2021 Flood Recovery - Humphreys & Hickman County Bridges

recovery bridge map2

Below is a list of the TDOT bridge repair and replacement projects that were impacted or caused by the 2021 flood in Humphreys and Hickman County.

LOCATION

SCOPE OF WORK

ANTICIPATED LETTING

Humphreys Co. - SR-13, Church St (Viaduct bridge)

Bridge Replacement      

Summer 2023

 

Humphreys Co. - Waverly Bypass/US-70

Fence Replacement       

 

In Progress
Completion date: 6/30/22

 

Humphreys Co. - Various State Routes 

Guardrail Repair/Replacement In Progress
Completed

Humphreys Co. - US-70/SR-1 - Bridges over Trace Creek (near Scepter Rd)

Bridge Replacement

Winter 2022-2023

Humphreys - Bakerville Road - Bakerville Road over Duck River

 

Bridge Replacement      

 

Summer 2023

 

Humphreys Co. - East Blue Creek Road Bridge over Blue Creek

 

Bridge Replacement - Construction of a 2-lane, 100-foot three span prestressed concrete girder bridge with shoulders           

Winter 2022/23

 

Humphreys Co. East Blue Creek Road Bridge over Blue Creek

Bridge Replacement - Construct a 2-lane 100-foot three span prestressed concrete girder bridge with shoulders.

Winter 2022/23

 

Humphreys Co. - Tatum Lane bridge over Blue Creek (off of East Blue Cr Rd)

 

Bridge Replacement. The proposed structure will be a two span pre-stressed concrete structure, with a proposed alignment shift of twenty-one feet to the east. The project will also include utility relocation

 

Fall 2022

 

Humphreys Co. - Weed Lane, Bridge over Blue Creek (Off of East Blue Cr Rd)

 

Bridge replacement       

 

Spring 2023

 

Humphreys Co. - SR 230 over Hurricane creek and Overflow (Toward Bold Springs)   

 

Bridge replacement

Active Completion Date: summer 2023

 

Humphreys - Tumbling Creek Rd, bridge over Tumbling Creek       

 

Bridge Replacement. Construction of a 2-lane 140-foot three-span prestressed concrete girder bridge with shoulders.          

 

Spring 2023

 

Humphreys - Cedar Grove Road over Hurricane Creek (west of Loretta Lynn's Ranch)

 

Bridge Replacement. The proposed bridge is to be a three-hundred (300) feet long, three (3) span concrete beam bridge with an out-to-out width of twenty-five (25) feet three (3) inches. The proposed grade of the bridge will be approximately one (1) foot higher than the existing structure and the exiting centerline will be maintained.   

 

Spring 2024

 

Humphreys Co. - I-40 Bridges over Buffalo River & Squeeze Bottom Lane

 

Bridge replacement

Winter 2022-2023

 

Humphreys Co. - Crockett Murphree Lane, (Mile Marker 145 - Bridge over I-40)  

 

Bridge Replacement      

 

Summer 2024

 

Hickman - SR-230 (between Bucksnort and Nunnelly)      

 

Bridge replacement

"Active Comp Date 6/30/23"