Skip to Main Content

Box Culvert

Previous Drawings (For Reference Only)

This section is for all projects having either concrete box and/or slab culverts or bridges projects that began preliminary engineering before October 2010.

BOX CULVERTS

DRAWING REVISION DATE DESCRIPTION
STD-15-1 11/06/2008 INDEX OF DRAWINGS AND TERMINOLOGY
STD-15-2 03/28/2008 GENERAL NOTES
STD-15-3 02/28/2003 DESIGN SECTION LIMITS
STD-15-4 12/07/2001 TYPICAL SECTION AND DETAILS
STD-15-5 02/28/2003 TYPICAL ELEVATION
STD-15-6 03/28/2008 CURB AND RAIL DETAILS SKEW NOT LESS THAN 45 DEG.
STD-15-7 03/02/2002 STANDARD EDGE BEAM DETAILS FOR FILLS GREATER THAN 3’ - 8”
STD-15-8 12/07/2001 INTERIOR WALL END TREATMENTS
STD-15-9 02/28/2003 TYPICAL WINGWALL DETAILS AND NOTES
STD-15-10 11/06/2008 WINGWALL DIMENSIONS AND QUANTITIES
STD-15-11   WINGWALL DIMENSIONS AND QUANTITIES
STD-15-12 03/28/2008 WINGWALL & SPECIAL RETAINING WALL DESIGN SECTION
STD-15-13   WINGWALL DESIGN SECTION
STD-15-14 06/01/2011 BACKFILL AND DRAINAGE DETAILS
STD-15-15   BACKFILL AND DRAINAGE DETAILS
STD-15-16 12/07/2001 PAVED OUTLET DETAILS
STD-15-16A   LOW FLOW CHANNEL CONSTRUCTION DETAILS FOR CULVERT INLET AND OUTLET
STD-15-17   DEBRIS DEFLECTION WALL
STD-15-18   DEBRIS DEFLECTION WALL
STD-15-19   SIDEWALK AND MISCELLANEOUS DETAILS
STD-15-20   WARPED SLOPE DETAIL
STD-15-21 03/02/2002 STAGE CONSTRUCTION JOINT DETAIL (FILL ABOVE TOP OF SLAB NOT GREATER THAN 3’-8”)
STD-15-22 02/28/2003 EXTENSION DETAILS
STD-15-23 12/07/2001 EXTENSION DETAILS FOR SCOURED OUTLET
STD-15-24 12/07/2001 END SECTION DETAILS
STD-15-25 11/01/2010 PRECAST BOX CULVERT DETAILS
STD-15-26   PRECAST BOX CULVERT DETAILS
STD-15-27   PRECAST BOX CULVERT DETAILS
STD-15-28   PRECAST BOX CULVERT DETAILS
STD-15-29   PRECAST BOX CULVERT DETAILS
STD-15-30   STANDARD INTERNAL ENERGY DISSIPATOR FOR BOX AND PIPE CULVERTS
STD-15-35   BOX BRIDGE, 1 BARREL AT 6’, CLEAR HTS. 3’ - 6’, 0 - 60’ FILL
STD-15-36   BOX BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 3’ - 4’, 0 - 60’ FILL
STD-15-37 05/01/2014 BOX BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 5’ - 8’, 0 - 60’ FILL
STD-15-38 09/19/2006 BOX BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 4’ - 6’, 0 - 60’ FILL
STD-15-39   BOX BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 7’ - 10’, 0 - 60’ FILL
STD-15-40   BOX BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 4’ - 7’, 0 - 60’ FILL
STD-15-41   BOX BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 8’ - 12’, 0 - 60’ FILL
STD-15-42   BOX BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 5’ - 7’, 0 - 60’ FILL
STD-15-43   BOX BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 8’ - 11’, 0 - 60’ FILL
STD-15-44   BOX BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 12’ - 14’, 0 - 60’ FILL
STD-15-45   BOX BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-46   BOX BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 9’ - 12’, 0 - 60’ FILL
STD-15-47   BOX BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 13’ - 16’, 0 - 60’ FILL
STD-15-48   BOX BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-49   BOX BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 9’ - 13’, 0 - 60’ FILL
STD-15-50   BOX BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 14’ - 18’, 0 - 60’ FILL
STD-15-55   BOX BRIDGE, 2 BARRELS AT 6’, CLEAR HTS. 3’ - 6’, 0 - 60’ FILL
STD-15-56   BOX BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 3’ - 4’, 0 - 60’ FILL
STD-15-57   BOX BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 5’ - 8’, 0 - 60’ FILL
STD-15-58 06/01/2011 BOX BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 4’ - 6’, 0 - 60’ FILL
STD-15-59   BOX BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 7’ - 10’, 0 - 60’ FILL
STD-15-60   BOX BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 4’ - 7’, 0 - 60’ FILL
STD-15-61   BOX BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 8’ - 12’, 0 - 60’ FILL
STD-15-62   BOX BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 5’ - 7’, 0 - 60’ FILL
STD-15-63   BOX BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 8’ - 11’, 0 - 60’ FILL
STD-15-64   BOX BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 12’ - 14’, 0 - 60’ FILL
STD-15-65   BOX BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-66   BOX BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 9’ - 12’, 0 - 60’ FILL
STD-15-67   BOX BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 13’ - 16’, 0 - 60’ FILL
STD-15-68   BOX BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-69   BOX BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 9’ - 13’, 0 - 60’ FILL
STD-15-70   BOX BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 14’ - 18’, 0 - 60’ FILL
STD-15-75   BOX BRIDGE, 3 BARRELS AT 6’, CLEAR HTS. 3’ - 6’, 0 - 60’ FILL
STD-15-76   BOX BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 3’ - 4’, 0 - 60’ FILL
STD-15-77 12/07/2001 BOX BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 5’ - 8’, 0 - 60’ FILL
STD-15-78 12/07/2001 BOX BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 4’ - 6’, 0 - 60’ FILL
STD-15-79 12/07/2001 BOX BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 7’ - 10’, 0 - 60’ FILL
STD-15-80   BOX BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 4’ - 7’, 0 - 60’ FILL
STD-15-81   BOX BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 8’ - 12’, 0 - 60’ FILL
STD-15-82   BOX BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 5’ - 7’, 0 - 60’ FILL
STD-15-83   BOX BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 8’ - 11’, 0 - 60’ FILL
STD-15-84   BOX BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 12’ - 14’, 0 - 60’ FILL
STD-15-85   BOX BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-86   BOX BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 9’ - 12’, 0 - 60’ FILL
STD-15-87   BOX BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 13’ - 16’, 0 - 60’ FILL
STD-15-88   BOX BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-89   BOX BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 9’ - 13’, 0 - 60’ FILL
STD-15-90   BOX BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 14’ - 18’, 0 - 60’ FILL
STD-15-95   SLAB BRIDGE, 1 BARREL AT 6’, CLEAR HTS. 3’ - 6’, 0 - 60’ FILL
STD-15-96   SLAB BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 3’ - 4’, 0 - 60’ FILL
STD-15-97   SLAB BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 5’ - 8’, 0 - 60’ FILL
STD-15-98   SLAB BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 4’ - 6’, 0 - 60’ FILL
STD-15-99 02/28/2003 SLAB BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 7’ - 10’, 0 - 60’ FILL
STD-15-100 02/28/2003 SLAB BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 4’ - 7’, 0 - 60’ FILL
STD-15-101 02/28/2003 SLAB BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 8’ - 12’, 0 - 60’ FILL
STD-15-102   SLAB BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 5’ - 9’, 0 - 60’ FILL
STD-15-103   SLAB BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 10’ - 14’, 0 - 60’ FILL
STD-15-104   SLAB BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-105   SLAB BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 9’ - 12’, 0 - 60’ FILL
STD-15-106   SLAB BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 13’ - 16’, 0 - 60’ FILL
STD-15-107   SLAB BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-108   SLAB BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 9’ - 13’, 0 - 60’ FILL
STD-15-109   SLAB BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 14’ - 18’, 0 - 60’ FILL
STD-15-115 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 6’, CLEAR HTS. 3’ - 6’, 0 - 60’ FILL
STD-15-116 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 3’ - 4’, 0 - 60’ FILL
STD-15-117 06/01/2011 SLAB BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 5’ - 8’, 0 - 60’ FILL
STD-15-118 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 4’ - 6’, 0 - 60’ FILL
STD-15-119 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 7’ - 10’, 0 - 60’ FILL
STD-15-120 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 4’ - 7’, 0 - 60’ FILL
STD-15-121 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 8’ - 12’, 0 - 60’ FILL
STD-15-122 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 5’ - 7’, 0 - 60’ FILL
STD-15-123 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 8’ - 11’, 0 - 60’ FILL
STD-15-124 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 12’ - 14’, 0 - 60’ FILL
STD-15-125 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-126 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 9’ - 12’, 0 - 60’ FILL
STD-15-127 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 13’ - 16’, 0 - 60’ FILL
STD-15-128 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-129 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 9’ - 13’, 0 - 60’ FILL
STD-15-130 02/28/2003 SLAB BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 14’ - 18’, 0 - 60’ FILL
STD-15-135   SLAB BRIDGE, 3 BARRELS AT 6’, CLEAR HTS. 3’ - 6’, 0 - 60’ FILL
STD-15-136   SLAB BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 3’ - 4’, 0 - 60’ FILL
STD-15-137   SLAB BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 5’ - 8’, 0 - 60’ FILL
STD-15-138   SLAB BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 4’ - 6’, 0 - 60’ FILL
STD-15-139   SLAB BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 7’ - 10’, 0 - 60’ FILL
STD-15-140   SLAB BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 4’ - 7’, 0 - 60’ FILL
STD-15-141   SLAB BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 8’ - 12’, 0 - 60’ FILL
STD-15-142   SLAB BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 5’ - 7’, 0 - 60’ FILL
STD-15-143   SLAB BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 8’ - 11’, 0 - 60’ FILL
STD-15-144   SLAB BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 12’ - 14’, 0 - 60’ FILL
STD-15-145   SLAB BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-146   SLAB BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 9’ - 12’, 0 - 60’ FILL
STD-15-147   SLAB BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 13’ - 16’, 0 - 60’ FILL
STD-15-148 12/07/2001 SLAB BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 6’ - 8’, 0 - 60’ FILL
STD-15-149 12/07/2001 SLAB BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 9’ - 13’, 0 - 60’ FILL
STD-15-150 12/07/2001 SLAB BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 14’ - 18’, 0 - 60’ FILL

If you find any mistakes, missing information or have a question, contact:
Structures Division
Houston Walker, P.E.
1100 James K. Polk Building
Nashville, TN 37243
Phone: 615-741-5335
Email: Houston.Walker@tn.gov

This Page Last Updated: December 7, 2017 at 10:33 AM