2018
IB 18-01

REGARDING REVISED ROADWAY DESIGN GUIDELINES SECTION 4 – CONSTRUCTION PLANS

VOIDED BY INSTRUCTIONAL BULLETIN 19-11

01-29-18
IB 18-02

REGARDING REVISED DISTRIBUTION LISTS AND FORMS

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

01-29-18
IB 18-03

REGARDING REVISED SECTION 6 – GENERAL AND SPECIAL NOTES

VOIDED BY INSTRUCTIONAL BULLETIN 19-03

01-29-18
IB 18-04

REGARDING TURN-IN DATES AND LETTING SCHEDULES FOR 2019

VOIDED BY INSTRUCTIONAL BULLETIN 18-08

01-29-18
IB 18-05

REGARDING REVISED SECTIONS 1-400.00 ROAD RECONFIGURATION AND 1-500.00 ROAD DIET

VOIDED BY INSTRUCTIONAL BULLETIN 22-09

03-06-18
IB 18-06

REGARDING NEW STANDARD DRAWINGS FOR GUARDRAIL MAINTENANNCE - ONLY PURPOSES

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

03-15-18
IB 18-07

Regarding New Section 9 - Multimodal Design

VOIDED BY INSTRUCTIONAL BULLETIN 20-17

04-26-18  
IB 18-08

REGARDING TURN-IN DATES AND LETTING SCHEDULES FOR 2019

VOIDED BY INSTRUCTIONAL BULLETIN 19-08

06-21-18
IB 18-09

REGARDING REVISED STANDARD DRAWINGS - CATCH BASINS

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

06-21-18
IB 18-10

REGARDING REVISED AND VOIDED STANDARD

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

06-29-18
IB 18-10

REGARDING REVISED AND VOIDED STANDARD

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

06-29-18
IB 18-11

REGARDING SNOWPLOWABLE RAISED PAVEMENT MARKERS, RUMBLE STRIPS, RUMBLE STRIPES, AND TABLE 4-3 OF THE ROADWAY DESIGN GUIDELINES

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

10-10-18
IB 18-13

Regarding New Roadway Design Guidelines Chapter 1 - General

VOIDED BY INSTRUCTIONAL BULLETIN 19-09

12-21-18
     
2019
IB 19-02

REGARDING TDOT ACCESSIBILITY GUIDANCE OF ROADWAY DESIGN GUIDELINES SECTION 9, SUBSECTIONS 9-300.00 TO 9-301.03

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

01-31-19 
IB 19-03

REGARDING REVISED SECTION 6 – GENERAL AND SPECIAL NOTES

VOIDED BY INSTRUCTIONAL BULLETIN 19-13 

01-31-19
IB 19-04

REGARDING NEW STANDARD DRAWINGS FOR DR11S AND EXISTING RD01 DRAWINGS

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

02-15-19
IB 19-05

REGARDING NEW AND REVISED STANDARD DRAWINGS FOR MULTIMODAL DESIGN

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

02-15-19
IB 19-06

REGARDING REVISED SECTION 6 – ONE CALL NUMBER

VOIDED BY INSTRUCTIONAL BULLETIN 19-13

02-15-19 
IB 19-07

REGARDING NEW AND REVISED STANDARD DRAWINGS FOR MARKING DETAILS FOR EXPRESSWAYS AND FREEWAY INTERCHANGES AND A NEW 36" SINGLE SLOPE CONCRETE BARRIER WALL

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

02-15-19 
IB 19-08

Regarding Turn-In Dates and Letting Schedules

DELETED AFTER 2020 DECEMBER LETTING

03-08-19
IB 19-09

REGARDING UPDATES TO ROADWAY DESIGN GUIDELINES CHAPTER 1

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

07-11-19
IB 19-10

Regarding Chapter 10 – Index of Standard Drawings Release

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

07-24-19
IB 19-11

REGARDING REVISED SECTION 4 – PAVEMENT MARKING

VOIDED BY INSTRUCTIONAL BULLETIN 20-05

08-01-19
IB 19-12

REGARDING NEW AND REVISED STANDARD DRAWINGS FOR GUARDRAILS

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

08-01-19
IB 19-13

Regarding Chapter 9 Release and Update to Signing and Utility Notes

VOIDED BY INSTRUCTIONAL BULLETIN 20-11

09-20-19    
IB 19-14

UPDATE TO REGIONAL SIGNING EMPLOYEES AND CONSTRUCTION/LETTING REVISION DISTRIBUTION TABLES

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

09-20-19
IB 19-16

Interstate Resurfacing Signing Notes

VOIDED BY INSTRUCTIONAL BULLETIN 20-11

10-25-19  
IB 19-17

REGARDING REVISED DESIGN EXCEPTION REQUEST AND DWSIGN WAIVER REQUEST

VOIDED BY INSTRUCTIONAL BULLETIN 20-03

10-29-19
IB 19-18

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

11-05-19
IB 19-20

Regarding Chapter 1 Update for ITS Plans at R.O.W. Phase and Preliminary Estimate Submittals

VOIDED BY INSTRUCTIONAL BULLETIN 20-14

12-09-19
IB 19-21

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

12-06-19
IB 19-22

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

11-21-19
IB 19-01

Regarding Signatures on Title Sheets

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 19-15

Release of Work Zone Design Deviation Form

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 19-19

Regarding Update to Table 4-2

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
2020
IB 20-01

Regarding Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

11-22-19
IB 20-02

Regarding Various Revised and Voided Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

12-12-19
IB 20-04
Regarding Turn-In Dates and Letting Schedules 03-03-20
IB 20-06

REGARDING FINANCIAL PLANS

VOIDED BY INSTRUCTIONAL BULLETIN 22-09

03-03-20
IB 20-07

Regarding Update To Regional Signing Employees And Construction/Letting Revision Distribution Tables

VOIDED BY INSTRUCTIONAL BULLETIN 22-09

03-27-20
IB 20-08

Regarding Various Revised and Voided Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

03-20-20
IB 20-09

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

04-08-20
IB 20-10

Regarding Various Revised Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

04-29-20
IB 20-12

Regarding Revised Natural Stream Design and Concrete Median Barrier Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

05-07-20
IB 20-15

Regarding New and Revised Work Zone Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

05-15-20
IB 20-16

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

09-10-20
IB 20-21

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

11-13-20
IB 20-22

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

12-18-20
IB 20-03

Regarding Chaper 2 - Geometric Design Criteria Release

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-05

Regarding Revised Section 4 - Pavement Marking

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-11

Regarding Chapter 9 Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-13

Regarding Chapter 4 - Preliminary Release

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-14

Regarding Chapter 1 Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-17

Regarding Chapter 3 - Multimodal Design Release

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-18

Regarding HQ State Railroad Coordinate Email

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-19

Regarding Chapter 2 - Earth Work

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 20-20

Regarding Record-A-Comment Sign

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
2021
IB 21-03

Regarding Turn-In Dates and Letting Schedules

VOIDED BY INSTRUCTIONAL BULLETIN 22-01

01-31-19 
IB 21-08

Regarding Various Revised Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

03-31-21
IB 21-12

Regarding Revised MM Standard Drawings and Roadway Design Guidelines - Chapter 3

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

07-22-21
IB 21-13

Regarding Various Revised and New Standard Drawings Includes Chapter 5 Update

VOIDED BY INSTRUCTIONAL BULLETIN 22-03

08-10-21
IB 21-21

Regarding Signatures on Title Sheets

VOIDED BY INSTRUCTIONAL BULLETIN 22-12

11-15-21
IB 21-01

REGARDING CHAPTER 5 – RIGHT-OF-WAY RELEASE

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-02

REGARDING CHAPTER 6 – CONSTRUCTION RELEASE

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-04

Adding Env.CulturalResources@tn.gov to letters and submittals

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-05

REGARDING CHAPTER 5 – TEMPORARY CRASH CUSHION ITEM NUMBER

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-06

NPDES Terminal Note Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-07

Chapter 1 Updates

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-09

Chapter 2, regarding when Structures and Geotech personnel will provide calculations for the foundation quantities associated with retaining walls

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-10

Chapter 1 Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-11

Chapter 1 Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-14

Chapters 1 Update for Title Sheet Note and Distribution Table

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-15

Chapter 2 Update for Driveways

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-16

Chapter 5 Federal Land Tracts

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-17

Regarding Various Revised, New and Voided Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-18

Regarding Chapter 7 - Item Numbers Release

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-19

REGARDING CHAPTER 2 – Geometric Design Criteria

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 21-20

Regarding Various Revised, New and Voided Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
2022
IB 22-12

Regarding Signatures on Title Sheets

VOIDED BY INSTRUCTIONAL BULLETIN 22-13

06-10-22
IB 22-01

Regarding Turn-In Dates and Letting Schedule

VOIDED BY INSTRUCTIONAL BULLETIN 23-01

05-03-23
IB 22-02

Regarding Chapter 2 - Traffic Warrant Signals

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-03

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-04

Regarding Earthwork

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-05

Regarding Chapter 3 – Multimodal Pedestrian Crossings and Crosswalk Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-06

Regarding Update to Chapter 4 CSX Air Easement Update

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-07

Update to Chapter 7 – Item Numbers Regarding Computations for Double Bituminous Surface Treatment (DBST)

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-08

Regarding Chapter 2 – Geometric Design Revisions Due to The New Highway System Access Manual

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-09

Regarding Various New and Revised Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-10

Chapter 2 - Geometric Design
Chapter 3 - Multimodal Design
Regarding Roundabout Guidance

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-11

Regarding New and Various Revised Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-13

Regarding Signatures on Title Sheets

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-14

Regarding Updates to Chapter 7 of the Roadway Design Guidelines

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-15

Update to Chapter 9 General and Special Notes
Regarding Signing Notes and Erosion Prevention and Sediment Control Special Notes
Regarding Streams, Wetlands, and Buffer Zones

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 22-16

Regarding Updates to Chapter 4

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
2023
IB 23-01

Regarding Turn-In Dates and Letting Schedules

VOIDED BY INSTRUCTIONAL BULLETIN 23-06

05-03-23
IB 23-02

Update to Chapter 7 - Partial Concrete Repair Item

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-03

Regarding Various Revised and New Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-04

Regarding Various Revised and New Standard Drawings and Revised Chapters 5, 7 and 10 of the Design Guidelines

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-05

Update to Chapters 2 and 3 - Road Diet Guidance Manual 

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-06

Regarding Turn-In Dates and Letting Schedules

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

01-25-24
IB 23-07

Chapter 5 and Chapter 9 Update Regarding CGP Requirements

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-09

Chapter 3 Updates

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-11

Regarding New, Revised and Voided Standard Drawings

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-13

Update to Chapter 7 - Guardrail Removal Item

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-14

Regarding Roadway Design Guidelines Release of Chapters 1 and 2 for PDN

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
IB 23-15

Update to Chapter 7 - Cold Planning Bituminous Pavement

VOIDED BY INSTRUCTIONAL BULLETIN 24-10

10-31-24
2024
                                                                                                                                                                                                 
     
     
     
2025
     
     
     
     
     

If you find any mistakes, missing information or have a question, contact: