DAVIDSON COUNTY, I-65 Bridge Repair over Wedgewood Avenue  

·         Look Ahead - Friday, April 9 at 8PM, through Monday, April 12 at 5AM,  I-65 southbound will be closed from the downtown loop (I-65/I-40 split) to I-440. Interstate traffic will be detoured on I-40 to I-440. The I-65 southbound off-ramp to Wedgewood Ave will be closed, but the Wedgewood Ave on-ramp to I-65 southbound will remain open. Wedgewood Avenue will be closed under I-65.

 

·         Look Ahead - Friday, April 16 at 8PM, through Monday, April 19 at 5AM, I-65 northbound will be closed from I-440 to the downtown loop (I-65/I-40 split). Interstate traffic will be detoured on I-440. The I-65 northbound off-ramp to Wedgewood Ave will be closed, but the Wedgewood Ave on-ramp to I-65 northbound will remain open. Wedgewood Avenue will be closed under I-65.

 

 

DAVIDSON COUNTY, Improvements on I-65 northbound ramp to Harding Place

·         Nightly, 8PM-5AM, There will be lane closures on I-65 northbound for construction activities.

 

DAVIDSON COUNTY, Interstate Sign Repairs

·         Thursday, March 25 through Sunday, March 28, 8PM-5AM, There will be lane closures on I-65 southbound at MM 86 to make sign repairs.

·         Thursday, March 25 through Sunday, March 28, 8PM-5AM There will be lane closures on I-40 in both directions at MM 208-209 and MM 210-211 to make sign repairs.

 

DAVIDSON COUNTY, Interstate Sign Repairs

·         Thursday March 18 and Friday, March 19, 12AM-3AM, The ramp from I-24 westbound to I-65 southbound (MM 44-45) will be closed for approximately two hours for sign installation.

DAVIDSON COUNTY, Sign Installation on I-24

·         Nightly 8PM-5AM, There will be alternating nightly lane closures on I-24 in both directions near exit 47A for installing barrier wall and demolition of the median wall. Two lanes will remain open at all times. There will be an alternating ramp closure on the ramp to exit 47A (I-24 WB) for foundation drilling and installation of the foundation from Woodland St to I-24 WB. At least one ramp lane will remain open at all times.

 

DAVIDSON COUNTY, Interchange Improvements on I-24 at Hickory Hollow Parkway

·         Nightly, 8PM-5AM, There will be intermittent lane closures on I-24 in both directions for construction activities at MM 60.

 

DAVIDSON COUNTY, Construction of Pedestrian Facilities on U.S. 70S (SR 1) from SR 251 (Old Hickory Boulevard) (LM 7.85) to Erin Lane (LM 8.30)

·         Daily, 9AM-3PM, There will be a lane closure for construction work.

 

DAVIDSON COUNTY, Widening SR 112  (Clarksville Highway) from SR 155 to SR 12

·         Daily, 9AM-3PM, There will be lane closures for construction activities.

 

DAVIDSON and RUTHERFORD COUNTY, I-24 SMART Corridor

·         Nightly 8PM-5AM, There will be intermittent lane closures on I-24 between MM 55-80 for construction activities.

·         Saturday, March 27, 5AM-11AM, There will be mobile lane closures to layout median barrier foundations between MM 53-80.

 

MAURY COUNTY, On-Call Concrete Repair on SR 396

·         Daily, 9AM-3PM, There will be a lane closure on SR 396 (Saturn Parkway) near Port Royal Road for concrete repair.

·         Friday, March 26 through Monday, March 29, 8PM-5AM, The ramp from Kedron Road to SR 396 will be closed for concrete repair.

 

MONTGOMERY COUNTY, Sidewalk Construction on SR 13 (LM 23-26)

·         Daily, 5AM-11AM, There will be a lane closure for construction work.

 

MONTGOMERY COUNTY, Widening on SR 149 and SR 13/48

·         Daily, 9AM-3PM, There will be intermittent road closures for blasting activities on SR 13 and 149 near the Cumberland River.

 

RUTHERFORD COUNTY, Resurfacing on I-840 Including Concrete Repairs

·         Friday, March 26 at 7PM through Monday, March 29, at 5AM, The exit ramp from I-840 westbound to SR 102 (Almaville Road) will be closed for concrete ramp replacement (MM 47).

 

RUTHERFORD COUNTY, Widening SR 266 (Jefferson Pike) from SR 102 (Nissan Drive) to I-840

·         Daily, 9AM-3PM, There will be lane closures for construction activities. 

 

SMITH COUNTY, SR 25 Rockfall Mitigation

·         From now through September 2021, SR 25 north of the SR 80 intersection is reduced to one lane for a rockfall mitigation project.

 

WILLIAMSON COUNTY, Bridge repairs on Duplex Road (SR 247) over I-65

·         Daily, 8AM-3PM, There will be temporary lane closures for construction activities.

 

WILLIAMSON COUNTY, Resurfacing on US 31 (SR 6) from Hillview Lane to Country Road

·         Daily, 8:30AM-3PM and Nightly, 8PM-5AM, There will be a lane closure for resurfacing work.

 

WILLIAMSON COUNTY, Construction of Mack Hatcher NW Quadrant

·         Daily, 9AM-3PM, There will be a lane closure on SR 96 between Front Street and Boyd Mill Ave for road widening activities.

 

WILLIAMSON COUNTY, Widening SR 96 Between Arno Road and SR 252 (Wilson Pike)

·         Daily, 9AM-3PM, There will be a lane closure on SR 96 for clearing and construction activities.

 

WILSON COUNTY, Widening I-40 from SR 109 to I-840

·         Friday, March 19, 8PM-5AM, There will be a lane closure on I-40 westbound for striping work at South Hartman Drive.

 

WILSON COUNTY, The repair of the bridge over Jug Creek on SR 266

·         Through June 2021, The roadway is reduced to one lane for bridge repair.

 

>>> MAINTENANCE & UTILITIES

 

DAVIDSON COUNTY

·         Nightly, 7PM-5:30AM, There will be a lane closure for bridge deck repair on I-40 at MM 213.

·         Monday, March 29, 7PM-5:30AM, There will be a lane closure on I-65 northbound at MM 84 for sign removal.

·         Monday, March 22, 7PM-5:30AM, There will be a lane closure and shoulder closure on I-65 from Jefferson Street to Rosa Parks Blvd for the removal of a sign (MM 84-85).

·         Sunday, March 28, 8PM-5AM, There will be lane closures in both directions on I-65 at MM 85-86 for milling and paving on the Cumberland River bridge. The I-24 eastbound/I-65 southbound ramp to I-65 southbound will also be closed.

·         Thursday, March 24, 8PM-5AM, There will be lane closures on I-65 at MM 84 for bridge deck inspection.

MONTGOMERY COUNTY

·         Monday, March 29 or Tuesday, March 30 (weather dependent), 7AM-3:30PM, There will be milling and paving operations on I-24 westbound ramp at exit 1. Traffic will be detoured on shoulder.  

 

RUTHERFORD COUNTY

·         Daily, 9AM-3PM, There will be alternating lane closures on I-840 for spot milling and paving between MM 53-61.

·         Nightly, 8PM-5AM, There will be alternating lane closures on I-24 westbound from MM 96-97 and MM 74-73.

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather. 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.