CPM Schedules

The Critical Path Method (CPM) focuses on the relationship of the critical activities, specifically those which must be completed before other activities are started. Working from the project's beginning and defining individual project tasks and the number of days to perform each task, a logical diagrammatic representation of the project is developed. A CPM depicts which tasks of a project will change the completion date if they are not completed on time. Because of the size and complexity of most projects, this method is most often applied using a computer software program.

In accordance with Section 108.03(C) of the Standard Specifications, a computerized CPM schedule is required from the contractor when the project duration is greater than 24 months, or when it is required by Contract.

Training materials and resources on CPM schedules are located at the bottom of this page.


Within the Construction Division, both at Headquarters and regionally, there are Power-Users who have access to CPM software and advanced knowledge in CPM schedules. These Power‐Users are available as a resource to provide assistance (such as running reports or checking the TIA) as needed.

Power-User Contacts

Headquarters
TBD
Phone: 615.741.2414
Email:
Region 1 (Knoxville)
Douglas Tarwater
Phone: 865.594.0354
Email: Douglas.Tarwater@tn.gov
Region 2 (Chattanooga)
Jeremy Shoemaker
Phone: 931.456.7216
Email: Jeremy.Shoemaker@tn.gov
Region 3 (Nashville)
Sarah Leather
Phone: 615.451.5824
Email: Sarah.Leather@tn.gov
Region 4 (Jackson)
Jacob McKinnis
Phone: 731.855.7822
Email: Jacob.McKinnis@tn.gov

Training

Training Manual: How-to for Reading, Understanding, and Using CPM Schedules (without Direct Primavera Access)

Resources

Specification

Circular Letter

Forms

Form 108 03(C)(1)  Baseline CPM Schedule Review Checklist

Form 108 03(C)(3)  CPM Schedule Update Checklist

Letters

108 03 - CPM Schedule Acceptance Letter

108 03 - CPM Schedule Request Additional Information Letter

108 03 - CPM Schedule Rejection Letter