SiteManager Materials

Listed below are SiteManager Quick Reference Guides  to assist users with materials window information within the SiteManger and LIMS applications.

 

MATERIAL INFORMATION
Material Category Description                                         Work Group Revision Date
Aggregates Operations Field Inspector Aggregate Testing Operations

12/06/2016

Aggregates Operations Office Staff Records of Aggregates Used Operations 12/06/2016
Aggregates Regional Materials and Tests Aggregate Testing Regional M&T 02/01/2017
Aggregates Viewing Aggregate Quality Test Results All 04/12/2017
Aggregates Quality Sample for New or Inactive Quarry All 10/16/2017
Agg/Soil Contract Proctor Samples All 02/23/2017
Asphalt Cement Asphalt Cement Verification Sampling Operations 04/12/2017
Asphalt Mix Asphalt Mix Contractor Lab Testing Operations 04/26/2017
Asphalt Mix Asphalt Mix Field Testing Operations 08/05/2015
Concrete Concrete Field Testing Operations 12/28/2015
Concrete 28-Day Cylinders Procedure for Regional Operations Staff Operations 12/28/2015
Concrete 28-Day Cylinders Procedure for Regional M&T Staff Regional M&T 12/28/2015
Concrete HQ 28 Day Acceptance cylinder procedure HQ M&T 05/26/2015
Concrete Bridge Deck Chloride Determination Sample Bridge Inspection 04/03/2017
Cast In Place Pre-Cast Cast In Place Operations 05/05/2017
Certifications T2 Certification Instructions Operations 02/16/2017
Certifications Pavement Marking Procedures Operations 09/13/2016
CMP Samples of Corrugated Metal Pipe HQ M&T 05/24/2017
CMP Reporting Corrugated Metal Pipe Regional M&T 04/20/2017
Emulsions Emulsion Verification Sampling Operations 08/25/2017
Excavation/Embankment Excavation (Embankment) Acceptance Testing

All

09/07/2017
Excavation/Embankment Excavation (Embankment) Proctor Sampling All 08/25/2017
Fence Fence Sampling Procedure Operations 08/25/2017
Geotextile Contract Approval of TYPE IV Geotextiles Operations 02/02/2017
IA Testing Independent Assurance Sample Regional M&T 07/31/2015
Mix Designs PCC Mix Import and Approval Process HQ M&T 08/05/2015
Mix Designs Marshall Mix Import and Approval Process M&T 03/13/2017
Mix Designs Viewing PS and Component Materials for Mix Designs Operations/M&T 03/13/2017
Mix Designs Linking Asphalt Mix Design to a Contract Regional M&T 04/19/2017
Prestress Prestressed Concrete Regional M&T 08/25/2017
Prestress Identify Prestressed 7 Wire Strand Regional M&T 12/22/2015
Verification Verification Samples from Concrete and Asphalt Plants Regional M&T 05/15/2017
Verification Additional info for Verification Samples of Steel Bar Regional M&T 03/03/2016

 

ADDITIONAL GENERAL INFORMATION SHEETS
Material Category Description Work Group Revision Date
Contract Set-Up Change Order Process Operations/M&T 04/27/2017
Contract Set-Up Outstanding Item Report Regional M&T 01/27/2017
Contract Set-Up Contract Activation and Generating Materials Regional M&T 04/15/2016
Contract Set-Up Sample and Test Requirements for Change Orders Items Operations/M&T 10/07/2015
Contract Set-Up Contract Finalization Operations/M&T 04/07/2017
BOE Reports This is BOE All 02/15/2017
BOE Reports BOE SM Matls and Tests Folder Details Operations/M&T 04/24/2017
BOE Reports PCC designs and linked contracts All 04/05/2017
SiteManager Changing and Voiding Incorrect Sample Records All 02/16/2017
SiteManager Correcting Completed Sample All 08/05/2015
SiteManager Using the Find Samples Window All 01/21/2016
SiteManager Viewing materials and tests linked to a contract item All 07/24/2017
SiteManager Viewing Test Results in the Maintain Sample Info window All 02/15/2017
SiteManager Sort or Filter by Contract All 06/22/2016
SiteManager Verify Products from a QPL Supplier are Approved All 10/31/2016
SiteManager/LIMS Using the Review Tests and Review Sample Windows Filter All 12/06/2016
SiteManager/LIMS Using the View Only Sample Information Window All 02/03/2016