RMSI Update
Tuesday, January 02, 2018 | 10:35pm
A portion of Riverbend Maximum Security Institution is back up and running with boiler-produced hot water and heat. The portable units will be taken offline as the boiler-produced heat takes over. At this time it appears that a valve malfunction was responsible for the loss of pressure. The Department expects that the entire facility will be back on boiler-produce in the next 48 hours.