State Route 4 (US 78) Lamar Avenue
Shelby CountyTimeline
Transportation projects are developed in three phases: Preliminary Engineering, Right-of-Way (ROW) and Construction. Due to the significant size of the State Route 4 (US 78/Lamar Avenue) project, the proposed improvements have been separated into three smaller sections or phases. Below is a summary of the current status of each section.
LOCATION | PHASE | DATES* |
---|---|---|
from Mississippi state line to Shelby Drive | Construction |
Estimated Completion - July 2023 |
from Shelby Drive to Raines/Perkins Road Interchange | ROW | Forecasted for Construction - Fall 2022 |
from Raines/Perkins Road Interchange to SR 176 (Getwell Road) | Preliminary Engineering | Forecasted for Construction - Fall 2023 |
*All forecasted dates are subject to change.