The latest project information - including news releases, videos, and construction schedule, and lane closure activity - will be provided on this landing page. For other detailed information - including Overview, Timeline, Public Involvement, Frequently Asked Questions, and Contacts - please select the corresponding pages from the dropdown menu for this project.

To view all TDOT-produced I-440 videos, see the links provided below or visit the TDOTnews YouTube Channel, I-440 playlist.

Upcoming Schedule - Updated September 3, 2019

Schedule information is tentative and subject to change. To check current traffic conditions and/or to view traffic cameras, please visit www.TNsmartway.com.

 

I-40 to Hillsboro Pike 

  •     New traffic patterns to place traffic on newly constructed inside lanes and create work zones on the existing outside lanes.
  •     Drainage Operations to install new underground storm drainage on the outside lanes.
  •     General Grading operations (subgrade finishing and cement mixing – day shift and night shift)
  •     Asphalt paving operations (night shift)
  •     Asphalt grinding operations (day shift)
  •     Bridge Deck Repairs at I-440 over Charlotte Ave and I-440 over CSC Railroad.
  •     Installation of Roadway lighting and bridge underdeck lighting (day shift)
  •     Ramp Reconstruction at Murphy and West End Ramps

Hillsboro Pike to I-65 

  •     New traffic patterns to place traffic on newly constructed inside lanes and create work zones on the existing outside lanes
  •     Off-roadway activities in construction yards at I-65
  •     Concrete crushing operations in temporary yard near Hillsboro Pike.
  •      General grading operations (subgrade finishing and cement mixing – day shift and night shift)
  •      Asphalt paving operations (night shift)
  •      Asphalt grinding operations (day shift)
  •      Concrete median barrier operations (day shift and night shift)
  •      Installation of Roadway lighting and bridge underdeck lighting (day shift)
  •      Grading and Paving operations to install temporary ramp detours for Phase II (night shift)
  •     Temporary Striping for Phase II Traffic Switches
  •     Ramp reconstruction at Hillsboro Pike ramps.

I-440 Bridges over I-65

  •         Interchange closure scheduled the weekend of September 20
  •         Bridge Substructure Column and Cap Erection below I-440 (day shift and night shift)
  •          Use of Gantry crane on I-440 bridge to assist operations (day shift and night shift)
  •          Demolition of existing bridge edge-of-deck (night shift)
  •          Steel girder delivery and erection of new steel girders (day shift and night shift)

I-65 to Nolensville Pike 

  •         New traffic patterns to place traffic on newly constructed inside lanes and create work zones on the existing outside lanes
  •         General grading operations (subgrade finishing and cement mixing – day shift and night shift)
  •          Storm Drainage installation operations at I-440/I-65 Interchange in ramp gores (day shift and night shift)
  •          Asphalt paving operations (night shift)
  •          Concrete Median Barrier operations (day shift and night shift)
  •          Ramp reconstruction at Nolensville Road ramps            

Nolensville Pike to I-24 

  •          Off-roadway activities in construction yards at I-24
  •          Concrete Crushing operations (day shift)
  •          General grading operations (subgrade finishing and cement mixing – day shift and night shift)
  •          Storm Drainage installation operations
  •          Concrete Median Barrier operations (day shift and night shift)