Middle Tennessee Construction October 29 – November 4, 2009

Thursday, October 29, 2009 | 09:21am
DAVIDSON COUNTY, I-40 and Robertson Road Interchange:(Recovery Act Project)
       Thursday October 29 and Friday October 30, 8PM-6AM, On the I-40 Westbound on-ramp at White Bridge flagging of traffic will occur to allow placement of barrier rail.
       Monday November 2 through Wednesday November 4, 10AM and 1PM, each day, Rolling roadblocks for I-40 East bound and Westbound traffic for blasting operations on the north side of I-40 in the White Bridge Road area. Traffic will also be stopped on Robertson Rd., Urbandale Ave., and White Bridge Rd.
 
DAVIDSON COUNTY, I-440 Concrete Rehabilitation:(Recovery Act Project)
       No Closures Scheduled.
 
DAVIDSON COUNTY, Resurfacing on I-40 from US 70S to Charlotte Pike:(Recovery Act Project)
       Thursday October 29 through Wednesday November 4, 8PM-5AM, (excluding Saturday), There will be alternating lane closures on I-40 in both directions in order to mill and pave the roadway. One lane will remain open.
 
REGION 3 On-Call Guardrail:
       Thursday October 29 through Wednesday November 4, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Maury, Marshall, Smith, Giles and Robertson, Counties for guardrail repair and installation.                  
       Thursday October 29 through Wednesday November 4, 9AM-4PM, There will be various shoulder closures in Middle Tennessee on state routes for guardrail repair and installation.
 
DAVIDSON COUNTY, Installation of an Overhead Sign on I-40 (Lu, Inc.)
       Saturday October 31, 11PM-5AM, On I-40 eastbound at MM 209, there will be 5 rolling roadblocks in order to install an overhead sign. Police officers will be utilized for this operation.
       Saturday October 31, 11PM-5AM, On I-40 westbound at MM 226, there will be 1 rolling roadblock in order to work on an overhead sign. Police officers will be utilized for this operation.
 
REGION 3, Installation of Cable Barrier:
       Thursday October 29 and Friday October 30, 8PM-6AM, each night, There will be alternating lane closures on I-24 eastbound in Coffee County from MM 103 to MM 105 in order to install cable barrier. One lane will remain open.
 
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
       Thursday October 29 through Wednesday November 4, 9AM-3PM and 7PM-6AM. There will be periodic day and night time shoulder closures at various locations within the areas listed below in order to install devices, perform electrical work, and pole installation.
o    Briley Parkway, both directions between I-40 and Centennial Blvd (MM 6 to MM 27)
o    I-24, both directions between Old Hickory Blvd and Bell Road (MM 40 to MM 61)
o    I-40, both directions between US-70 and Old Hickory Blvd (MM 196 to MM 222)
o    I-65, both directions between Concord Rd and Long Hollow Pike (MM 70 to MM 97)
o    I-440, both directions between Hillsboro Pike and I-24 (MM 3 to MM 7)
o    Ellington Parkway, both directions between Briley Pkwy and Spring Street
       Thursday October 29 through Wednesday November 4, 8PM-5AM, There will be periodic short term night time lane closures at the following locations to install device foundations, DMS foundation installation, and shoulder paving.
o    Briley Pkwy, both directions, between Elm Hill Pike and Brick Church Pike, (MM 7 to MM 27), 3 lanes remain open (multiple locations for structures and shoulder work).
o    I-40, both directions, between the I-24 Interchange and Old Hickory Blvd (MM 213 to MM 222), 3 lanes remain open (multiple locations for foundation installation).
o    I-40, Westbound, between US70S and east of Charlotte Pike (MM 196 to MM 203), 2 lanes remain open. (multiple locations for foundation installation).
o    I-40, both directions, between Briley Pkwy and Spence Lane (MM 215 to 213)
·         Friday 8pm to Monday 5am, one left lane closed in both directions for median foundation work.
    • I-65, both directions, between Concord Rd and the I-440 Interchange (MM 71 to MM 80), 2-3 lanes remain open (multiple locations for foundation installation).
    • I-24, both directions, between the I-440 Interchange and Old Hickory Blvd (MM 52 and MM 62), 2-3 lanes remain open (multiple locations for foundation installation.)
    • I-440, both directions, between Nolensville Rd and I-24, (MM 6 and MM 7)
·         Wednesday & Thursday, Monday & Tuesday, possible double right or left lane closures to install conduit on Bridge Crossing I-440, one direction at a time.
 
REGION 3 Retracing of Painted Markings on Interstate and State Routes
       Thursday October 29 through Thursday November 5, 8AM-5PM each day,There will be various rolling closures in Cheatham, Dickson, Montgomery, Robertson, Davidson and Williamson Counties on State Routes in order to retrace pavement marking.
 
WILLIAMSON COUNTY, Concord Rd. from Sunset Rd. to Edmondson Pike
       Thursday October 29 through Wednesday November 4, 9AM-3PM, (excluding weekends), There will be alternating lane closures from Governor’s Way to Sunset Rd. in order to install storm drainage. Also, possible one lane closures from Edmondson Pike to Beech Grove Rd. for water line installation. Trucks will be entering and leaving the roadway. Flaggers will be utilized for these operations.
 
DAVIDSON COUNTY, TDOT Maintenance:
Davidson County
       Thursday October 29 through Wednesday November 4, 9AM-3PM, (excluding weekends), There will be possible lane closures at various locations in Davidson County in order to patch potholes on an as needed basis.
       Thursday October 29 through Wednesday November 4, 9AM-3PM, (excluding weekends), There will be mobile operations in various locations in Davidson County for vegetation control. This will affect the shoulders or outside lanes.
       Thursday October 29 through Wednesday November 4, 7PM-6AM, (excluding weekends), There will be alternating lane  closures on I-65 southbound between I-24 and Rosa L. Parks Blvd. for milling and paving.  One lane will remain open.
Sumner County
       Monday November 2 and Tuesday November 3, 7PM-5AM, I-65 northbound in Sumner County at Log Mile 97.0. The right lane will be closed for grinding and paving. One lane will remain open.
Montgomery County
       Thursday October 29 through Wednesday November 4, 9AM-3PM, There will be intermittent lane closures on State Route 112 (U.S. 41 A) from the 12.8 M.M. (Porters Bluff) to the 13.0 M.M. (Pagent Lane) for the City of Clarksville to do sidewalk repair.
 
THOMAS & ASSOCIATES: Thursday October 29 through Wednesday November 4, each day, 2PM, There will be rolling roadblocks on I-24 eastbound and westbound near Waldron Rd. (Exit 64) for blasting. Local police officers will be utilized for this operation.
 
DAVIDSON COUNTY, TDOT Utilities:  
       Monday October 26 through Friday October 30, 9AM-3PM, On SR-6, Franklin Road from Bradford Avenue for 3700' to Berry Road, Davidson County.  This request, by N.E.S. is for replacement of poles, anchors and conductor.  Various lane closures are expected throughout the day.
       Monday November 2 through Friday November 6, 9AM-3PM, On SR-6, Franklin Road from Bradford Avenue for 3700' to Berry Road, Davidson County.  This request, by N.E.S. is for replacement of poles, anchors and conductor.  Various lane closures are expected throughout the day.
       Monday November 2 through Friday November 6, 9AM-3PM, On SR-254, Old Hickory Blvd. from Stone Brook Drive to Franklin Pike, Davidson County.  This request, from N.E.S., is for replacement of poles and anchors, transferring line.  Various lane closures are expected throughout the day.
       Saturday October 31, 6:30AM-6:30PM, There will be one lane closed on Hillsboro Rd. (SR 106) in Williamson County just south of Old Hickory Blvd. for utility work. One lane will remain open. Police officers will be utilized for this operation.
       Sunday November 1 through Thursday November 5, 7PM-6AM, On SR-6 Franklin Pike, from Church Street to Old Hickory Blvd. and Franklin Pike Interchange, Davidson County.  This request, from N.E.S., is for pole replacements, transferring conductors and installing fiber optic cable.
 
 
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather.

For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly.  Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.

Press Releases | Road Closures