hickman County
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-40 in both direction in Hickman County between mile marker 148 and mile marker 163 in order to patch potholes on an as needed basis. One lane will remain open.
Humphreys County
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-40 in both direction in Humphreys County between mile marker 134 and mile marker 148 in order to patch potholes on an as needed basis. One lane will remain open.
Robertson County
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-65 in both direction in Robertson County between mile marker 103.72 (Robertson and Sumner County line) and mile marker 121.47 (Tennessee and Kentucky State line) in order to patch potholes on an as needed basis. One lane will remain open.
Cheatham County
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM,There will be temporary lane closures on I-40 in both direction in Cheatham County between mile marker 184.4 (Cheatham and Williamson County line) and mile marker 191.5 (Cheatham and Davidson County line) in order to patch potholes on an as needed basis. One lane will remain open.
Cheatham, Montgomery & Robertson Counties 
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-24 in both direction in Cheatham, Montgomery and Robertson Counties between mile marker 10 (Exit 11 Adams, Clarksville) and mile marker 32 (Cheatham and Davidson County line), in order to patch potholes on an as needed basis. One lane will remain open.
Dickson County
  • Thursday December 15 through Wednesday December 21, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-40 in both direction in Dickson County between mile marker 182 and mile marker 163 in order to patch potholes on an as needed basis. One lane will remain open.
 
TDOT Utilities
  • Now through Friday January 6, 2012, 9AM-7PM,(excluding weekends), On SR-65, Whites Creek Pike, starting 4100' north of Old Hickory Blvd to Knight Drive in Davidson County. This request, by Garney Construction is to open-cut for installation of 16" water main with service line renewals.
  • Thursday December 15 through Thursday December 22, 7PM to 6AM, On Nolensville Pike in Davidson County. This request by AT&T to place conduit and cable by directional bore, at various locations starting at Nolensville Pike & Old Hickory BLVD to Nolensville Pike at Ensley Blvd. ,repairing sidewalks, closing outside lane over Nolensville Road Bridge over Mill Creek S.B.L..
 
Geotechnical Drilling on I-65 at Trinity Lane
  • Thursday December 15 through Wednesday December 21, 8PM-5AM, There will be alternating lane closures on I-65 north and southbound just north of the Trinity Lane exit in order to perform geotechnical drilling for future project design. Three lanes will remain open.
 
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather.

For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.

Press Releases | Road Closures