Quality Control
While you are using these documents, feel free to provide any feedback or recommendations you may have. You can email us at TDOT.EPSDesignQuality@tn.gov or fill out the Forms that is linked below.
Quality Training coming soon!
Quality Control (QC) refers to the daily processes, practices, and checks implemented to control the quality of the project development by checking the accuracy of design, plans, drawings, documents, analyses, and quantities as they are being developed. QC is expected to be completed at each Milestone deliverable by each discipline in the Preconstruction Division. It is tied to the Project Delivery Network (PDN) as indicated in Section 3.0 of the Quality Manual.
Note: Fill out this Microsoft Form if you find anything confusing or wrong or something that should be added into any of the Quality Checklist and the HQ Design Quality team will work with you to resolve your issue.
Quality Control Documents
Revised: | ||
QC Cover Sheet Form | 10/31/2024 |
Quality Control Checklist
This Page Last Updated: October 30, 2024 at 10:20 AM