Skip to Content

State of Tennessee Real Estate Asset Management


Post Date:
  May 13, 2013
Submittal Deadline:
  May 28, 2013

If you are interested in the project described below:
1. Review the Designer Selection Process.
2. Register with the Office of the State Architect. All Designer's must be registered and updated annually
    in December.  Click on Register and choose the option "Update My Registration" and follow the
    directions to review and update.
3. Download the instructions included in the Designer Letter of Interest.
4. Complete the document specifically for the project in which you have interest.
5. The response should be no more than four pages (do not include photographs).
6. Attach the completed Designer Letter of Interest Form to the appropriate email link.

User Agency:
  Department of Military
Project Title:
  Selmer RC Reroof and Facility Update
    Selmer Readiness Center
Project Location:
  Selmer, McNairy County, Tennessee
Project MACC
  $480,700.00
Project Contact:
  Phil Hill
    (615) 313-0826
Project Overview: 
 

The project will remove the existing ballasted 60 mil EPDM roof system, wet or damaged rigid insulation, barrier board and all discovered damaged metal deck from both structures. The building and roof were constructed in 1993. The roof is in poor condition, and has openings and deteriorated flashing and active leaks. Significant gutter issues and leaks are present at the perimeter. The project will construct a new modified bitumen roof system with suitable substrate, insulation, flashing and trim, wood nailers and blocking, deck repair where required, and address all other roofing components of gutters, downspouts and other items, for a complete watertight, warranted system.  Project includes repair or replacement of damaged interior items, such as walls, doors, floor coverings, light fixtures and ceiling tiles, and addresses mold removal as needed. Project also includes exterior repairs to the rough surface brick veneer, with cleaning, tuck-pointing, caulking and sealing, new control joints or other recommended actions, replacement of unserviceable flues and vents, removal of abandoned rooftop equipment, installation of below grade drainage, repairs and reglazing of windows, repairs to lintels, openings and sills as needed. Openings in poor condition will be corrected. Designer shall furnish engineering data, perform explorations as needed, complete design computations, furnish drawings and technical specifications, and provide cost estimates in support of this project. Designer shall follow all aspects of the State Building Commission’s Designer’s Manual in the execution of this project. 

Special Design or Submission Requirements:  
  • Jackson Region Designers are preferred for this Jackson Region Project, but Memphis region designers will be considered
  • Submit Designer Letter of Interest
  • Must have licensed architects and engineers in the State of Tennessee. Must be capable of providing expertise in areas indicated.
Anticipated SBC Approval Date:
  July 11, 2013
Anticipated Designer Notice to Proceed (NTP) Date:
  September 23, 2013
Anticipated Project Bid Date
  June 18, 2014

             Design or       
          Submission
       Requirements:   Designer Letter of Interest                             

Please fill out the Letter of Interest and click HERE to submit the document.