Skip to Content

C. 2011 Hay Storage

2012 Program Information Will Be Posted by April 1, 2012

Livestock/Acreage Minimum Requirements
Property
Premises
Registration
Certifications
Cost Share Maximum
Cost Quote
Cattle - 30 Head*
Goats/Sheep - 50 Head*
Hay - 50 Acres
Applicant
Owned
Required for livestock producers
BQA - Beef and Dairy
Standard
35%
Master
50%
Required

                       *Head is the actual number, regardless of age or sex at date of application.
                    You can combine goats and sheep to meet 50 head minimum requirement.

PROGRAM GOALS: Improve quantity and nutritional quality by using proper storage and management

Application Period:
CLOSED

Reimbursement Deadline:
May 1, 2012
Guidelines: use application A to apply, pages 15 - 16 in printed application, application A instructions
Eligible Items
  1. New structures and additions to existing structures with no more than three walls
    a. New structures must be a minimum       
        size of 900 square feet. A loft or 2nd   
        level will not be considered in the total 
        square footage of the structure.
    b. Minimum height – 14 feet high 
        clearance for new structures and   
        additions
    c. Use of structure must be for hay   
        storage only
  1. Site Preparation - site must be well drained; cost of elevated pad construction is eligible, clearing of land is not eligible
  2. Roof - metal, shingles, or a polymer coated fabric (e.g., Cover- All, Clear Span, Super Structure, etc.)
  3. Flooring - recommended but not required; 4- 6 inches of gravel on geotextile fabric is eligible for cost share
  4. Labor conducted by a contractor; reimbursement for labor cannot exceed 30% of total reimbursement. Labor provided by applicant or their employees is not eligible.
Requirements Hay Storage Examples
  1. Application must include a project budget with a COST QUOTE from each vendor.
    • Material and labor costs must be
      separated on quote.
    • Each cost quote needs to include the
       name, address and phone number of 
       contractor or supplier.
    • Cost quotes must be on company
       letterhead or signed by company
       representative. The budget provided 
       will determine the exact amount of
       cost share allocated for the project.
       See the Project Budget Work Sheet.
  1. Hay storage structures must conform to the minimum requirements and guidelines of the University of Tennessee Extension Service.
    UT Hay Storage Facility Construction Guidelines
    UT Agricultural Building and Equipment Plan List
  2. Hay storage structures must be built on applicant owned land.
Ineligible Items
  1. Cost of clearing land
  2. Renovations of existing structures
  3. Labor provided by applicant or their employees
  4. Concrete Flooring
  5. Completely Enclosed Building - no more than three walls
  1. Doors - walk through and drive through
  2. Used materials are not eligible for reimbursement
 
For additional information call 1-800-342-8206 or email hay.storage@TN.gov
Eligibility
Requirements
Application
Rules
Application A
Materials
Premises Registration